Update of cryogenic activities

Slides:



Advertisements
Similar presentations
Thierry RENAGLIA / Ramon FOLCH FP420 Manchester Workshop December 2006 FP420 Connection Cryostat Mechanical Design & Construction Key capabilities of CERN.
Advertisements

LS1 Status Report – 116 th LHCC Frédérick Bordry 4 th December 2013.
O. Pirotte, A.Perin, TE/CRG, 4 th LHC Splice Review, Page 2 4 th LHC Splice Review, July 22-24, 2013 O. Pirotte (TE-CRG), A. Perin (TE-CRG)
Going towards LHC Run2 CRYOGENICS 5 th Evian Workshop 2-4 June 2014 SESSION 4 - Systems 2 - Status and commissioning plans (HW perspective) Krzysztof Brodzinski.
Improved anchoring of SSS with vacuum barrier to avoid displacement Ofelia Capatina (speaker), Katy Foraz (coordinates all the activities), Antonio Foreste,
A. Perin, CERN, TE-CRG, 26 May Review of the cryogenic by-pass for the LHC DS collimators 26 May 2011 Modifications to the DFBs, DSLC and cryogenic.
Laurent Tavian Thanks to contribution and helpful discussions with M. Jimenez, V. Parma, F. Bertinelli, J.Ph. Tock, R. van weelderen, S. Claudet, A. Perin,
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Beam Vacuum Quality Control Outline  VSC consolidation  VSC support  Organization  Status Cédric Garion on behalf of TE-VSC Cédric Garion TE/VSC Beam.
Jean-Philippe Tock (TE-MSC) On behalf of the SMACC project.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
Introduction to LHC cryogenic system (layout, architecture) Preparation before cool-down (Purge, flushing) Transient operations to reach nominal operating.
Cryogenics in SPS & LHC (2 K / 4.5 K) LHC-CC11, 14 November 2011 L. Tavian, CERN, TE-CRG With the contribution of N. Delruelle, G. Ferlin & B. Vullierme.
Cryogenic update before Fermilab meeting (and after the helium tank review) Coordination meeting 6 th May 2015 K. Brodzinski HiLumi-LHC-CC-Cryo-PPT-18_v1.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
MP3 recommendations from June 2013-Feb 2014 Arjan Verweij on behalf of the MP A. Verweij, LSC meeting 7/2/2014 One of the tasks of the MP3 is.
C. Garion Presentation Outline  Overview of the inner triplet interconnections  Q1/Q2, Q2/Q3 interconnections  General view  Working conditions  Compensation.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
Special interventions Status of production and QC Nicolas Bourcey TE-MSC-MDT Fourth LHC Splice Review November 2013.
4 December 2007Sylvain Weisz - LEMIC1 Status of LHC installation.
Injectors & LHC report K. Foraz on behalf of OSS members 01/11/13LSC - EN-MEF-OSS1.
Jean-Philippe Tock (TE-MSC) On behalf of the SMACC project.
Can we change a magnet without warming-up a full arc ? Serge Claudet, With help from P. Cruikshank & J-P. Tock (Chamonix Jan’10)
Injectors & LHC report K. Foraz on behalf of OSS members 01/08/2013LSC - K. Foraz1.
D. Delikaris, TE-CRG, LSC 25th Meeting Page 2 October 18 th, 2013 LS1 Committee (LSC)- 25 th Meeting D. Delikaris, TE-CRG Cryogenics activities.
TE-CRG Activities D. Delikaris, TE-CRG.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 30/08/2013LSC - S. Baird, M. Bernardini1.
A. Perin, TE/CRG, DFBA LSC Page 2 LHC Long Shutdown 1 Committee June 14 th, 2013 A. Perin (TE-CRG) On behalf of the DFBA splices consolidation.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
LHC CRYOGENICS – new experience of run with increased beam energy and intensity Krzysztof Brodzinski CERN, Geneva, Switzerland With contribution from:
LHC Machine Advisory Committee Meeting no.19 QRL status 16 June 2006 G. Riddone, AT-ACR On behalf of the QRL team.
A. Perin TE-CRG, 06 April LMC 08 April 2009 Consolidations related to pressure protection on DFBs and DSLs A. Perin, TE-CRG.
5-year operation experience with the 1.8 K refrigeration units of the LHC cryogenic system G. Ferlin, CERN Technology department Presented at CEC 2015.
LHC schedule status K. Foraz EN-MEF 12/04/2013LSC - K. Foraz1.
LHC Cryogenics, equipment & interventions around P3/P7 S. Claudet, “volunteer” for TE_CRG 16 Oct’14.
Bruno Vullierme Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 1 CRAB CAVITY INTEGRATION CRYOGENICS INSTALLATION.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
L. Tavian, TE/CRG, LSC Page 2 February 21 th, 2014 LS1 Committee (LSC) L. Tavian TE-CRG.
TE-CRG Activities A. Perin, on behalf on the Cryogenics Group.
LHC Performance Workshop LS1 Session Cryogenic system: strategy to achieve nominal performance and reliable operation J. Bremer, K. Brodzinski, J. Casas,
Crab Cavity Technical Coordination meeting:
K. Foraz on behalf of OSS members
IT-4189 Supply and installation of a cryogenic distribution system
SMACC Tenth report [15 min] 13/09/2013
LEP cryostat Procurement strategy and plans
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
K. Foraz on behalf of OSS members
CRG-TM: LS1 projects review
SPS cryogenic proximity equipment and SM18 validation
Cutting and welding First internal LHC Dipole Diode Insulation Consolidation Review 10 Oct 2017 G. Favre / A. Amorim Carvalho G. Favre EN-MME.
The LHC - Status Is COLD Is almost fully commissioned
LS1 Committee January 24th, 2014
CRYOGENICS – strategy, unavailability root causes and limitations
Long Shutdown for the LHC: Vacuum Beam Pipes
Nikolaos TRIKOUPIS on behalf of TE-CRG-CI CRG-TM for LS2 preparation Preliminary activities of the CI section 25/09/2017
Comparison between 1) HL-LHC BASELINE: Q5 at point 6 at 1
Preparation of the activities for the LHC Long Shutdown 2
Consequences of warming-up a sector above 80 K
Keeping LHC cold during LS periods Preliminary proposal
Activities of the ME section during LS2 ( )
Overview & baseline of LS2 and roadmap for CRG
Status of the cryogenic system for B180
K. Foraz on behalf of OSS members
LHC installation status
Shortening the long RQF/RQD busbar segments in points 1 and 5
Presentation transcript:

Update of cryogenic activities September 13th, 2013 LS1 Committee (LSC) Update of cryogenic activities L. Tavian TE-CRG

Content Update on: QRL compensator bellows DFBA gimbal bellows Major overhauling Various consolidations

The faulty equipment (QRL Line C) Internal ply damage (S45, 14R4) External ply damage (S78, 10R7) Witzenmann DN100 multi-ply bellows compensators (4 plies of 0.3 mm)

QRL Line C compensator x-rays status

Repair plan for QRL compensators Welding of the first compensator started in S81!

Line E and F compensator: FE model C. Garion

Conclusion of FE model C. Garion

The faulty equipment (DFBA) Calorstat DN120 multi-ply gimbal bellows (2 plies of 0.2 mm) DFBAK shuffling module: Internal ply collapsing

DFBA gimbal bellows status for all DFBAs Endoscopic inspection through line M interconnects Thanks to MSC for early opening of M sleeves ! Statistics (total 32 bellows all inspected): 3/32 (9.3 %)

Pictures of the damaged bellows: DFBAF &DFBAI DFBAF lower gimbal DFBAF lower gimbal DFBAI lower gimbal DFBAI lower gimbal

In situ access by cutting the end door: possible solution Gimbal patching (Rigid assembly) Questions/issues: Very limited space to cut/weld the door Cutting and welding of beam pipes to be done in very difficult position Leak tests of beam pipes? Extreme very difficult work positions Safety to be assessed Thanks for EN-MME contribution!

Repair options In situ repair Workshop repair Gimbal position Lower DFBAF & I Upper DFBAK Gimbal patching ++ + +++ Gimbal replacement Splice disconnection / reconnection N/A - Safety for equipment Safety for personnel Probability of success (patching) > 80 % < 50 % 100 % * Probability of success (replacement) Repair time (patching) [week] 6-10 15 Repair time (replacement) [week] 15 to 23** *: without 6 kA splice work uncertainty **: spare delivery time (13-14 week)

Repair strategy 0/ Validate the patching scenario Done for the DFBAK (upper gimbal)  acceptable force of +/- 500 N for +/- 4 mm of displacement Still to be done (in the coming days) for DFBAF & DFBAI (lower gimbal) 1/ Start with one lower gimbal in-situ repair (DFBAF or DFBAI)  “easier” case 2/ Validate the disconnection & reconnection of 6kA splices 3/ depending of 1/ and 2/ experience return, decide on DFBAK repair (in-situ or in workshop)

Major overhauling Compressors Motors

LS 1 Major overhaul of LHC compressors Done : 26 % In progress : 42% To be done : 32 %

Major overhauling Corrective maintenance within expectation! Scratches on rotors Scratches on sleeve bearings Corrective maintenance within expectation! Scratches on slide valve Recovery of new equipment!

On site maintenance

DFBX current lead controls Flowmeter rack and Piping in UL14 (IP1 L)

Leak on refrigerator cold boxes Cold box P8 : leak on LN2 circuit on the precooler HX Cold box P6 : leak on LP circuit on SS/ALU transition (DN400) Cold box P2 : leak on MP circuit on HX collector Repairs foreseen by end of 2013 !

Conclusion QRL compensator bellows: DFBA gimbal bellows: X-ray is progressing well (~4 sectors done)  Statistics are presently encouraging (1 additional damaged bellows found) Repair of the first compensator (S81) has started. If statistics remains low, the repair is compatible with the present sector pressure test schedule. What about Line E/F compensators? X-rays on a sub-sector (~8 compensators) are OK but FE simulation shows a potential risk. DFBA gimbal bellows: Endoscopic inspection completed  3 damaged bellows. In-situ repair via patching could be envisaged for DFBAF and DFBAI (displacement forces to be measured in the coming days) In-situ repair of the DFBAK is not validated (technical and safety issues). Workshop repair required a risk assessment of the splice disconnection/reconnection operation. Resource and schedule still to be consolidated. Major overhauling of compressors and motors is on track. Ramp-up of the on-site maintenance must be carefully followed. DFBX current lead controls consolidation and cold-box leak repair are progressing well