Terminals and Transport Interchanges

Slides:



Advertisements
Similar presentations
- European CDM - To benefit from the animation settings contained within this presentation we suggest you view using the slide show option. To start the.
Advertisements

Airside Capacity Enhancement
Airport Planning and Design
AMG 1204 Airport Management By Zuliana Ismail, 2010.
Project title: HEATHROW, WHAT AN AIRPORT! Author(s) of the project: Simona Petrescu Sept.2013.
Burbank Bob Hope Airport Replacement Terminal and Opportunity Site Development October 28, 2013.
1 Denver International Airport Ken Greene Deputy Manager of Aviation Airport Operations June 10, 2014.
Lecture 4: Landside By: Zuliana Ismail.
CVE 312 TRANSPORTATION ENGINEERING. INTRODUCTION Teaching Approach & Grading Policy Course Outline  Introduction to Transportation Engineering  Modes.
Terminal Design. Some thoughts from Mark Day (LEX)… Expansions are greatly limited based on the initial configuration. Similar comments to planning must.
Workshop on Infrastructures Key research to solve mobility barriers Claude Dumoulin Bouygues Travaux Publics (France) reFINE core team Industrial Technologies.
Airport Planning Issues International Conference on Modern Airport Management Steven Urlass Office of Airports National Planning Division.
9. Customs and Immigration - 1 This includes all documentation required for international flights arriving or leaving the State, i.e. to do with passengers.
Air Transportation A Management Perspective
AIRPORT A complex of runways and buildings for the
8/15/2015 IENG 471 Facilities Planning 1 IENG Lecture 16 Warehouse Operations – Facility.
SLC Overview SLC Evolution Operations Statistics and Fee’s AVI Park and Wait Lot 2002 Winter Olympics UTA Light Rail Project New Technology & Ideas Landside.
ICRAT 2004 IMPACT OF FUTURE GENERATION AIRCRAFT IN AIRPORT OPERATIVITY
AMG 1204 Airport Management By Zuliana Ismail, 2010.
ENGAGE THE ELITE.  Indira Gandhi International Airport is the primary International Airport of the National Capital Region of Delhi, India  IGIA is.
SeaTac International Airport ITS Initiative ITS America 2007 June 4-6 Session 24 Hicham F. Chatila, PE, PTOE.
LA GUARDIA AIRPORT: AN ANALYSIS OF AIRPORT EXPANSION AND ACCESSIBILITY Dennis Levene.
Airport Security and Operations Management Post 9/11.
Presented to: By: Date: Federal Aviation Administration Environmental Best Practices Air Quality Issues 2010 Hershey Conference Maria Stanco, AEA Environmental.
Kelowna International Airport 2010 Development Program September 17, 2007.
TAMs – Total Airport Management Systems
ENGAGE THE ELITE.  Indira Gandhi International Airport is the primary International Airport of the National Capital Region of Delhi, India  IGIA is.
The LFS Private Terminal One chance to make a first impression.
Lecture 3: Air Traffic Control Tower
Vehicle Flow. Homework Ch 3 # 1,4, 7, 15 Vehicle Flow How do vehicles operate in the system –capacity –speed –headway –density.
The Transformation Journey of Bahrain International Airport Mohamed Yousif Al Binfalah Chief Executive Officer Bahrain Airport Company.
Lecture 6: Airport Financial Management
Aeronautical Facilities The term aerodrome refers to any area of land or water designated for the arrival, departure, movement and servicing of aircraft.
Airport master planning for infrastructure development Gabriel Hyde.
An inside look at Airport Design
Lecture 4: Landside By: Zuliana Ismail.
COCHIN INTERNATIONAL AIRPORT LIMITED 1. CIAL-A PATHBREAKER Cochin International airport, the country’s first Greenfield airport built under public private.
The Importance of Transport to Business 1. Connect various stages of production and distribution channels 2. Facilitate localization 3. Provide more.
MAKE A BOOKING To book a U.S Airport Concierge service, complete your flight details below. For any problems or enquiries, please do not hesitate to call.
September, 2015 YQ Fulfilment. YQ Preposition a global network of specialist airport meet & assist service partners 1.
Federal Aviation Administration 1 Safety and Certification Conference January Tarmac Diversion Plans Federal Aviation Administration Prepared for:35.
AGTA Spring Conference 2011 LOOK INTO THE FUTURE-- PLANNING FOR THE NEXT 5-YEARS AT OAK Joan Zatopek, Senior Aviation Project Manager Aviation Planning.
The Cost-Effective Airport Concept Frankfurt, 4th February 2014.
DESIGNING FACILITYLAYOUT OF ISLAMABAD DOMESTIC AIRPORT.
Airport Security Norman Ashford,H.P.Martin Stanton. Clifton A.Moore, Airport Operation, pp , 1997.
By Henry Ogoye Head of Corporate Planning and Strategy 9 th December 2013 Investment Opportunities- KAA.
H IGHWAY Pavement Structure  Sub grade: is usually the natural material located along the horizontal alignment of pavement and serves as the foundation.
Airport In come and Expenses Forecast
Aeronautical Facilities
Door to Door Travel Model
WELCOME TO SWISSPORT.
Duncan Clark Director, Strategic Development
Groundside Operational Opportunities Zurich Airport
Airport. What is an AIRPORT? An airport is a facility where passengers connect from ground transportation to air transportation. It is a location where.
Planning for a New Airport in Thessaloniki, Greece
Stansted Transformation Programme Overview
Transportation, Distribution, and Logistics
Transportation Research Board
Urban Land Use (chapter 21)
Airport engineering.
Arrivals09:41 Please do not leave your baggage unattended.
Urban Land Use (chapter 21)
Airport Service Charges
Kabinkový systém electrically powered - 2kW continuous
EMMANUEL MENANTEAU CEO of Cambodia Airports. EMMANUEL MENANTEAU CEO of Cambodia Airports.
Comparative Visualization
Special Assistance Consultative Committee March 8th 2018 Start – 10:00
Airline and Airport Procedures Baggage Handling and Control
Maritime Visit to the Port of Barcelona
Presentation transcript:

Terminals and Transport Interchanges

Contents Airport passenger terminals Landside function Airside Functions Aircraft and Apron Requirement Bus and coach station Railway stations Trans and light rail

Contents Space standards Security Border controls General legislation Intermodal relationship Commercial opportunities Terminal operator’s requirements Transport operator’s requirements

Airport passenger terminals Airport terminal planning Airport terminal capacity and size Important factors Constraints on building form Ownership of terminal Type of traffic Level organisation Centralised or decentrailsed Hub terminal baggage handling Hub terminal types Aircraft docking, terminal or remote

Landside function Arriving at or leaving the terminal by car or public transport Quantities to be assessed Typical space calculation based on 2000 originating passengers/hour Waiting in landside public concourse Quantity factors to be assessed Typical space calculation based on 2000 terminating passengers/hour Checking-in, with or without baggage Typical space calculation based on 2000 originating passengers/hour: central check-in Pre-departure security check Typical space calculation

Airside Function Immigration check Quantities to be assessed Typical space calculation based on 2000 originating passenger/hour Airside public concourse Typical space calculation based on 2000 originating passengers/hour Gate holding areas Baggage reclaim Typical space calculation based on 2000 terminating passengers/hour Inbound customs clearance Space calculation based on 2000 terminating passengers/hour General security considerations

Aircraft and Apron Requirement Baggage handling Loading bridges Apron servicing

Bus and Coach Stations Vehicle Factors affecting size of station Number of bays to be incorporated Vehicle approaches to the bays Facilities for passengers Facilities for staff Facilities for vehicle maintenance Joint company use

Railway Station Dimensional standard for railway

Trams and Light Rail Chicago airport subway station