Collaboration Board Summary

Slides:



Advertisements
Similar presentations
WDS Status Propose to create 6 sub-collaborations Propose to create 6 sub-collaborations Sub-collaborationSummary of Task 1Proton DriverDefinition of critical.
Advertisements

EURO EURO 1)Welcome 2)Status of negotiations and GA 3) “ of Consortium Agreement 4) “ of website, mailing lists, logo, etc 5)Management Structure 6)Bodies.
CFS TIME SCHEDULE EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
Paul drumm; 1 st December 2004; PM&TB Report 1 Project Management & Technical Board Reports.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
Collaboration Board Summary Alan Bross MICE CM 26.
K. Long, 26 June, 2015 Phase II: introduction to discussion Background (reminder) Responses Assumptions Presently planned bids Input to summary table Summary.
Alain Blondel Neutrino physics in Switzerland collaborate among ourselves and in Europe to ensure a rich programme collaborate in T2K leading role in GLACIER,
Alain Blondel MICE VC 9 september 2010 Spokesmouse report o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May.
Collaboration Board Summary K. Long, 27 June, 2015.
Proposal for a Constitution for MICE A Plan for Discussion P Dornan G Gregoire Y Nagashima A Sessler.
Alain Blondel MICE Funding Agency Committee MICE status report Most of the technical progress has been covered in the open session except the.
Spokesmouse’s News Agenda: o VC 22nd April o 12th-13th May posters for EPAC (Vittorio Palladino) o VC 20th May o VC 17th June o CM27 (RAL) 7th-10th July,
MICE CM39 Alain Blondel CB report 1 Report from the MICE collaboration board.
MICE CM Alain Blondel 1   MICE GOALS OF THE MEETING Welcome to MICE CM28.
21 August 2006P Dornan - After ISS1 Discussion  NuFact Talks Comments  Report 1 st Draft Oct – 60 Pages per WG Finalise before end of the year.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Proposal submitted 2 nd May 2007 “Approved” ~ beginning August 07  highest mark ever.
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
MICE Collaboration meeting (CM20) At RAL 10 – 13 Feb 2008 AFC Magnet – Status and Progress W. Lau, Oxford University.
The time line Autumn 2011CERN Council initiated an update exercise to the European Strategy for Particle Physics which was approved by a special Council.
The European Strategy Group (ESG) The remit of the ESG is to establish a proposal for an Update of the medium and long- term European Strategy for Particle.
1 MICE CM28 Schedule & Risk Comment Schedule reconstruction and management The ‘straight to Step IV’ discussion How a schedule meeting can work Risks (and.
Norman McCubbin1 Report from the Collaboration MICE Project Board (CMPB) Norman McCubbin Director, Particle Physics Department MICE/UKNF Oversight Committee.
MICE VC Alain Blondel 30 August MICE VC 103 MICE news -- see Malcolm's news for an inventory. -- great funding news all summer from USA! (phase.
CARE Steering Committee and Dissemination Board R. Aleksan CARE Steering Committee Paris, April 11, Introduction.
Spokesmouse’s News Agenda: o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May o VC 17th June o CM27 (RAL)
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
ECFA Chairman’s report T. Nakada EPFL. New members Romanian members ratification on by the ECFA members – R/PECFA member: Dr. Calin ALEXA,
MICE VC Alain Blondel 1 MICE NEWS MICE VC 161 Agenda Overall schedule Magnetic field mitigation review Status of things.
MICE CM 29 Collaboration Board Summary. Agenda 1.Intro 2.Approval of minutesBooth/Bross 3.Spokeʼs remarks & EB reportBlondel 4.PM reportNichols 5.US magnet.
ECFA European Committee for Future Accelerators Report from the chairman M. Krammer HEPHY, Vienna, Austria November 8, 2014RECFA UK1.
Paul Drumm, cm10, 27 Oct 2004 MICE Project Report Paul Drumm Collaboration Meeting 10 Rutherford Appleton Laboratory October 2004.
MICE FAC open session Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
MICE VC Alain Blondel MICE News 9 March 2005 we did not succeed in preparing a good enough I3 proposal for EU on neutrinos. Problems were.
Muon Collider R&D Co-ordination MCTF. INTRODUCTION 2 2 Steve Geer MUTAC REVIEW April 2007 BNL Steve Holmes, March 13 th, 2007: “ … MCOG ask the NFMCC.
MICE VC Alain Blondel 1 1. MOM is now Victoria 2. Linda Coney is new MICE Online Group coordinator (rep Jean-Sebastien) May we held.
MICE CM32 Goals of the Meeting Alain Blondel 1 WELCOME TO MICE CM32! – Goals and Status - Many thanks to Victoria Blackmore, Stefania Ricciardi and Mary-Elizabeth.
PId (ToF, CKoVI, EMCAL) V. Palladino et al MICEVC Frascati & Fermilab test beams in July Analysis in progress: MICE PID PhConf 4, 31 Aug aiming.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
MICE – Video conference Alain Blondel, 17 December   MICE selected NEWS: Future meetings Safety review Study of controls Gateway I & Toward Gateway.
ECFA - European Commitee for Future Accelerators Tatsuya Nakada – EPFL, Switzerland– prepared for CERN September Council presented by.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
1 How the Muon Ionization Cooling Experiment Found a Home MICE hall at RAL in Spring
MICE, Uni-Geneva and the transnational access to MICE (MICE-TNA)
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
The MAP 3-Year Plan Mark Palmer Fermilab September 26, 2014.
CONNECTIONAL MINISTRIES REACHING FURTHER WITH THE GOSPEL BY SHARING THE LOAD.
Comments on the February DOE Review
MICE CM28 Engineering Session Summary (On behalf of Wing)
Status of the MICE Construction Project
Updating the Regulation for the JINR Programme Advisory Committees
Accelerator R&D for Future Neutrino Projects
The European Strategy for Particle Physics
MICE CM31 Schedule summary
Alain Blondel 11 October 2010 GDR NEU2012 summary
The Way Forward ISS to IDS
MICE PM Report Progress with the Infrastructure A few problems
European Detector R&D: AIDA
Process of the 2nd update of the European Strategy for Particle Physics FCC week, 29 May 2017, Berlin Sijbrand de Jong, President of the CERN Council (slides.
Report on EUCARD WP6: MICE Transnational Access (TA)
Report from ICFA neutrino panel
OFFICE OF THE CITY CLERK SEPTEMBER 22, 2014 CITY COUNCIL MEETING RESCIND RESOLUTION NO AND ADOPT A RESOLUTION ESTABLISHING THE RULES GOVERNING.
PARIS21 - League of Arab States
IUPAP Neutrino Panel.
Strategy
A High Intensity Neutrino Oscillation Facility in Europe
Review plan of the nature reporting – update 6
Preliminary Project Execution Plan
Presentation transcript:

Collaboration Board Summary Alan Bross MICE CM 27

Collaboration Board – CM26 Agenda: Intro Approval of minutes Booth Spokeʼs remarks & EB report Blondel PM report Nichols Common Fund Long NSF Update Hanson SB report Palladino October CM Tsenov Alan Bross MICE CM - RAL July 10, 2010

Alan Bross MICE CM - RAL July 10, 2010 Spokesmouse Spokesmouse Report MICE PROJECT BOARD (new version) will take place September 23 Running MICE: concentrating on data taking. MICO agenda has been modified to account for emphasis on beam-line tuning. Missing one MOM in November. Shift taking Policy AB will draft a proposal. All authors have a shift responsibility, but burden accounted for by institution. NOTE: Running 24/7 with the number of authors we currently have means about 3 shifts/author/month Open issues: Accounting for MOM shifts, BLOC, etc. Not necessarily a consensus on this point at the moment. Extra Shift taking as a way of fulfilling common fund responsibility was rejected. IN-KIND CONTRIBUTIONS Alan Bross MICE CM - RAL July 10, 2010

PM Report

Alan Bross MICE CM - RAL July 10, 2010 Andy gave a report summarizing status of scheduling update, and engineering integration From TB discussion: Alan Bross MICE CM - RAL July 10, 2010

Could aim for Step IV in 2012, say Q2

Spectrometer solenoids – what I’ve picked up this week: September 2010 – complete diagnosis of current lead problem December 2010 – complete the written recovery plan (Worst Case) December 2010 - ?? Arrival of magnet #1 (and 2?) further discussion..... Believe a sufficiently robust recovery plan could get us Step IV in early 2012 EMR, diffuser and solid absorbers are off critical path (for now)

Common Fund

Income and expenditure: Issues: Recovery of unpaid contributions

Estimate: 2009/10 estimate: Reasonable for present financial year (2010/11)?

180 £k

Alan Bross MICE CM - RAL July 10, 2010 ECFA Ken reported on presentation to ECFA review panel For future large infrastructures for neutrino oscillation experiments Alan Bross MICE CM - RAL July 10, 2010

Community consultation; steps taken: EUROnu: Concept explained to Management Board Welcomed proposed review panel Concept presented to delegates at EUROnu costing w/s, CERN, 15/16 March 2010: Positive reception Note: Formally, EUROnu reports to the Strategy Session of CERN Council: So, if the review of the IDR and EUROnu interim reports is deemed to be a success and the process moves on to the review of the RDR and the EUROnu final reports, it will be important that the review is included as part of the Strategy Session of CERN Council reporting process IDS-NF Concept explained to Steering Group Proposed review panel was welcomed Comment: Ensure review panel is manifestly international Concept presented to IDS-NF plenary meeting, FNAL 08—10 April 2010 Neu2012 (NA in EUCARD IA) Concept presented by T. Nakada to Neu2012 community

Issues: ECFA intention is that review panel shall be: International: European initiative; but international in scope and influence Composed of internationally recognised leaders in the field Not sufficient for this to be the intention, nor sufficient even for it to be true in practice, unless: The international community recognises the panel as international and ‘heavy weight’ i.e. essential that there be ‘buy in’ from: International neutrino community; ‘Stakeholders’: e.g. laboratory and funding-agency directors Implies: Care in establishing principle with stakeholders prior to launch of initiative Broad consultation to define composition of panel: Including appropriate cross membership (e.g. ICFA, ACFA, …)

Towards the terms of reference: Noting the timescale defined by the Strategy Session of CERN Council, the ECFA review panel will: Receive IDS-NF IDR and EUROnu interim report, supported by appropriate presentations from the proponents Review and comment on the IDS-NF IDR: The robustness of the physics case; The specification of the baseline for the Neutrino Factory; The analysis of cost and schedule presented in the IDR; and The plans of the IDS-NF collaboration for the RDR. Review and comment on EUROnu interim report: The strengths of the super-beam, beta-beam, and Neutrino Factory facilities The development of baseline super-beam and beta-beam facilities; The plans of the EUROnu collaboration for the completion of the study. Report to ECFA: Also to ICFA etc. if successful in forming such partnerships

Alan Bross MICE CM - RAL July 10, 2010 NSF Update NEWS: Mississippi MRI Request Approved ($1.6M). For MICE RF Alan Bross MICE CM - RAL July 10, 2010

Alan Bross MICE CM - RAL July 10, 2010 Speaker’s Bureau Vittorio reviewed the status of Talks Abstracts, etc Although we missed a few meetings – Good representation at iPAC10 & Neutrino 2010 Coming UP ICHEP10 LINAC 10 NuFact 10 Alan Bross MICE CM - RAL July 10, 2010

To be held at the Bankya Palace Spa Hotel October CM October 3-8, 2010 – Sofia To be held at the Bankya Palace Spa Hotel 1st Annual MICE Bowling Tournament Bring Your Shoes Alan Bross MICE CM - RAL July 10, 2010