? ENDCAP: Mechanics IFIC-Valencia.

Slides:



Advertisements
Similar presentations
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Advertisements

1 David Santoyo Petal Locking Points: AUW Nov 2014 Petal Locking Points.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
1 David Santoyo Petal meeting: 24 October 2014 Petal vs Services: design concerns.
SLHC - WP7 Barrel UPDATE on LAYOUT OF SERVICES AT THE BARREL ENDS OPTO PCBS: Sketches describe options after discussion with Tony Weidberg ( ) Preference.
ATLAS SLHC UPGRADE ENGINEERING – LIST OF DECISIONS which will affect the design of auxiliary systems layout and routing BASIC LAYOUT FOR BARREL and WHEELS.
SLHC Pixel Layout Studies S. Dardin, M. Garcia-Sciveres, M. Gilchriese, N. Hartman LBNL November 4, 2008.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
FVTX Review, November 16th, FVTX Mechanical Status : Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
1 Outer Barrel, Phase 2 Mech Review 26 Aug 2013, indico: Antti Onnela, CERN Tracker Phase 2 Mechanics Review, 26 August 2013 Status of the Outer.
End-of-stave region. 2 Space Z-dimension is critical –Keep gap small (might help getting rid of stubs) Edge of last barrel silicon (at corner) is 1277.
Simon Kwan - FermilabCMS Tracker Upgrade Workshop – June 3, Update on the Phase 1 FPIX Half Disk Design Simon Kwan Fermilab on behalf of the USCMS.
Alpine pixel layout Integration progress Teddy Todorov For the ATLAS-LAPP group AUW Integration meeting 20/11/2012.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
SiD Vertex Detector Mechanical R&D (May Apply to Other Concepts) Bill Cooper Fermilab.
IBL Mock up Mounting procedure V.2 François-Xavier Nuiry Simon Feigl
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
C.BAULT November 9 th  LAYOUT STRAWMAN 07V13 Vs STRAWMAN 07V14  SERVICES AND STRUCTURES INVENTORY  ENVELOPE SERVICES  BARREL SERVICES ROUTING.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
PH/DT2 Scientific Tea PH-DT2 Scientific Tea, 29 April 2005 : The CMS Tracker - Mechanical Aspects Antti Onnela, PH-DT2: 1. CMS Tracker and.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
1 David Santoyo sLHC OXFORD 17/06/2010 EC Structure Review ? ? ? ? ? ? IFIC-Valencia.
Prototype Review 04-Sept Different side-closeout to allow petal end-insertion concept…self- guided… Only backup from last review in July…
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
Tapes and Integration of Powering (endcap) Pepe Bernabeu (IFIC) Valencia/UK - Experience and future collaboration on staves/petals, June 17 th 2010.
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
LumiCal High density compact calorimeter at the ILC Wojciech Wierba Institute of Nuclear Physics PAS Cracow, Poland.
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
Upgrade plans for ATLAS. Nigel Hessey (Nikhef) is overall ATLAS upgrade coordinator.
13 May 2011 Eddy Jans 0 Plans for the VELOpix-module LHCb-Nikhef discussion some specifications some requirements some ideas about the VELOpix-module some.
Development of a low material endplate for LP1 and ILD Dan Peterson, Cornell At previous meetings, , showed the carbon fiber molded.
EC: 7 DISK concept Preliminary considerations
Straw man layout for ATLAS ID for SLHC
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
FPIX Mechanical Design & Module Development
ATLAS Internal ID Service Integration
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
Alignment of the CMS Tracker
Summary LBNL LSWG meeting
Update of MVD services and requests
Strip Petals: Local supports and prototype tests
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
July 2, 2007 ID CERN S. Terada KEK Module and Service Structure Designs -Super module conceptual design- - FEA thermal analyses- -Test of angled.
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
Micro Vertex Detector of PANDA Strip Detector
Layout of Detectors for CLIC
Mechanics: (Tim).
Constructional requirements from ITk-Strips
C.Clerc ILD session, ALCPG /03/2010
LumiCal mechanical design, integration with LDC and laser alignment
Services Layout – Update
Integration issues at IHEP
WG4 – Progress report R. Santoro and A. Tauro.
SIT AND FTD DESIGN FOR ILD
Work packages status in Torino and perspectives
Design and fabrication of Endcap prototype sensors (petalet)
Pixel Detector System (Barrel & Forward)
Inner DET. Integration Inner detector envelope Radial clearances.
Setup for testing LHCb Inner Tracker Modules
Presentation transcript:

? ENDCAP: Mechanics IFIC-Valencia

Petal Concept: Components Petal mass estimation Mass (g) Facings + Honeycomb + Epoxy 227,9 POCOFOAM 50,6 SS Pipe   73,4 SMC 95 CGL 60 Bus Cable + Epoxy 85,3 Silicon 107,5 Chips 12,4 Hybrid + BeO + Epoxy 116,5 Total 828,6

Petals: Sensors Overlap and Dimensions Rout: 958mm 205 - 280mm Silicon Rout: 951mm Overlap Rout: 3mm Silicon Rin: 334.5mm Overlap Rin: 3mm 80mm Rin: 327mm

Petals: Sensors Overlap and Dimensions Rout: 958mm 215 - 280mm Rout: 11mm Silicon Rout: 951mm Overlap angle: 12mrad ATLAS PROJECT DOC No: Utopia V1.0 N.P. Hessey Silicon Rin: 334.5mm Rin: 4mm 90mm Rin: 327mm

Disks: Sensors Overlap Y Rin: 4mm Disk rotation is not allowed by this design X Overlap angle: 12mrad (as example) Disk could be reflected 180º (plane XY) No Disk overlap; symmetry is maintained by sensors on both petal sides on every Disk and therefore Petals are reduced 11mm at Outer radius. With Disk overlap symmetry is maintained by only sensors on one Petal side on every Disk. Rout: 11mm 11.25º 11.25º

Short Strips on rings 4 & 5 8 6 2x10 4x8 4x6 2000 μW/mm2 1700 μW/mm2

Thermal Runaway 8 6 2x10 4x8 4x6

How does layout affects to Petals? 3 different Disks and 4 different Petals Covering from R325 up to R950mm Similar distances between disks 120mm clearance to barrel and pixel 1 different Disks and 2 Petals shapes Covering from R336 up to R951mm Different distances between disks; different petal insertion. 60mm clearance to barrel and less than 20mm to closest pixel disk

CF Inner Cylinder Apertures on Outer cylinder to permit services exit 8 support bars constrain disks Inner cylinder with 4 different diameters to constrain disks and sustain petals Master disk supports entire structure

CFRP-KOREX Disks 1.- Master Disk + Support bars + Inner cylinder 2.- Disks are assembled into the structure.

CF Frames

Lateral Support Beams

Services Support Rings

(4/16) Rows of Petals: Insertion

(4/16) Rows of Petals: Services and Testing 40 petals from 160 (25%)

(12/16) Rows of Petals: Insertion

(12/16) Rows of Petals: Services and Testing

Outer Cylinder Rails: EC Insertion

ENDCAP Envelope

Services: cabling Capillaries Services estimation includes: Opto fibers x18 HV cabling x18 LV cabling x2 Inlet and Outlet capillaries DCS x18 Al service channel Capillaries Total per petal (g/mm)   0,39502609 Total per Disk (g) Services Disk 1: from z: 2956mm to z: 1376mm 19972,5192 Services Disk 2: from z: 2956mm to z: 1476mm 18708,43571 Services Disk 3: from z: 2956mm to z: 1744mm 15320,69194 Services Disk 4: from z: 2956mm to z: 2141mm 10302,28047 Services Disk 5: from z: 2956mm to z: 2791mm 2085,737765 Total 5 Disks (g) 66389,66509

Accessible area after services 40 petals from 160 (25%) +12 (32,5%) +12 (40%) 1.4m

Services Connections 2D-Layout: conflictive area MANIFOLDING CONNECTIONS: AREA 3 CONNECTION POSSIBLE? IF NOT DIF. PIPES PER DISK 1.4m

Next Steps: Electrical Services, SMC, connectors Petal insertion - 3points support

Next Steps: F.E.A. Disks & Rings

Next Steps: 3D Layout Services Connectors or dif. Pipes? Pressure Losses admissible? Manifold X4? X5? 3D Layout Services

Next Steps: Mechanical Tests SETUP Deflections Modal test All possible information to check F.E.A Thermal Test / Electrical prototype? CO2 cooling plant Thermal camera CMM o Vision CMM?