1. Neighborhood Safety Program 2. ICS traffic and security 3

Slides:



Advertisements
Similar presentations
Louisiana Safe Routes To School Program
Advertisements

Ladd Arboretum Multiuse Trail Council Presentation Monday, March 10, 2014 Suzette Robinson, Director of Public Works Homayoon Pirooz, P.E., Assistant Director.
City of Toledo Bancroft Street Neighborhood Public Meeting November 20, 2013.
Welcome to the Plumb Lane 2 nd Community Workshop November 28, 2011.
Borough of Madison Samson Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Federal Aid SRTS Application Reconstruction.
Facilities Master Plan 2013 Update Presentation to ADCO by CWU Campus Development Committee March 14, 2013.
Dowling Associates, Inc. Combining Pedestrian Plans & ADA Transition Plans Combining Pedestrian Plans and ADA Transition Plans Gail Payne Dowling Associates,
City/University Projects Fund Calendar Year 2012 Budget Request.
Building Innovative Facilities for a Multimodal Future 2014 BICYCLE MASTER PLAN UPDATE FINAL PUBLIC REVIEW Baltimore City Department of Transportation.
Virginia Street Corridor Plan. From our Tier One University, world renowned recreation and our Midtown entertainment area to abundant cutting edge business.
Slide 1. Slide 2 Introduction How did you get to school as a child?
Pinehurst School Traffic Safety Pinehurst School Traffic Safety Meeting January 27-28, 2015.
Virginia Street Bus RAPID Transit Extension Presentation to RTC July 17, 2015 Project Purpose Extend RAPID to UNR Improve pedestrian safety & access Create.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Master Plan Update Chapter 213 of the Local Government Code provides that Cities may engage in Comprehensive Planning which may:  include but not be limited.
Northeast Ohio Areawide Coordinating Agency Kamm’s Corners Development Corporation.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Grand Canalscape Phase I: Phoenix Uptown and Gateway North Update Kerry Wilcoxon City of Phoenix Street Transportation Department Safety and Neighborhood.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
2012 CITY OF MIDDLETON SATISFACTION SURVEY WORKING DRAFT - PROPOSAL.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
Community Information Session November 3rd
1/23/20161 Traffic Calming Devices Workshop Prepared by City Engineering Department.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
South/West Corridor Transit Improvements ZARZAMORA AND MILITARY PRIMO BRT PROJECTS ENVIRONMENTAL AND PRELIMINARY DESIGN PHASE September 9, 2014 VIA Community.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
Virginia Street Bus RAPID Transit Extension City of Reno Council Meeting April 29, 2015.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
Planning Commission Meeting July 30, Presentation Outline  Project Purpose, Background and Schedule  Overview of Community Input  Overview of.
2040 LONG RANGE PLAN UPDATE Congestion Management Process Plan (CMPP) Major Update February 24, 2016.
Evergreen Highway Corridor Update Planning Commission Workshop March 22, 2016 Jennifer Campos, Senior Planner.
Mobility for all Modes Update to the Transportation Chapter of the City’s Comprehensive Plan City Council May 27,
Rock Creek East II Livability Study April 28, 2016.
Pedestrian Facility Improvement Program
Neighborhood Project Funds
Neighborhood Action Team
Rock Creek East II Livability Study
City of Charlottesville
Saving the King Street Bicycle Boulevard
Four Winds Condominium Association August 2, 2017
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Complete Streets Award Program
Project Management Team Meeting #3
Santa Cruz avenue sidewalks Project
Stanford Avenue/El Camino Real Intersection Improvements Project
The Oakton Condominium Association September 12, 2017
Public Workshop #1 August 18, 2010.
Finance Committee & City Council August 8, 2016
Arizona Conference on Roads and Streets Multimodal Cities: Addressing Issues in Transit Corridors March 24, 2016.
Introduction to Traffic Calming “vekehrsberuhigung”
Transportation Management Plan Modernization Project
Transportation Alternatives (TA) Set-aside
City of Saginaw Curb Side Leaf Collection Update
RPPP Policy and Procedures Update
4th Street / Prater Way Bus RAPID Transit Project Stakeholder Meeting
City of Wilmington Bike Plan Update
SE 12th Street Roadway Improvements February 8, 2005.
1300+ High School Seats School Board Work Session May 15, 2017
Bicycle and Pedestrian Update to City Council
Meadow Lake Boulevard Street Extension Project
Neighborhood Traffic Management Program Greenbrook Drive South
Senior Friendly Community Plan
Downtown Parking Management Plan
Transportation Management Plan Modernization Project
City Council Work Session
Transportation Advisory Staff Committee (TASC)
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
Unified Development Code
Presentation transcript:

1. Neighborhood Safety Program 2. ICS traffic and security 3 1. Neighborhood Safety Program 2. ICS traffic and security 3. HENC/6TH Street update If you have not already, please join the CHNA Facebook page so you can get automatic updates. Or check out the CHNA website.

Neighborhood Safety Program

Neighborhood Safety Program Overview The purpose of the Program is to reenergize Neighborhood Associations by empowering them to work collaboratively to address pedestrian and bicycle safety issues in Kirkland neighborhoods. The Program is funded by the voter approved 2012 Streets Levy and City Council's Walkable Kirkland Initiative. Each year there is a total of $350,000 available for projects citywide under $50,000. Projects fall into the following categories: Bicycle facility: Bike lanes or trails. Crosswalks: New crosswalks, improved crosswalk ramps (ADA), crosswalk islands, and rapid flashing beacons. Intersection Improvement: Signage, parking, and pedestrian “bump outs.” Traffic Calming: Traffic islands, speed cushions, pedestrian “bump outs,” signage, and radar signs.* Walkway/Sidewalk and Trail: Gravel trails, steps, curb, traffic delineators, and sidewalks. Street Light: On existing utility pole or installing a light new pole.

Previous NSP projects in Houghton: Street light and sightline improvement at 112th Ave/68th Street (2015) 60th street connection to the CKC (2014) Rapid Flashing Beacons for crosswalk 108th Ave and 62nd Street (2016) 68th street stairs to CKC (2015)

Project 1

Project 1

Project 2 Fire Station 22 (you are here)

Project 2

Project 3

Project 3

Project 4 ?

http://www.kirklandwa.gov/depart/CMO/Neighborhood_Services/NSP.htm

ICS traffic and security Dr. Gregory Moncada, Principal, International Community School Mr. Tim Sullivan, Campus Security Monitor

Houghton Everest Neighborhood Center 6th Street/108th Avenue Corridor Study

Northwest University Master Plan update http://www.kirklandwa.gov/depart/planning/Development_Info/projects/ Northwest_University_Master_Plan_Zoning_Permit.htm

Preliminary Project Timeline Please note that these timelines are very preliminary and will likely change September 2016: Staff Review for Completeness October 2016: Initial Public Comment Period November to December 2016: Staff Review of Project and Public Comments, Environmental (SEPA) Determination January 2017: Joint Public Hearing before Houghton Community Council and Hearing Examiner, Recommendation to City Council February 2017: City Council Consideration and Decision March / April 2017: Houghton Community Council Consideration and Decision Project Planner: Tony Leavitt, Senior Planner (425) 587-3253 tleavitt@kirklandwa.gov

PROJECT STATUS: Project is currently in review by staff for completeness. PROJECT PLANS AND KEY DOCUMENTS Vicinity Map   (PDF 567 KB) Arborist Report   (PDF 1.8 MB) Architectural Plans   (PDF 34 MB) Civil Plans   (PDF 5.1 MB) Landscape Plans   (PDF 22.7 MB) Preliminary Drainage Report   (PDF 111 KB) Project Narrative   (PDF 7.9 MB) Public Outreach and Response Report SEPA Checklist   (PDF 344 KB) Survey   (PDF 8.3 MB) Traffic Impact Analysis   (PDF 6.3 MB)

NEWS CKC Artist in Residence Installment Unveiling—Cancelled To participate, first donate costumes, masks, and accessories at Kirkland City Hall from 8 a.m. to 5 p.m. during the week of October 3 to 7. A collection bin will be in the lobby of City Hall. Gently worn costumes of all sizes - from baby to adult - will be accepted. Items should be clean and in good, wearable condition (e.g. no broken zippers, no unintentional rips or holes).   Then, complete the swap by selecting a donated costume at Heritage Hall from 10 a.m. to 12 p.m. on Saturday, October 8. Costumes not selected at the event will be donated to a local non-profit organization CKC Artist in Residence Installment Unveiling—Cancelled The neighborhood forum on 10/1 has been rescheduled to Saturday October 29th 11:00am and relocated to  Fire Station 22.  We will discuss progress on Kirkland's Stone Soup initiative and need your input on site prioritization. http://www.kirklandcert.com/StoneSoup