Ladder Assembly All tools and jigs produced Glue dispensing works

Slides:



Advertisements
Similar presentations
GATHER THE FOLLOWING SUPPLIES:
Advertisements

Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Optical Manufacturing Solutions 1 Probe Assembly.
ATLAS Module building at Glasgow
1 Short update Itzhak Tserruya HBD meeting BNL, April 11, 2006.
Hybrid assembly at Glasgow. Placing ASICs Arrange 20 ASICs in ASIC tray with strip bond pads facing outwards – ASICs to be used in ‘Cat A’ sample boxes.
Design Ash finished electric hybrid tracing to connector fields –Changes to allow for HCC-less and HCC running on one hybrid awaiting final confirmation.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Stator Plan & Schedule Chris Booth 2 nd March stators to construct for mid-April. One complete coil assembly recovered from ISIS drive. Coils recoverable.
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
MM mechanical prototype Work progress at CERN MicroMegas General Meeting, CERN, 5-6 November
IB stave assembly A. Di Mauro, C. Gargiulo, J. Van Beelen ITS-MFT mini-week
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
Purpose Power lines Equipment Assured Grounding GFCI Conclusion.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
Hybrid Integrated Circuit
Receive processed un-thinned wafers from E2V. Processed for bump bonding (dice, bump and attach read out chip)
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
NSQP MEETING Valery AKHNAZAROV January 20th 2011 ISP PP0 Board Bonding Procedure Type 1 Type 3 Type 4peek Type 4 Assembly Name: ISP ASM Parts.
Slide 1Susanne KyreTracker week, October 2005 TEC/TOB bias bonds Susanne Kyre University of California, Santa Barbara.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
M. Gilchriese Module Assembly and Attachment at LBNL M. Gilchriese for F. Goozen April 2000.
Silicon /pcb assembly R Thompson, J Freestone LAL 3 June 08.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
DOE Rev of Run IIb Sep 24-26, Detector Production WBS James Fast Fermilab.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 StaveMarco Kraan Paul Kuijer.
Fred Doherty Module Work Fred Doherty. Stave Module Building Hybrid Bonding Bonding table for the BJ820 still in workshop Modified working height of the.
Hybrid Mechanical/Thermal Design Ray Thompson / Manchester FP420 meeting Torino 11/12 July 06.
Installation Plan of VIS Ryutaro Takahashi (NAOJ) for the 4th external review on 30 June.
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
Hybrid panel heated plate study Currently the curing of the ASIC glue for the hybrid panels are done at room temperature. This is a study to determine.
David Bailey Gluing. Silicon /pcb assembly Previously Using Sony Robot and precision dispenser Have established acceptable glue dot parameters Dot electrical.
Strasbourg status Ring 7 pilot run François Didierjean.
Gluing, measuring and shearing Heated plate curing Is the process feasible? Tests with 130nm hybrids Measure resulting glue thickness Determine the shear.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
ATHENA - Module Construction P. Riedler, J. Rochet.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
News on Mechanical Design Dirk Wiedner July /4/20121Dirk Wiedner Mu3e meeting Zurich.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 1 PXD Module Assembly - Overview and SWB bumping -
On-Module Interconnection and CNM Projects DEPFET Meeting, Bonn, February Ladislav Andricek, MPI für Physik, HLL  update on thinning  samples.
B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 1 PXD Ladder Assembly - Conceptual design of jigs -
Thoughts about PS module assembly Ulrich Heintz, Meenakshi Narain, Bill Patterson, Eric Spencer, Juan Trenado Brown University, Providence 4/16/2015Heintz,
Mechanical robustness & associated tension at the DSSD slant part connection Mar-5 th 2013 B2GM KEK S. Uozumi (KNU), T. Tsuboyama, N. Sato (KEK)
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
Infrastructure & issues and solutions for ATLAS Upgrade Hybrid/Module strip bonding Fred Doherty, Joe Ashby, Fiona McEwan & Calum Gray ATLAS Upgrade Module.
BM&N STS ladders assembly in VLHEP
Stator Plan & Schedule Chris Booth 2nd March 2009
RE 4/3 RPC Pre-assembly manual 1. HCP case preparation
ATLAS pixel module assembly flow
Update on Pavia MM mechanical prototype
Ladder Assembly All tools and jigs produced Glue dispensing works
PXD Summary Tests PXD9 Pilot Production ASICs Components Plans:
nSW Alignment Installation
Gluing jigs for Demonstrator
Investigation on tray MID 063 Back
Equipment for Assembly – UK Experiences
Studies of Quad Pixel Module assembly using paper laminate
ATLAS Upgrade Module Bonding Trials Using Glass Asics
Module/Ladder Assembly
Making a simple steady hand game
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
Presentation transcript:

Ladder Assembly All tools and jigs produced Glue dispensing works Pull tests ok 9 dummy ladders assembled

Transfer on vacuum jig Modules arrive with kapton attached (tested) Vacuum jig for turning and ladder gluing Fits on top side (cut outs for switcher) Mode from microporous plate (gentle vacuum on sensor top side) Vacuum jig on sensor Screw kapton jig to vacuum jig Unscrew kapton jig from base jig

Remove base jig Turn around and take off base jig

Prepare for glue dispensing Add protective cover to be sure: module is securely held by Vacuum…

Mount on glue dispenser 2nd module is prepared the same way Glue is automatically dispensed on both modules in one step

Place modules on alignment jig bwd module 1st fwd module 2nd

Align and glue together Precision achieved: 10 µm over full length of ladder Modules are pushed together to 30µm to ensure good contact and distribution of the glue. Then they are driven apart to the nominal gap of 80µm

Add ceramic stiffeners Stiffeners are handled with a vacuum tool Glue is applied with a needle (works better than with a dispenser)

48h later…. For curing the ladder is covered and put apart After curing ladder base jig is added

Remove vacuum jigs Fix kapton jigs to ladder base jig Unscrew vacuum jig Remove ladder and turn over

Protect and store Add cover for sensors Put in transport/storage box

Pull Tests Strip pattern: breaks at > 3 kg Dot pattern weaker (~2 kg) 3 kg is considered sufficient (silicon breaks at ~3 kg) Confirmed by pull test of dummy ladder => 3.9 kg =>

Protocol Glue gap Delta z Delta x Delta h

Statistics Delta h Glue gap Ok after additional clamp Will be updated with more statistics All in µm

Problems When we glued the first ladders with electrical dummies and real modules we observed shorts in the switcher electrical lines W37_IB / W31_IF (electrical dummy) W37_IB clear_on/off, appeared during tests W38_IB / W40_IF (phase II ladder) W38_IB gate_on/off, immeadiatly W01_IB / W45_IF (2nd grade) W01_IB clear_on/off, immeadiatly All modules worked before gluing! Suspicion: damage during gluing Optical inspections: no obvious damage, no shorts by particles Analyses of nature of short: inside switcher => exclude short on Kapton, wire bonds, balcony => exclude short in matrix region (e.g. clear/source) Why only bwd? Tested W31_IF on the IB test stand => similar short observed Conclusion (with high confidence level): not due to ladder gluing, but due to test setup when the setup was dismounted and mounted again, the problem disapeard, seems it was a temporary fault

Actions Ladder gluing stopped around KW 37 Setup: malfunction of power supply (or PS control) corrupted switchter sequence (we observed that the IB DHE did load corrupted sequences) Power supplies replaced by ones with overvoltage protection (OVP) Switcher Sequence checked after loading (automatic startup sequence) This took time, but is done now. Ladder gluing can resume (after October 10, due to vacations of the operator) Impact on schedule: we can glue 2 ladders a week with one setup 2nd setup can be used interleaved, so ~ 4 ladders can be glued in a week should not be the bottleneck

Summary Module/Ladder assembly procedure defined. Tooling is designed and produced. All jigs are produced (for 80 modules & 40 ladders). Gluing with automatic dispenser tested. Pull strength ok. 9 dummy ladders assembled plain thinned silicon, plastic ‘kapton’ thinned silicon with copper, real kapton Including ASIC dummies Available: 5 outer ladders, 1 inner ladder 2 Prototype ladders produced (partially working modules) L1_X12 (W37_IB W31_IF) L2_X12 (W31_OB1 W30_OF1) 2 Production ladders produced L1_001 (W38_IB W40_IF) L1_03 (W01_IB W45_IF) Unfortunately damaged by malfunctioning test setup