Safety in Construction and Upgrade Phases

Slides:



Advertisements
Similar presentations
University Safety Office 10 Parks Road Oxford OX1 3PD Health and Safety Self Assurance Toolkit Directly.
Advertisements

2 3 There are two basic areas where there is a need to have resources available. Internal:  Financial  Personnel  Assets  Time External  Consultants.
Environmental Management System (EMS)
Safety and Health Management Program
SIEP HSE Management System
Hazard identification and Risk assessment
CHAPTER 2 – ROLES OF CONSTRUCTION PERSONNEL IN SAFETY AND HEALTH
WHS Management Plans.
Safety & Safety Documentation 2 3 Safety in three Questions Why ? Providing a safe workplace is a legal and moral obligation on every undertaking, and.
17 July 2002RSOC presentation G.D. 1 NEW SAFETY CODE A9 Origin –Revision of SAPOCO 42 document Main modifications: –Official name becomes SAFETY POLICY.
ISM Workshop 1 Independent Oversight Perspectives Michael A. Kilpatrick Deputy Director Office of Security and Safety Performance Assurance.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Staffing and Training.
Adverse Event Management from the HSE perspective E. Cennini / DGS-SEE EDMS Id Adverse events Workshop Creating a common understanding.
Health and Safety Policy
SMS Planning.  Safety management addresses all of the operational activities of the entire organization.  The four (4) components of an SMS are: 1)
Access zones and Training Steve Hutchins BE-ASR IEFC workshop 7/3/2012.
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
The organization and on-site follow up of the electrical installation work for the LHC The organization and on-site follow up of the electrical installation.
Staffing and training. Objectives To understand approaches to the development of strategies and policies for staffing of a Regulatory Authority including.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
LS2 Safety Thomas Otto, LS2 Safety Coordinator.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
M. Arnaud, C. Bedel, J. Etheridge, E. Paulat CERN SAFETY AND COORDINATION TEAM.
Last but not least : LS2 General Safety 1 Thomas Otto, LS2 Safety Coordinator for LHC Ana-Paula Bernardes, LS2 Safety Coordinator for Injectors.
ADO-PO Section Meeting Safety Activities Sigi Wenig (LEXGLIMOS) 8 September 2015.
OSHA Safety and Health Program Management Guidelines
Safety in LS1 Thomas Otto, TE DSO.
Safety Documentation Formerly an exotic unknown, today part of the work!
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Long.
Health & Safety in Construction 4A7 Design & the Built Environment John O’Connor.
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. General.
Dr. José Miguel JIMENEZ LS2 Project Leader, CERN 1 LS2 Days 30 th September2015.
1 st of April st LS2C LS2 Committee Mandate and Organization 2 Chairman:Jose Miguel JIMENEZ Deputy:Jean-Philippe.
Logo area 11 T Review: Safety and Codes Thomas Otto HL-LHC Project Safety Officer With contributions by -Frédéric Savary, Hervé Prin, TE-MSC -Carlos Arregui,
Logo area MQXF Review: Safety Thomas Otto HL-LHC Project Safety Officer With contributions by -Paolo Ferrcin and Ezio Todesco, TE-MSC -Francesca Viggiano,
Logo area MQXF Review: Safety Thomas Otto HL-LHC Project Safety Officer International Review of the Inner Triplet Quadrupoles (MQXF) for HL-LHC.
Electrial Safety LS2 days November 2016 AP
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
Cryogenic safety organisation at CERN
ALEO East Midlands Wednesday 18th January
Health and Safety Self Assurance Toolkit 2017
ISO/IEC
Health and Safety Policy
WP 3 How to assess implementation of ALARA
CHAPTER 2 – ROLES OF CONSTRUCTION PERSONNEL IN SAFETY AND HEALTH
LABOUR INSPECTION IN LAW AND PRACTICE
HSE rules & regulations
Quality Assurance applied to Accelerator Safety
Safety rules for works supervisors
(Additional materials)
Cryogenic Risk Assessment in LHC
HL-LHC Safety Assessment Process
Temporary Works Co-ordination
People Responsible For Health and Safety
Introduction In the first lesson we demonstrated the following:-
Works and Services Supervisor
GA Flight Examiners Seminar
Controlling Project Cost and Schedule
EN Safety Talks Motivation and Concept
ESS Handbook for Radiation Protection
Health and Safety Induction for Managers
DOE Review of the LCLS Project October 2006
Safety in the East Area Renovation Project
Risk Management NDS Forum June 23rd 2010.
Work and Service Supervisor
Session 11: Finance Function
Emergency & Crisis Management​ GROUP HSE RULE (CR-GR-HSE-701)
ISO 45001:2018 The importance of a Safety Management System
Presentation transcript:

Safety in Construction and Upgrade Phases Thomas Otto, Departmental Safety Officer, Technology Department CERN-ITER Workshop, 16 January 2017

CERN-ITER Worsksop 16 January 2017 Outline Scope Who is in charge ? (Safety Organisation @ CERN) Plan ahead ! Preventive Safety actions Conformity / Preventive Workplace Safety ALARA (Safety) training Scheduling VIC Summary Thomas Otto, TE DSO CERN-ITER Worsksop 16 January 2017

CERN-ITER Worsksop 16 January 2017 Scope Long Shutdown Commissioning Operation Technical Stop YETS 2015 1 EYETS 2016 2 * YETS 2017 3 LS2 4 CERN accelerator complex characterised by operation phases and maintenance / upgrade phases (Shutdowns) During Shutdowns, several upgrade projects work in parallel Thomas Otto, TE DSO CERN-ITER Worsksop 16 January 2017

CERN-ITER Worsksop 16 January 2017 Who is in charge ? Hierarchical Line Consulting Means Rules / Advice Thomas Otto, TE DSO CERN-ITER Worsksop 16 January 2017

CERN-ITER Worsksop 16 January 2017 Plan ahead* Conformity Issues Preventive Workplace Safety ALARA Training Scheduling VIC Work -7Q -6Q -5Q -4Q -3Q -2Q -1Q 1Q 2Q 3Q 4Q * Succession and duration of the preparatory phases is indicative Thomas Otto, TE DSO CERN-ITER Worsksop 16 January 2017

Two aspects of Safety Conformity Preventive Workplace Safety Equipment Process Standards (ISO, EN, Eur. Dir….) Safety Rules, best practice Inspection Hazard identification, risk assessment Report on non-conformities Safety Report, action list Make conform Apply rules and best practice Conformity marking User manual Procedure manual Training in use of equipment Training the process Safety Training Personal Protective Equipment Thomas Otto, TE DSO CERN-ITER Worsksop 16 January 2017

CERN-ITER Worsksop 16 January 2017 Conformity Issues Conformity: an item meets the essential requirements of a given (safety) standard “Equipment X is conform to Standard EN 1234” Have all relevant items inspected HSE unit inspection service Make conform, where necessary Technical measures Technical documentation and manuals Train workers Thomas Otto, TE DSO CERN-ITER Worsksop 16 January 2017

Preventive Workplace Safety Workplace Safety ascertains that a worker uses a conform equipment in a safe way Risk Assessment of relevant processes Technical experts Safety (support) officers HSE unit experts Put into place recommended actions Establish process manuals Train workers Thomas Otto, TE DSO CERN-ITER Worsksop 16 January 2017

What to consider relevant ? Equipment and tools which are Significantly modified by CERN entirely developed by CERN therefore, bear no CE marking Operations and Processes of high complexity involving unique equipment, tools, methods taking place in special environments Industry-type work by contractors is covered in PP Thomas Otto, TE DSO CERN-ITER Worsksop 16 January 2017

Documentation of Procedures Comprehensive documentation Achieve and maintain high quality Basis for technical training Facilitates the hazard and risk assessment processes Include safety-relevant messages: warnings, interdictions, use of PPE Successful example LS1 SMACC project CERN-ITER Worsksop 16 January 2017

ALARA, radiating shining example Radiation dose estimation based on preliminary work plan The ALARA dose optimisation process Based on a process description (with timing) Collaboration between executing unit and HSE-RP Optimisation of a measurable objective (dose) Other safety aspects often included: asbestos, physical constraints, … An example of successful safety prevention Thomas Otto, TE DSO CERN-ITER Worsksop 16 January 2017

CERN-ITER Worsksop 16 January 2017 Safety Training Formal Training (HSE unit) Capacities limited Plan requirements ahead Language issues must be resolved On-the-job training (Supervisor’s responsibility) For processes and equipment Allow sufficient time in schedules Thomas Otto, TE DSO CERN-ITER Worsksop 16 January 2017

Scheduling helps Safety Time pressure & stress are bad Safety advisors Keep suitable Safety margin you assure that the work can progress safely and within the planned schedule Correct Scheduling minimises co-activities Safety role of CERN’s coordination team CERN-ITER Worsksop 16 January 2017

Visite d’Inspection Commune By professional Safety Coordinator or by the “Works and Services Supervisor”* Legal requirement when engaging French contractors Coordination of co-activities Takes place shortly before intervention Too late to make important changes If not successful, delaying the start of works *GSI-WS-1, “Safety coordination for works and services” confers safety coordination to the organic unit in charge of the works / service contract Thomas Otto, TE DSO CERN-ITER Worsksop 16 January 2017

CERN-ITER Worsksop 16 January 2017 Plan ahead (reminder) Conformity Issues Preventive Workplace Safety ALARA Training Scheduling VIC Work -7Q -6Q -5Q -4Q -3Q -2Q -1Q 1Q 2Q 3Q 4Q * Succession and duration of the preparatory phases is indicative Thomas Otto, TE DSO CERN-ITER Worsksop 16 January 2017

Day-to-day coordination Clearly define roles in work area One (and only one) person with a clear mandate shall coordinate the work All work orders pass by the coordinator Avoid potentially dangerous co-activities CERN-ITER Worsksop 16 January 2017

Monitoring & feedback during execution Safety “walkthroughs” in work areas Accumulated dose reports from ALARA operations Feedback on working procedures In case of incidents and accidents: Investigation (obligatory for personal accidents with > 1 day absence) Lessons learnt Thomas Otto, TE DSO CERN-ITER Worsksop 16 January 2017

CERN-ITER Worsksop 16 January 2017 Summary CERN has gained operational Safety experience in large projects such as LHC installation Long Shutdown 1, SMACC Safety is a collaborative effort of all units Specific safety roles of Safety officers Central coordination HSE unit Thomas Otto, TE DSO CERN-ITER Worsksop 16 January 2017

CERN-ITER Worsksop 16 January 2017 Summary LS2 is the umbrella to Accelerator upgrade projects Consolidation projects Routine maintenance A Safety Framework is developed, based on Conformity & Preventive Workplace Safety Adequate (Safety) Training The (well-known) hierarchical line of Safety responsibility remains in place, with support from Projects, Coordination and HSE unit Thomas Otto, TE DSO CERN-ITER Worsksop 16 January 2017