A brief on APIRG Eng. John Tusubira Kagoro

Slides:



Advertisements
Similar presentations
AERONAUTICAL COMMUNICATIONS PANEL (ACP) TWENTY THIRD MEETING OF WORKING GROUP F WACAF/ESAF BRIEF REPORT BY OMODELE AROWOLO Cairo, Egypt 21 – 27 September.
Advertisements

1 Marinus C. F. Heijl Acting Director Air Navigation Bureau ICAO 30 March 2007 SYMPOSIUM OUTCOMES AND THE WAY FORWARD.
Briefing on APANPIRG Priorities and Targets
Regional Preparatory Workshop for the ITU WRC-2015
Agenda Item ITU WRC-15 Presented by Koos Pretorius, SACAA Regional Frequency Spectrum Workshop for ITU WRC-15 Lima, Peru March 11-12, 2013.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
International Civil Aviation Organization 5-6 MARCH 2012 AMHS/SWIM SEMINAR/WORKSHOP SP/13.
ICAO: Global Harmonization Plan
Information Management The ICAO Perspective
International Civil Aviation Organization Performance Framework for Efficiency H. Sudarshan SIP/ASBU/2012 -WP/5 Workshop on preparations for ANConf/12.
Page 1 Coordination Mechanism Between PIRGs ICAORD Dakar PIRG-RASG Global Coordination Meeting, Montreal 19 March 2013 PIRG/RASG GCM-2013/PPT-4 PIRGs Agenda.
International Civil Aviation Organization European and North Atlantic Office ICAO EUR HLSC Preparatory Seminar 9-11 February 2010 Baku, Azerbaijan Theme.
International Civil Aviation Organization Block Upgrades Next Steps & AN-Conf/12 Alexander Korsakov Air Navigation Commissioner International Civil Aviation.
APAC PBN Seminar F.LECAT (ICAO)
Session No. 3 ICAO Safety Management Standards ICAO SMS Framework
North Atlantic Systems Planning Group (NAT SPG)
Presented by the President of the Air Navigation Commission
Introduction to PBN Seminar ICAO PBN Implementation 1.
Page 1 PIRG-RASG Global Coordination Meeting, Montreal 19 March 2013 CAR/SAM Regional Planning and Implementation Group (GREPECAS) Normando Araujo de Medeiros.
State Aviation Administration The State Aviation Administration of the Ministry of Transport and Communications of Ukraine ICAO EUR Regional Preparatory.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-105/PIA2 Meteorological information supporting enhanced operational.
Page 1 A Brief on RASG-AFI RASG-AFI Chairman PIRG-RASG Global Coordination Meeting, Montreal 19 March 2013 PIRG/RASG GCM-2013/PPT-3 RASG-AFI Agenda item.
1 Vince Galotti Chief/ATMICAO 26 March 2007 A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART I FITTING THE PIECES TOGETHER.
Page 1 A brief on MIDANPIRG Hamad Alaoufi (Chair MIDANPIRG) PIRG-RASG Global Coordination Meeting, Montreal 19 March 2013 PIRG/RASG GCM-2013/PPT-2 MIDANPIRG.
Victor Kourenkov ICAO EUR/NAT Regional Officer Almaty, 5 to 9 September 2005 LEGISLATION AND ORGANISATION CONSIDERATIONS.
International Civil Aviation Organization Global Runway Safety Symposium ICAO’s Harmonization Initiatives John Illson Air Navigation Bureau 25 May 2011.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
COG/TNG contribution to LPR Implementation Language Proficiency: a safety issue St. Petersburg May 24th 2011.
European Regional Aviation Safety Group (RASG EUR)
APAC PBN Seminar F.LECAT (ICAO)
Performance Framework for Efficiency H. Sudarshan
Aviation System Block Upgrades and NAV CANADA Planning
SYMPOSIUM OUTCOMES AND THE WAY FORWARD
Workshop on preparations for ANConf/12 − ASBU methodology
AVIATION SYSTEM BLOCK UPGRADES (ASBU)
Modernising the System
Coordination mechanism between PIRG and RASG within the same region
Workshop on preparations for ANConf/12 − ASBU methodology
Agenda Item ITU WRC-15 Presented by Koos Pretorius, SACAA
Workshop on preparations for ANConf/12 − ASBU methodology
PIRG-RASG Global Coordination Meeting, Montreal 19 March 2013
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
Workshop on preparations for ANConf/12 − ASBU methodology
Global Air Navigation System ~ Planning Mechanisms ~
Briefing on APANPIRG Priorities and Targets
Performance Framework for Efficiency H. Sudarshan
SIP/2012/ASBU/Nairobi-WP/7
ALLPIRG/4 MEETING PARTICIPANTS (Montreal , 8 February 2001)
4 - 8 November 2013 AIM relevant - Assembly conclusions
Regional Preparatory Workshop for the ITU WRC-2015
TOGETHER WE CAN MAKE A DIFFERENCE
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART I
Workshop on preparations for ANConf/12 − ASBU methodology
ANConf/12 – Agenda H. Sudarshan
Mr. Kevin Lam Director of Airport Infrastructure & Air Navigation
Oceanic and International Operations
Session – 4: Existing ICAO Standards relating to Air Traffic Control
Workshop on preparations for ANConf/12 − ASBU methodology
ANConf/12 – Agenda H. Sudarshan
ASEAN PBN Routes Objectives:
Workshop on preparations for ANConf/12 − ASBU methodology
Module 1 TERMS OF REFERENCE Prosper Zo’o Minto’o
Regional Director, Eastern & Southern African Office, ICAO
AIM Global Strategy Air Navigation Procedures for AIM Seminar
AIS Manual (Doc 8126) Air Navigation Procedures for AIM Seminar
SPECTRUM STRATEGY & VISION
COSCAP – SOUTH ASIA 19th MEETING OF THE STEERING COMMITTEE
TWENTY THIRD MEETING OF WORKING GROUP F
Language Proficiency: a safety issue
Presentation transcript:

A brief on APIRG Eng. John Tusubira Kagoro PIRG/RASG GCM-2013/PPT-2 APIRG A brief on APIRG Eng. John Tusubira Kagoro Chairman of the Africa-Indian Ocean Planning and Regional Implementation Group (APIRG) Eng. John T. Kagoro is Director, Air Navigation Services in the Uganda Civil Aviation Authority. He was elected as APIRG Chairman at APIRG/10 Meeting (Ouagadougou, Burkina Faso, 2-6 August 2010) . PIRG-RASG Global Coordination Meeting, Montreal 19 March 2013

PIRG-RASG Global Coordination Meeting, Montreal 19 March 2013 APIRG: Successes Reduction of en-route longitudinal separation from 20 to 10 minutes (2002/2003) Introduction/consolidation of Sub-regional Aeronautical VSAT Networks (AFISNET in 1996, SADC1 in1998, SADC2 in 2007 and NAFISAT in 2008) Implementation of RVSM on 25 September 2008 and Strategic Lateral Offset Procedures (SLOP) in 2010/2011 Transition to NEW ICAO Flight Plan Form on 15 November 2012 Implementation of QMS for MET by some States on 15 November 2012 Implementation of ADS-C/CPDLC procedures in 8 FIRs (2006/2011) Implementation of WGS-84, 114 PBN Routes, 55 PBN Procedures (LNAV, APV), PBN STARs at 66 intl. airports and PBN SIDs at 44 intl. airports in 2010/2012 Through the SAT Interregional Group established by AFI/6 (EUR/SAM Corridor) Reduction of en-route longitudinal separation from 15 to 10 minutes with MNT (2001), RNAV/RNP routes (2001), Random RNAV routes (2009/2010), Central Atlantic FIRs Satellite Network (CAFSAT) (2001), and ADS-C/CPDLC procedures (2006) PIRG-RASG Global Coordination Meeting, Montreal 19 March 2013 PIRGS presentation-March 2008

PIRG-RASG Global Coordination Meeting, Montreal 19 March 2013 APIRG: Priorities Implementation of Performance Based Navigation (PBN) ASBU Module B0-FRTO / Metrics: Number of PBN routes implemented ASBU Modules B0-APTA, B0-CDO, B0-CCO / Metrics: Number of PBN approaches, Number of Number of PBN SIDs, Number of PBN STARs Implementation of Quality Management Systems for AIM ASBU Module B0-DAIM / Metrics: Number of States implementing QMS for AIM Quality Management Systems for MET ASBU Module B0-AMET / Metrics: Number of States implementing QMS for MET Implementation of Ground-Ground Data Link Applications (AMHS, AIDC) ASBU Module B0-FICE / Metrics: Number of States implementing AMHS using IP, Number of ATS Units with AIDC Implementation of Data Link Surveillance and Communications (ADS, CPDLC) ASBU Module B0-ASUR / Metrics: Number of ATSUs with ADS-B/MLAT capability ASBU Module B0-TBO / Metrics: Number of ATSUs with ADS-C/CPDLC PIRG-RASG Global Coordination Meeting, Montreal 19 March 2013 PIRGS presentation-March 2008

APIRG: Priorities (timelines for adoption) Aeronautical Meteorology Sub-Group (MET/SG/11) 8-11/07/2013 Aerodrome Operational Planning Sub-Group (AOP/SG/10) 5-7/08/2013 Air Traffic Management, Aeronautical Information Management and Search and Rescue Sub-Group (ATM/AIM/SAR/SG/13) 16-20/09/2013 Communications, Navigation and Surveillance (CNS/SG/5) APIRG/19 Fourth Quarter 2013 Adoption of regional priorities and performance targets based on Sub-Groups work. PIRG-RASG Global Coordination Meeting, Montreal 19 March 2013

APIRG: Roadblocks & means to address them Lack of expertise to address regulatory and operational aspects of PBN operations Implementation of a regional Flight Procedure Programme (FPP) to assist States in need Development of ICAO guidance material for PBN approvals Lack of ATC Proficiency resulting in high number of ATS incidents/Inadequate investment in staffing and training/Lack of executive support in most cases Implementation of English Language Proficiency requirements Development and implementation of training plans for ATC personnel Improvement of ATS communications and Situational Awareness in some FIRs Low level of implementation of ANSPs / Aerodrome Safety Management Systems Implementation of Safety Management Systems (SMS) by ANSPs and Aerodromes Uncertainty about VSAT Networks sustainability / Lack of commitment by some States States’ commitment to support regional VSAT networks through appropriate administrative and technical arrangements Protection of VSAT Frequency Band (C) (3.4/4.2 GHz) under ITU Radio Regulations (WRC-15 refers) Lack of sufficient resources to implement QMS for AIM and MET Inclusion of QMS for AIM and MET as priorities in States Development Plans Mobilization of resources through bilateral/multilateral cooperation PIRG-RASG Global Coordination Meeting, Montreal 19 March 2013 PIRGS presentation-March 2008

PIRG-RASG Global Coordination Meeting, Montreal 19 March 2013 APIRG: Expectations Expectations Guidelines to facilitate alignment of regional plans/programmes with Global Air Navigation Plan and ASBUs and PIRG restructuring (project oriented vs. discipline oriented structure) (AN-Conf/12 Recommendation 6/1) Coordination mechanism between PIRGs and RASGs to efficiently address common safety issues and coordinate Annual Reports to ANC/Council. Proposals for action Use all avenues to increase awareness of States CAAs on the high priority to be accorded to addressing implementation impediments through clear programmes and resources ICAO to organize a regional seminar/workshop on ASBUs prior to APIRG/19 to facilitate informed decision-making and planning processes ICAO to assist in identifying suitable specific, measurable, achievable, realistic and time-bound metrics/performance indicators, and developing harmonized data collection and reporting processes for common ASBU modules ICAO to provide PIRGs with available business cases to support effective implementation of applicable ASBU modules ICAO to consider formalizing interregional coordination /cooperation framework to ensure interoperability and harmonization of ATM across regions PIRG-RASG Global Coordination Meeting, Montreal 19 March 2013 PIRGS presentation-March 2008

PIRG-RASG Global Coordination Meeting, Montreal 19 March 2013