LIU Wire Scanner Milestones June 2017

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

SPS New Wire Scanner Mechanics Review
Matching and Synchrotron Light Diagnostics F.Roncarolo, E.Bravin, S.Burger, A.Goldblatt, G.Trad.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
TS, Length of YETS EYETS LIU & CONS Project
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
LIU-ABT systems: SPS B.Balhan, J.Borburgh, H.Day 20 th November 2015.
1 US Cost & Schedule Summary W. R. Edwards US Project Manager CD-2/3a Review January 8, 2008 BNL.
Next Steps, Priorities, Strategy for Spares Ray Veness.
P. Shanahan Nov 15, 2003 Page 1 MINOS WBS 2.3: Electronics, DAQ and Database Status Accomplishments since May review Near Detector Electronics production.
Status of the PMT light detection system Gian Luca Raselli 20-AUG-2015 ICARUS executive meeting.
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
Overview Consolidation projects for PS LIU-PS Main observable review Conclusion Acknowledgements S. Gilardoni R. Steerenberg G. Metral H. Damerau BI colleagues.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
A. BallarinoEucard, 8 th WP7 HFM Annual MeetingWarsaw,24/04/2012 High-Tc Superconducting Link Status of Task 7.5 Eucard 2012, 8 th WP7 HFM Collaboration.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
INJECTORS BLM SYSTEM: PROGRESS REPORT Christos Zamantzas on behalf of the BLM team. MSWG 28/08/2015.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
PS-LIU status S. Gilardoni – BE/ABP H. Damerau – BE/RF LIU-PT 27 Aug
Two half-day seminars on the remaining work packages to complete the MEDICIS Facility POWER CONVERTERS FOR MEDICIS Davide Aguglia & Julien Parra-Lopez.
ELENA installation progress F. Butin / ELENA collaboration.
Requirements from BI and new instruments after LS1 LHC Optics Measurement and Correction Review; B.Dehning 1 Bernd Dehning CERN BE/BI
LIU and TE/VSC activities LIU-SPS aC coating & flange impedance reduction Paul Cruikshank LIU & TE/VSC activities, 23/6/2016 Paul Cruikshank.
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
News and Introduction from CERN June 15th, 2005
LIU Wire Scanner Project
LIU – EVM status and next steps
Framework Schedule from EYETS 2016 to LS2
Beam Interlock System SPS CIBU Connection Review
CONS and HL-LHC day Analysis of needs from BE-CO
Update on the Critical Path of the PS Booster Schedule for the EYETS
STATUS OF CIEMAT CONTRIBUTION TO CTF3 ( )
Brief Status SPS Prototype PSB Prototype Installed in LS1
Wire Scanner / A.Demougeot
Installation of an Instrument on a CERN machine
Update on the VFC 8th June 2016 The VFC fan club.
LIU – EVM status and next steps
Injectors BLM system: PS Ring installation at EYETS
BI seminar agenda “Project context and Introduction to the collaboration with the HES-SO”, 10 min, Jonathan Emery, CERN “A Generic and Modular Protocol.
Working plan for 2017 Acquisition and Control Electronics
on behalf of the RF group
LIU Beam Wire Scanners: Status and plans for new SPS and PSB BWS
EC Activities Status for the LIU
BE-BI Software for LINAC4
AWAKE proposals for BE/BI
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Wire Scanner Mechanics
Status of the BI Work Package in the LIU-PSB frame
[Project Name] Post-Mortem
LIU and TE/ABT/PPE activities
PROJECT NAME POST-MORTEM
BE-CO Activities for PSB
LIU Wire Scanner Series Costs
Beam Wire Scanners (PS prototype and LIU series)
Beam Gas Ionization Monitor (BGI)
X-ray Pump-Probe Instrument
Planning Quality control - Manufacturing logbook Photos Conclusions
CONSOLIDATION CPS-BL SYSTEM
[Project Name] Post-Mortem Presentation Template
Project Name Post-Mortem
HL-LHC upgrade at IPHC news
Ch. Boccard, M. Krupa, G. Schneider, R. Veness, M. Wendt
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
LIU-SPS review for BI (no BWS)
ATS Consolidation Day 22nd May 2019 Beam Instrumentation
East Hall under construction
Measurement of the beam (transverse) emittances
Status of the BI Work Package in the LIU-PSB frame
Presentation transcript:

LIU Wire Scanner Milestones June 2017

Recent meetings with LIU on wire scanners Production readiness review for mechanics on 29/3/17 https://indico.cern.ch/event/618262/ Open issues on budget and operational precision Green-light from impedance and vacuum Wrap-up meeting for the review on 2/5/17 https://indico.cern.ch/event/573340/ Followed-up on questions raised in the review Budget issue resolved with additional support from LIU and CONS Latest data from calibration and operation with beam analysed and presented Agreed to go-ahead with mechanics series production Minutes at: https://edms.cern.ch/document/1811259/1 Meeting with BI and S.Prodon 9/5/17 Agreed on EVM implementation and budget codes

Implementation in EVM 12 LIU codes Compromise between ease of reporting for LIU and for BI Each machine has 2 codes for mechanics, 1 for control, 1 for acquisition and cables +1 code for CONS (64224) Prioritise for 2017 spending Status Codes are created and being used Spending profile now finalized for introduction into EVM LIU-PSB mechanical production and installation 64024 LIU-PSB acquisition electronics and cables 64026 LIU-PSB mechanical commercial components 64028 LIU-PSB control electronics 64027 45% LIU-PS mechanical production and installation 64036 LIU-PS acquisition electronics and cables 64037 LIU-PS mechanical commercial components 64038 LIU-PS control electronics 64039 35% LIU-SPS mechanical production and installation 64047 LIU-SPS acquisition electronics and cables 64048 LIU-SPS mechanical commercial components 64049 LIU-SPS control electronics 64058 25%

Status of prototypes SPS ‘Intermediate’ instrument design, installed in LS1 Currently being used in parasitic beam operations using ‘development kit’ controller Improvements to acquisition filters have solved signal saturation issue Benchmarking beam size measurements with linear scanners PSB ‘Quasi-final’ instrument design installed in EYETS 16-17 Preparations in progress for operations using development kit controller First operations with beam, Summer 2017 Will make benchmarks with operational scanners Laboratory scanner is being used for calibration tests PS Production of instrument mechanics in-progress, plan to install YETS 17-18 Plan to use with final prototype control electronics and low-level software for 2018 operation

Procurement status Vacuum tanks Market survey completed, 18 companies expressed and interest, 9 declined, will now proceed with validation process Invitation to tender documents written and under review Early procurement items (for CONS) identified Raw materials already ordered on CONS code

Production Schedule Overview (Consistent with EVM) Electronics – all electronics delivered Electronics – Test final acquisition prototype Electronics – Test final controls prototype Mechanics – ready for installation Mechanics – components at CERN 2017 2018 2019 2020 Mechanics - design Material procurement Mechanics – procurement and assembly Mechanics – installation Electronics – design Electronics – procurement Cables – procurement and installation Electronics – installation and commissioning Procure spares and vacuum pumps (CONS)

Summary Project proceeding as scheduled Procurement process for mechanics proceeding well Testing of prototypes with beam and on the calibration bench producing results consistent with the operational requirements of the LIU machines Exception: Bunch-by-bunch at SPS nominal intensity flat-top with full LHC batch structure Budget issues resolved Budget now fully consistent with the latest detailed cost estimates thanks to additional support from LIU and CONS Details of spending profile for EVM being finalised Missing funding for Assembly hall renovation and OASIS systems (requested by OP) – alternative funding under study