Montgomery Township Board of Education

Slides:



Advertisements
Similar presentations
PD Plan Agenda August 26, 2008 PBTE Indicators Track
Advertisements

What is a Structured Learning Environment?. The Typical Cedar Lane Classroom Personal care opportunities limited due to schedule Limited Mobility opportunities.
DISTRICT IMPROVEMENT PLAN Student Achievement Annual Progress Report Lakewood School District # 306.
Differentiated Supervision
Principal Evaluation in Massachusetts: Where we are now National Summit on Educator Effectiveness Principal Evaluation Breakout Session #2 Claudia Bach,
Meeting SB 290 District Evaluation Requirements
DISTRICT IMPROVEMENT PLAN Student Achievement Annual Progress Report Lakewood School District # 306.
Horizon Middle School June 2013 Balanced Scorecard In a safe, collaborative environment we provide educational opportunities that empower all students.
Assistant Principal Meeting August 28, :00am to 12:00pm.
Stronge Teacher Effectiveness Performance Evaluation System
TIMBERLANE REGIONAL SCHOOL DISTRICT ACTION PLANS Timberlane Regional Middle School Timberlane Regional High School Timberlane Regional Music Department.
CommendationsRecommendations Curriculum The Lakeside Middle School teachers demonstrate a strong desire and commitment to plan collaboratively and develop.
1. Housekeeping Items June 8 th and 9 th put on calendar for 2 nd round of Iowa Core ***Shenandoah participants*** Module 6 training on March 24 th will.
The College Board Standards for College Success CCSSO – SEC State Collaborative Alignment Study CCSSO-SEC Meeting and Content Analysis Workshop San Diego,
Expeditionary Learning Queens Middle School Meeting May 29,2013 Presenters: Maryanne Campagna & Antoinette DiPietro 1.
TRHS Action Plan Goal 1 O Goal #1: In the School Year TRHS will further develop our Response to Instruction (RTI) model to ensure.
Reform Model for Change Board of Education presentation by Superintendent: Dr. Kimberly Tooley.
A Mission of Restoration
School Accreditation School Improvement Planning.
Mathematics Performance Tasks Applying a Program Logic Model to a Professional Development Series California Educational Research Association December.
Zimmerly Response NMIA Audit. Faculty Response Teacher input on Master Schedule. Instructional Coaches Collaborative work. Design and implement common.
APR 2014 Report: Data, Analysis and Action Plan for Full Accreditation.
ACS WASC/CDE Visiting Committee Final Presentation Panorama High School March
Richard Woods, Georgia’s School Superintendent “Educating Georgia’s Future” gadoe.org Quality Comprehensive Improvement System Key School Performance Standards.
District State of the Schools. AIM I: Unity-Bringing together students, parents, staff, and community 1.Increase the number of website hits by 50%, increase.
Greenbush Teacher/ School Specialist Mentoring Model
CIP: Key Action # 1: Develop and implement systems to achieve academic growth goals for all students.    Objectives/Indicators of Success: Common Assessments.
Montgomery Township Board of Education
During the school year, students will…
Mission Motto Learning for Life
Evaluations (TPGES) All Certified staff are held accountable to job specific domains and standards. SB 1 Changes The Process Starts with the PGP. Bourbon.
Strategic Planning Goals
Wethersfield Teacher Evaluation and Support Plan
Building on our tradition of excellence – planning for the future.
Montgomery Township Board of Education
Jeff McCoy, Executive Director of Academic Innovation & Technology
Worlds Best Workforce Annual Report
Comprehensive Planning
The School Mentor 9/19/2018.
11/10/2018 Graduation Rate 93% of students will graduate within four years School & District Culture Increase the percentage of families and students who.
DESE Educator Evaluation System for Superintendents
Board Presentations Protocol:
Differentiated Supports in Special Education
P-20. P-20 P-20 YEAR 1 PRIORITY 1 PRIORITY 1 YEAR 1 GOAL STATUS [NOVEMBER 2016] SBCISD will implement a developmentally appropriate and aligned curriculum.
Bull Run Middle School School Advisory Meeting, 6:30 – 8:00 p.m. Library.
Roswell North Elementary School
Gary Carlin, CFN 603 September, 2012
CURRICULUM & INSTRUCTION
P-20. P-20 P-20 YEAR 1 PRIORITY 1 PRIORITY 1 SBCISD will implement a developmentally appropriate and aligned curriculum for Prekindergarten and Kindergarten.
Strategic Plan: Tri-Cities High School
Mountain Park Elementary School
Ferguson Elementary School ASCA “RAMP” Award Application
Tiered Instruction and Interventions
PUBLIC SCHOOL CHOICE RENEWAL PROCESS
Mountain Park Elementary School
February 21-22, 2018.
New Prospect Elementary School
Binghamton City School District
An Overview April 2012.
Update of District Goals and Initiatives
Instructional Services: Budget Presentation
PARCC Results: Spring 2018 Administrations Maywood School District
Sylvan Hills Middle (Carver Cluster)
Strategic Plan: Heards Ferry Elementary
Summit Hill Elementary School
Roswell North Elementary School
College Community School District Ten-Year Strategic Plan
Mountain Park Elementary School
Fallsmead Elementary School
Presentation transcript:

Montgomery Township Board of Education District Goals Progress Report 2016-2017 Lower Middle School Michael Richards, Principal Upper Middle School Cory Delgado, Principal

Goal 1: Growth in Achievement for All Students Measurable Objectives Implement effective instructional practices to meet the needs of all learners Expanding our culture of academic rigor and excellence for all students by strengthening teacher effectiveness Incorporating standards-alignment and Depth of Knowledge leveling embedded into common assessments Implementing the Next Generation Science Standards (NGSS) Continue to analyze performance data to proactively address achievement gaps

Action Item 1 Develop common performance assessments and end-of-unit summative assessments in grades 5-12 which measure student achievement and career ready practices according to the rigor of the New Jersey Student Learning Standards (NJSLS). Evaluation/ Indicators of Completion At least of 80% of the courses 5-12 will contain two common performance assessments and two common end-of-unit summative assessments which appropriately meet or exceed the Depth of Knowledge of the NJSLS. Status: Target Met - currently at 89.2%. Timeline for Completion: June 2017

Action Item 2 Implement the Next Generation Science Standards (NGSS) during the first year of required implementation in grades 5-12. Evaluation/ Indicators of Completion Learning Team minutes and lesson plans will reflect co-planning and effective instructional strategies aligned with NGSS. Status: On Target - Examples: Performance assessments created, reworked curriculum documents, modeling instructional strategies continue to be utilized and align with NGSS Standards. Ongoing PD. Timeline for Completion: June 2017

Action Item 3 Utilize responsive teaching strategies in science instruction and gauge a teacher’s capacity to monitor and adjust instructional practices based on the individual needs of his or her students. Evaluation/ Indicators of Completion By June of 2017, 90% of our teacher evaluations will exceed basic levels in the areas of: Using Questioning and Discussion Techniques (3B) and Demonstrating Flexibility and Responsiveness (3E) of Charlotte Danielson’s Framework for Teaching. Status: Target Met: (3B) 100%, (3E) 100% Timeline for Completion: June 2017

Action Item 4 Conduct three data-days in grades 5 & 6 to identify successful instructional practices that support the creation of flexible reading groupings for students reading below and above grade level. Evaluation/ Indicators of Completion Establish baseline reading level data for each student using multiple data points* (1) Mid-year meeting will be conducted to identify student growth (below/above grade level) as well as students who have been identified as struggling at the midpoint using multiple data points*. (2) End- of- year meeting will be conducted to determine student’s reading placement for the following school year, gauge growth from mid-year using multiple data points (3) Targeted professional development identified through student achievement data will be provided to 5-6 teachers. *Data points include a minimum of five assessments. The combination includes both in house and nationally normed assessments.

Action Item 4 continued Status: On Target In a series of meetings with LA Teachers, Academic Support and Guidance, baseline data has been established: Running Records Common Performance Tasks & Summative Assessments Fall & Spring MAP Data review days scheduled in December, March and June Data points are being entered into Performance Matters Data used to streamlining of ID process for I&RS Data supports TC methodology in ALL classrooms Timeline for Completion: June 2017

Action Item 5 Implement professional development at LMS and UMS designed to increase understanding around authentic standards-based grading practices Evaluation/ Indicators of Completion 85% of classroom teachers in Grades 5-8 will participate in at least 3 hours of staff development on standards-based grading practices Status : On Target - departmentalized training w supervisors during 11/9, 2/17 and ongoing PLC. Timeline for Completion: June 2017

Action Item 6 Conduct a standardized analysis of teacher common and other in-house assessments using tools such Performance Matters in Grades 7-12 to provide Science, SS, and Math teachers with the data necessary to make informed instructional decisions based on individualized student need. Evaluation/ Indicators of Completion Learning Team minutes and lesson plans will reflect the implementation of effective, targeted instructional strategies driven by ongoing data analysis. Status : On Target- analysis following assessments is common practice of PLCs to validate questions, inform instruction and identify students in need. Timeline for Completion: June 2017

Action Item 7 Design and implement K-12 staff development for differentiated instruction and coherent planning. Evaluation/ Indicators of Completion 85% of the classroom teachers will participate in staff development surrounding designing differentiated and coherent lessons. Evidence will be gathered through lesson plan reviews and reflected in teacher observation data. Status: Target Met- PD training on 11/9 & 2/17, weekly PLC, monthly Department & Articulation meetings. (3C) 92%, (3E) 83% Timeline for Completion: April 2017

Goal 2: Cultivating a Culture that Emphasizes Student Resilience, Perseverance, Self-Awareness, and Growth Measurable Objectives To ensure that students/staff develop social and emotional competencies to be self-aware and to develop healthy and productive relationships To ensure students have the knowledge and skills necessary to participate productively in the local and global communities and to commit to action as learners and citizens. The district will develop programs and structure which leverage the resources of the Montgomery Learning Community (students, teachers, families, business partners) in order for students to develop social and emotional competencies necessary for postsecondary success.

Action Item 1 Ensure interaction with Naviance for students in every grade from 7 to 12 Evaluation/ Indicators of Completion 90% of students in grades 7-12 will have logged into Naviance and completed grade-appropriate self-assessments. Parents will grow in understanding of Naviance at UMS and MHS via multiple methods, including Back to School Nights, eblasts, parent training offerings, Board Presentation and school website. 85% of MHS teachers will be trained on Naviance as a tool to be used in classroom lessons related to career exploration, learning styles, etc. Status: On Target - All grade 7 & 8 students will use Naviance in CCR cycle and Health 8. Presentations complete and websites expanded to include FAQ. Timeline for Completion: June 2017

Action Item 2 Research Peer programs for LMS and UMS to affect attitudes, norms, knowledge, behaviors, health and achievement outcomes Evaluation/ Indicators of Completion A research-based, multi-year plan will be created for recommending developmentally appropriate Peer program(s) at LMS and UMS. Status: On Target - variety of programs currently being researched. Timeline for Completion: June 2017

Action Item 3 Evaluation/ Indicators of Completion Utilize survey results (from Student Engagement, District Communication, and K-6 Needs Assessment) to inform and improve communication with parents and community regarding Guidance programming Evaluation/ Indicators of Completion A minimum of four(4) parent education series presentations will be offered throughout the school year. Additional communication to parents will be provided in the form of eblast and/or newsletters to inform about programming in the individual schools. All such programming will be documented in the district and individual school calendars as appropriate. Status: On Target - Two evening meetings and two book clubs complete. Parent meetings scheduled for February and March (focus on 5-8). Websites were expanded, newsletters sent out quarterly and events e-blasted in early December and January. Counseling/Guidance Page Timeline for Completion: June 2017

Action Item 4 Utilize the district's digital learning platforms to increase student-learning choices across the curriculum grades 5-12 Evaluation/ Indicators of Completion Administer student survey the the fall 2016 and in the spring of 2016-2017 school year to identify the level of student use of technology with the aim of expanding student choice regarding assignments and learning activities. 35% gain in student technology use between the survey administration from fall to spring of the 2016-2017 SY. Status: On Target - Baseline data came back higher than anticipated - great news! Student learning choices continue to increase. Timeline for Completion: June 2017

Action Item 5 Provide Microaggression and Social, Emotional and Behavioral Barriers training to all MTSD administrators to expand cultural competency. Evaluation/ Indicators of Completion 85% of MTSD faculty and staff to be provided with extended training. Agenda and Staff sign-in sheet kept at school building. Status: Target Met -All administrators attended the Administrative Work Session on Microaggressions in July 2016. Building leaders will turnkey that training to teachers throughout year. Timeline for Completion: June 2017

Action Item 6 Continue efforts to ensure a safe and secure learning environment. Evaluation/ Indicators of Completion 85% of MTSD faculty/staff will actively participate in monthly Share 911 drills utilizing available district and/or personal technology. Status: Target Met- All UMS/LMS staff participate in 2 drills per month. Timeline for Completion: July 2017

Goal 3: Planning for Growth While Employing Fiscal Responsibility Measurable Objectives Provide appropriate resources, data, and staff development necessary for the district to achieve it’s goals and mission within a fiscally responsible model. Sustain excellent, data-informed programming, providing staff and students with the appropriate resources, while maintaining fiscal responsibility.

Thank You For Your Support