5th Street Bridge Replacement Project Contract No

Slides:



Advertisements
Similar presentations
ODOT Structure Project Manager Seminar Specifications
Advertisements

11 Grant Park Sewer Rehabilitation Project BES Project #E10346 Bid # SCOPE: Rehabilitation, Replacement, or Relocation of Sanitary & Combined Sewers,
Herndon Station - North Pavilion Construction Town of Herndon – Town Council August 6, 2014.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
6 th Street Water Main And Street Reconstruction 2013.
New York State Department of Transportation Kendrick Road Bridge Over I-390 Design-Build Project Request for Qualifications Informational Meeting June.
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
John James Audubon Bridge Main Span Materials and Equipment Cement from Thailand Structural Steel from Japan Oscillator from Germany Wind tunnel analysis.
On-Call Signal Contract Options for Discussion March 13, 2015 Cape Cod Joint Transportation Committee.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
Sterling Blvd Water Main Phase 2 IFB# WTR Pre-Bid Conference May 12, 2015.
Project Startup Hmwk Due 10/11/ # 1,3,7,8 8.9 #1 9.7 #1,3,4,5, #1,2,3,4,10.
Project Management Richard Ravin NAU MBA Agenda  Background  Current Position Home Building Business  Project Management vs. Program Management.
ESTIMATING By Laith Jacob.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges over Route 80 Design-Build Project (PIN , D900023) Town of Tully, Onondaga County.
1 Addendum Preparation Process ESC-OE Caltrans. 2 Introduction An addendum is a change in contract requirements for an advertised project for which bids.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
 Understanding the financial short comings.  Impact on Village finances.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
New York State Department of Transportation Accelerated Bridge Program Phase 1B Design-Build Projects Request for Proposals Informational Meeting April.
North Main Street Improvements BID Meeting Wednesday, October 29, 2008.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specification-Show how project.
AWARD OF CONTRACT FOR CONSTRUCTION OF CALIFORNIA OAKS ROAD AT I-15 INTERCHANGE CIP NO City Council Meeting January 18, 2011.
PUBLIC INPUT SESSION NOVEMBER 10, 2015 City of Asbury Birchwood Drive Reconstruction Project.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
Toll Bridge Seismic Retrofit Program Project Schedule and Budgets.
VT 100 over the Mad River Bridge Replacement July 13, 2015.
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specifications-Show how project.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
December 17,  MnDOT signed a highway easment in 1960 with US Steel  The TH 53 is over a ore deposit with shallow strippings, high iron and low.
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
Stormwater Management
Village of east aurora full depth road reconstruction & infrastructure improvements West Fillmore Avenue.
Chapter 8 Specifications & Special Provisions
Design of a Commercial Shopping Center
New Bridge Construction
Sausalito Downtown Public Restroom
Chapter 8 Specifications & Special Provisions
Public Information Meeting NW 100th Street Reconstruction Project
Traffic Control Plan Development Course
IA 122 RECONSTRUCTION PRE-BID MEETING
General Tab Project, Cost Schedule, and Work Limits Roadway Character
A. Datum Corporation Bid package overview
Springbrook Estates Sewer Improvement Area Informational Meeting
US26: Cornelius Pass Rd -185th Ave
Construction 101 Start to Finish
PROJECT NO. T SE Adams Street - SE 29th Street to SE 33rd Terrace
A. Datum Corp. Bid package overview.
Administrator of Construction Todd Wilson Senior Project Manager
AX7665D82 Areawide Total Maximum Daily Load (TMDL) Design-Build
PROJ. 566(17) LOR PID MAJOR WIDENING
Contract 60X10 Informational Meeting Weber I-55
Gunnerson Street Safety Project
ELEVATOR CLOSURES: JANUARY-FEBRUARY 2019
General Tab Project, Cost Schedule, and Work Limits Roadway Character
S.R. 26 Road Rehabilitation in Clinton County
Walker Street Reconstruction Project 25% Design Public Hearing
Harbour Island Force Main Replacement
Ward Park Restroom Timeline
2019 Fueling Stations Upgrade Bloomington, Orono (& CHS) – Best Price
ACEC Designer Training
Presentation transcript:

5th Street Bridge Replacement Project Contract No 5th Street Bridge Replacement Project Contract No. 17-01 Pre-bid Meeting June 1, 2017 Presented By: Kevin Bradford/Yuba City Public Works Matt Griggs/Dokken Engineering Mehrdad Varzandeh/The Hanna Group

5th Street Bridge Replacement Project Contract No 5th Street Bridge Replacement Project Contract No. 17-01 Pre-bid Meeting Agenda Introductions City Website Designer’s Presentation History and Description of Project Staging Bridge Construction Levee Work Trestle Environmental Utilities Cost/Time Miscellaneous Questions Save questions until the end Meeting is being recorded – ask questions using microphone PLEASE FILL OUT THE SIGN-IN SHEET OUT FRONT!

5th Street Bridge Replacement Project Contract No 5th Street Bridge Replacement Project Contract No. 17-01 Pre-bid Meeting Introductions Kevin Bradford – City Project Manager, Yuba City Public Works Matt Griggs – Design Firm Project Manager, Dokken Engineering Mehrdad Varzandeh – CM Firm Project Manager, The Hanna Group Rosa Griggs – Senior Engineer, Dokken Engineering Tim Chamberlain – Senior Environmental Planner, Dokken Engineering Scarlett Harris – Administrative Assistant, Yuba City Public Works Heather Rush – Office Engineer, The Hanna Group PLEASE FILL OUT THE SIGN-IN SHEET OUT FRONT!

5th Street Bridge Replacement Project Contract No 5th Street Bridge Replacement Project Contract No. 17-01 Pre-bid Meeting City Website Refer to City website for information regarding the bid process http://www.yubacity.net/publicworksbids Website contains the following information: Notice to Bidders Construction Bid Resources (Information Handout) Bid Opening Date and Time Engineer’s Estimate Spec Books and Plans (full size and half size) Plan Holder List Will also contain the Pre-Bid Presentation, Questions/Responses, and any Addenda Refer to http://www.yubacity.net/bridge for other information regarding the project.

5th Street Bridge Replacement Project Contract No 5th Street Bridge Replacement Project Contract No. 17-01 Pre-bid Meeting Staging VECP available to modify construction staging and traffic handling Intersection of 5th and J St will need to be completed in 120 days, but waterline can't be installed before September 2018. Demo contract underway and tank removal to follow

5th Street Bridge Replacement Project Contract No 5th Street Bridge Replacement Project Contract No. 17-01 Pre-bid Meeting Bridge Construction Survey required before and after construction to ensure material is not left in the floodplain Option to remove sidewalk on bridge to place final shaft Falsework for frame 2 can stay over winter Reinforcing for median barrier cannot be placed after the pour Temporary and permanent casings and construction methods included in the cost of the shafts Backfill after bridge removal (included in the cost of removal) Limit of 3 precast girders on site, 56 hours before installation Bubble curtain requirements - needed for vibratory or impact hammers, monitoring requirements apply

5th Street Bridge Replacement Project Contract No 5th Street Bridge Replacement Project Contract No. 17-01 Pre-bid Meeting Levee Work All material in levee must be levee fill material Work window is April 15 to November 1 No pile driving in levee Levees must be rebuilt with RSP in place by November 1

5th Street Bridge Replacement Project Contract No 5th Street Bridge Replacement Project Contract No. 17-01 Pre-bid Meeting Trestle Critical for the schedule - submit at pre-con. Meeting Permitted for approximately 273 pipe piles - 22" dia. (H-piles are an option) Trestle elevation Bubble curtain requirements - monitoring requirements only

5th Street Bridge Replacement Project Contract No 5th Street Bridge Replacement Project Contract No. 17-01 Pre-bid Meeting Utilities Relocations Underway

5th Street Bridge Replacement Project Contract No 5th Street Bridge Replacement Project Contract No. 17-01 Pre-bid Meeting Cost/Time Pilasters are included in the linear cost of barrier Shoring is lump sum for 5th Street Bridge, 2nd Street UC and road staging No winter suspension Time related overhead intentionally omitted from Bid items - no bid item Price Index Fluctuation removed

5th Street Bridge Replacement Project Contract No 5th Street Bridge Replacement Project Contract No. 17-01 Pre-bid Meeting Miscellaneous No access from the north on Biz Johnson Drive Use of the construction staging areas in the park/soccer complex are limited to one season (August thru November). No staging area outside of the bridge area can be utilized for more than 6 months total in the park. Railroad flagging required by railroad when using equipment near railroad bridge in Marysville. Parking lot and road repairs upon completion of work Concrete pavement between the approach slab is structural concrete (approach slab)

5th Street Bridge Replacement Project Contract No 5th Street Bridge Replacement Project Contract No. 17-01 Pre-bid Meeting Questions and Answers All questions and answers will be posted on City website Yuba City appreciates your interest in this project and your investment in responding to our bid advertisement!