new straw end plug: D=10.6 mm straws support frame Levan option

Slides:



Advertisements
Similar presentations
Helium Bag Readiness. Scattering chamber Clamshell flange (not here yet) Coffee can collimator Polyurethane Balloon (sides only) 10 m Mylar Balloon.
Advertisements

Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
TPC meeting, CERN, 7-8 October 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 7-8 October 2003 Børge Svane Nielsen, Niels Lindegaard,
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
5/7/2003Edgar L. Black IIT MICE Meeting at Columbia University Hydrogen/Focus Module Components assembly Details concept June 13,2003.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
Non-welded Window Option Edgar L. Black IIT August 15,2003.
5/7/2003Edgar L. Black IIT MICE Integration Meeting Hydrogen/Focus Module Components Details development May 9, 1003.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
MM mechanical prototype Work progress at CERN MMM Rome, 15/07/20131.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
Vacuum system.
CLASSE prototype: mechanical concepts G. De Michele, EPFL-PSI-CERN on behalf of CERN team SLAC, 16 th April, 2012.
409 – Design changes, early 2012 Overview The following areas of the 409 design have been changed: 1)Chassis sideview from straight to curved 2)Front wheel.
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
Status of Torino-Dubna Production Aluminum Plates production: Torino: steady production ongoing, 2715 plates cut, 194 chambers=48MB1.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
N. Dixon PH / DT CERN 12 July Straw Material, weld line latest news and plans.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
CLAS12 Drift Chamber Prototyping
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
Neil Dixon PH/DT Dubna July 1010 Straw Material latest news and plans 1.
Closeout. Sharing 2010 Straw production – Material study: CERN – Procurement (CERN) – Straw production: Dubna Electronics (CERN) Simulations, analysis.
Meeting at Chooz PMTs Mechanical support on the Buffer. Updates. Enrique Calvo Alamillo
Magnetized Beam LDRD: Design Tasks February 19, 2016.
Tracking Session, Groningen, August 30th, News from Krakow on the Forward Tracker J. Smyrski Institute of Physics UJ Model of the tracking stations.
Straw Individual assembling device and the straw linearity preliminary measurements L.N.Glonti
DCal-ALICE integration and installation plan and status A. Tauro.
Stereo Collab Meeting | CEA Saclay July-2015 Conclusions.
Extra / Discussion Slides. 2 1.Helium Top Fill Port Add extra CF/ISO flange as collar so that the weld-region is not disturbed 2.Helium bottom FillCF.
FWD Meeting, Torino, June 16th, News from Cracow on the forward tracking J. Smyrski Institute of Physics UJ Tests of CARIOCA and LUMICAL preamplifiers.
NA 62 – straw detector Content Detector Specifications Chamber design Straw design and specifications Calculations and measurements Prototyping Plans Straw.
A.Ryazantsev, IHEP-Protvino, RussiaPANDA Russia Workshop at Moscow, May 2015 Status on Barrel Mechanics Andrey Ryazantsev on behalf of the IHEP-Protvino.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
Assembly of the doorknob
The drift chamber with a new type of straws for operation in vacuum
S.Movchan Straw manufacturing and QC
“CENTRAL SUPPORT FRAME” -
We started last December: 32 channels prototype “Julich like” to:
STRAW TRACKER SYSTEM CAD STATUS :
From: A New Geometry High Performance Small Power MCFC
Remaining items (per module) for panel construction (mostly Fabien)
Quality Control in Straw Production
Status of straw production straw module assembling
T1 status (a selection from EDR presentations)
Updates on the Micromegas + GEM prototype
Development of the pellet target in ITEP
G. Carboni for the Muon Group
Sensor Wafer: Final Layout
EHN1 Neutrino Installation Plans
Numerical simulations on single mask conical GEMs
MicroMegas Mechanical Meeting --- Cern April 2014
Numerical simulations on single mask conical GEMs
Design of Distribution Feedbox at LHC P7
Gas Monitoring Chamber Production Status
Figure 18.1 Typical port fuel-injection system, indicating the location of various components. Notice that the fuel pressure regulator is located on.
questions for cern – doyle rev 7/09/07 1/5
NEG-coated gun: Black R30 arc at 227kV, white R30 arc at 164 after refurbishing and second bake Carlos Wednesday, August 10, 2018.
Final Design CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE.
CNGS horn / reflector in 2005: The story of the glass ring insulator
BGC Collaboration Meeting –
UPPSALA UNIVERSITY_GERSEMI PROJECT
Presentation transcript:

new straw end plug: D=10.6 mm straws support frame Levan option 30-May-18 Sector prototype Prototype common view Slava option new straw end plug: D=10.6 mm straws support frame Levan option Plans, work sharing Discussion Presented by S.Movchan 30-May-18 S.Movchan Straw status S.Movchan

Straw length Free flange - Console!!! Fixed flange 30-May-18 S.Movchan Straw status S.Movchan

30-May-18 Common view 30-May-18 S.Movchan Straw status S.Movchan

CERN and Dubna sectors (proposal) 30-May-18 CERN and Dubna sectors (proposal) Dubna sector CERN sector Dubna sector Flange thickness h=25 mm Slava ANSYS results – only for h=40 mm Slava request: h=30 mm (due to straw end plug L=30 mm) 30-May-18 S.Movchan Straw status S.Movchan

Smaller flange view inside vacuum tank 30-May-18 Smaller flange view inside vacuum tank CERN sector Dubna sector 30-May-18 S.Movchan Straw status S.Movchan

30-May-18 Vacuum sylphon 30-May-18 S.Movchan Straw status S.Movchan

Slava option (straw glue like into CREAM) 30-May-18 S.Movchan Straw status

Slava option: D1=10.6 mm and D2=10.4 mm 30-May-18 Slava option: D1=10.6 mm and D2=10.4 mm Slava option: D1=10.6 mm L= 30 mm 30-May-18 S.Movchan Straw status S.Movchan

Slava option: straws support frame 30-May-18 Slava option: straws support frame Rohacell 30-May-18 S.Movchan Straw status S.Movchan

Straws support frame: holes shape 30-May-18 Straws support frame: holes shape Beam Ø1 = 10.8 mm - for straw insertion Ø2 = 9.9 mm - for straw positioning 30-May-18 S.Movchan Straw status S.Movchan

Levan option Straw with different diameters can be used! 30-May-18 S.Movchan Straw status S.Movchan 11

Levan option: schematic view of a straw elements 30-May-18 Levan option: schematic view of a straw elements 30-May-18 S.Movchan Straw status S.Movchan 12

Levan option: set of end plugs 30-May-18 S.Movchan Straw status 13

Straw o-ring sealing: vacuum test result 30-May-18 Straw o-ring sealing: vacuum test result The vacuum test was showed that with the use of the rubber O-rings for vacuum sealing of the single straw in the chamber the average gas leakage value is: 0.0004 cm3 /min (without straw) 30-May-18 S.Movchan Straw status S.Movchan 14

Levan option: straw pre-tension by spring 30-May-18 Levan option: straw pre-tension by spring 30-May-18 S.Movchan Straw status S.Movchan 15

Plans Set of prototype drawing April/May Sector prototype production May 40 straw prod. at Dubna and delivery to CERN June 32 CERN straws assembly June 32 Dubna straws assembly July Vacuum test July-August Anode wire crimping and tension measurement August WEBs and gas manifolds assembly August Front-end integration September Prototype install., consol adjustment, survey end of September DAQ, grounding, front-end noise optimization October Start up 12 October Beam test start 17 October 30-May-18 S.Movchan Straw status

Work sharing (proposal) 30-May-18 S.Movchan Straw status

Items for discussion: Final geometry of single straw view (introduce or not gap between neighboring straw rows (h=1 mm) for straws support structure (for wires)?) Flange thickness: h=30 mm instead h=25 mm Groves on flanges back side – for what needed (if straws will be not installed?) Model of the gas manifold cell is needed (assembly procedure, cell fixation to flange, WEB fixation, gas inlets and outlets, pressure sensor and safety valve, …) Model of Photon Veto tank is needed WEB final design is needed (model or drawing) Sector prototype straw geometry alignment and check (modern method and devises) Consol adjustment Prototype survey 30-May-18 S.Movchan Straw status

Gas manifold: complicate angle grooves shape and narrow gap Very narrow gap: s=0.66 mm Complicate shape 30-May-18 S.Movchan Straw status

Slava ANSYS result exist only for h=40 mm Thickness h=40 mm 30-May-18 S.Movchan Straw status

For what this groove needed? 30-May-18 S.Movchan Straw status

for discussion 30-May-18 S.Movchan Straw status