PERT & GANTT CHARTS An Introduction.

Slides:



Advertisements
Similar presentations
Estimating, scheduling and budgeting
Advertisements

Gantt and PERT charts. Representing and Scheduling Project Plans Gantt Charts Useful for depicting simple projects or parts of large projects Show start.
Network Diagramming Network Analysis  The common term for network analysis is PERT  PERT stands for Program Evaluation and Review Technique  The word.
Scheduling the Project
Gantt Chart Graph or bar chart with a bar for each project activity that shows passage of time Provides visual display of project schedule Slack amount.
CS3500 Software Engineering Project Management (1) In 1986 one well-known software engineer (Tom DeMarco) made the simple but important observation: “You.
CPA A house is to have new carpets fitted throughout. The work involved has been divided into a number of tasks, as shown in the table.
1 Operations Management Lesson 5 Project Management.
COMP2001 HNC Project. Project Characteristics A project must have: clear objectives planning & control resources assurance of quality.
Project Management. Introduction What – Project Management Where – Where the success or failure of a project will have major consequences for the company.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 6 Project Management.
Project Time Management
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Gantt Charts and PERT Charts. Copyright © 2009 South- Western/Cengage Learning. All rights reserved. 14–2 Managing Operations Systems Planning Sheet –
Project Scheduling & Budgeting CEE 402 Engineers Without Frontiers Lecture 6 February 26, 2003.
Gantt and PERT charts. Representing and Scheduling Project Plans Gantt Charts Useful for depicting simple projects or parts of large projects Show start.
Prepared by: Michael Palazzo
Project Management Chapter 3 BUSI 2106 – Operations Management.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
Project Management An overview. What is a Project A temporary job to accomplish a specific task A temporary job to accomplish a specific task Attributes.
MANA 705 DL © Sistema Universitario Ana G. Méndez, All rights reserved. W6 6.2 Operation Management Operation Management Managing Projects Techniques.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Copyright 2006 John Wiley & Sons, Inc. Project Management OPIM 310.
Lecture 3 Scheduling CSCI – 3350 Software Engineering II Fall 2014 Bill Pine.
Lean Project Management
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
PROJECT SCHEDULING By Deepika chaudhary. Project Scheduling Scheduling means estimation of time and resources required to complete activities and organise.
Unit 9.2_Lesson 2_CD Resource 2f_Plenary Gantt charts From the Gantt Chart answer the question.
Objectives 4 Understand the basic concepts of project planning and control 4 Explain PERT and Timeline (Gantt) charts.
1 OMGT 3123 Project Management  Project Controlling  Project Management Techniques: PERT And CPM  The Framework Of PERT And CPM  Network Diagrams And.
Chapter 6: Project Time Management Information Technology Project Management, Fourth Edition Using Critical Chain Scheduling, PERT, and MS Project 2003.
Chapter 7 PERT Project Management for Business, Engineering, and Technology.
Pegasus Project Management: Resource Factors November 8, 2001 MBA 253 The Pegasus Group: Mario RossoMario Rosso Phil RandolphPhil Randolph.
A2 Technology Product Design Systems and Control Notes DT4 - Exam.
Project Scheduling Software
Information Systems System Analysis 421 Chapter 3 Managing the Information Systems Project.
Project Scheduling Class 7.
Project Management Concepts Gantt Chart – shows tasks as bars whose length indicates timing. PERT* chart (Network Diagram) – shows relationships between.
Project Planning & Scheduling What is a “project”? Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time Networks.
Tools to Help  Product flow Dependencies and relationships of deliverables  Work breakdown structure The parts  PERT charts Program Evaluation and.
WEEK 4 Introduction to Project Management 1. Communication Plan Objectives Objective is to determine: ◦ Who needs to know what? ◦ How will they be told?
Managing the Information Systems Project Cont’d
Scheduling Scheduling : is the process of converting a project action plan into an operating time table. Why scheduling ? To answer the following questions:
Project Management – PTM721S
Project Management Project Controlling
PROJECT MANAGEMENT.
Project Management (專案管理)
Project Management: PERT/CPM
Business System Development
Introduction to Project Management
Project Planning & Scheduling
The Project Schedule and Budget
Project Planning & Scheduling
Project Planning & Scheduling
Activity Planning.
PERT-CRITICAL PATH-DECISION MAKING PROCESS/TOOLS
Unit 4 Project Design, implementation and evaluation
PERT - The Program Evaluation and Review Technique
برنامه ريزي و كنترل پروژه
Chapter 16 – Project Management
CIS 210 Systems Analysis and Development
Project Management CPM/PERT Professor Ahmadi.
Exercise – A small building.
Principles of Management Learning Session # 21 Dr. A. Rashid Kausar.
Project Management Project management is the discipline of organizing and managing resources in such a way that these resources deliver all the work required.
PERT Program Evaluation and Review Technique
Managing Risk Chapter 7.
Scheduling.
Presentation transcript:

PERT & GANTT CHARTS An Introduction

Program Evaluation & Review Technique (PERT) - Is used in planning & organising phase of a project. Uses task times & dependencies to determine the sequence of events & how they control how long the project will take – critical path. Booz Allen Hamilton 1958 – Working on US Naval Contract

PERT Diagram - Purpose Purpose To determine the overall project cumulative elapsed time To determine ways to allocate resources to reduce project cumulative elapsed time

PERT DIAGRAM - Process Step 1 – Task Table Step 2 – Diagram & Dependencies Step 3 – Task Execution Times Step 4 – Cumulative Elapsed Time Step 5 – Critical Path Step 6 – Reduce Project Time

PERT STEP 1 – Task Table TASK ID DEPENDENCIES UNITS (DAYS) A Start 2 B 4 C 6 D 5 E C,D 3 F G E,F Finish

PERT Step 2 – Diagram & Dependencies B F START FINISH A C E G D

PERT Step 2 – Diagram & Dependencies B F START FINISH A C E G D

PERT Step 2 – Diagram & Dependencies B F START FINISH A C E G D

PERT Step 2 – Diagram & Dependencies B F START FINISH A C E G D

PERT Step 3 – Task Execution Times B4 F4 START FINISH A2 C6 E3 G2 D5

PERT Step 4 Cumulative Elapsed Time B4 F4 START FINISH A2 C6 E3 G2 D5

PERT Step 4 Cumulative Elapsed Time B4 F4 START FINISH A2 C6 E3 G2 2 D5

PERT Step 4 Cumulative Elapsed Time 6 B4 F4 START FINISH A2 C6 E3 G2 2 D5

PERT Step 4 Cumulative Elapsed Time 6 B4 F4 8 START FINISH A2 C6 E3 G2 2 D5

PERT Step 4 Cumulative Elapsed Time 6 B4 F4 8 START FINISH A2 C6 E3 G2 2 7 D5

PERT Step 4 Cumulative Elapsed Time 6 B4 F4 10 8 START FINISH A2 C6 E3 G2 2 7 D5

PERT Step 4 Cumulative Elapsed Time 6 B4 F4 10 8 START FINISH A2 C6 E3 G2 11 2 7 D5

PERT Step 4 Cumulative Elapsed Time 6 B4 F4 10 8 13 START FINISH A2 C6 E3 G2 11 2 7 D5

PERT Step 4 Cumulative Elapsed Time =13 6 B4 F4 10 8 13 START FINISH A2 C6 E3 G2 11 2 7 D5

PERT Step 5 - Critical Path 6 B4 F4 10 8 13 START FINISH A2 C6 E3 G2 11 2 7 D5

PERT Step 5 - Critical Path 6 B4 F4 10 8 13 START FINISH A2 C6 E3 G2 11 2 7 D5

PERT Step 5 - Critical Path 6 B4 F4 10 8 13 START FINISH A2 C6 E3 G2 11 2 7 D5

PERT Step 5 - Critical Path 6 B4 F4 10 8 13 START FINISH A2 C6 E3 G2 11 2 7 D5

PERT Step 5 - Critical Path 6 B4 F4 10 8 13 START FINISH A2 C6 E3 G2 11 2 7 D5

PERT Step 6 – Reduce Project Time B4 F4 10 8 13 START FINISH A2 C6 E3 G2 11 2 7 D5

PERT Step 6 – Reduce Project Time B4 F4 10 8 13 START FINISH A2 C6 E3 G2 11 2 7 D5

PERT – Stochastic PERT B 3-4-5 F 2-4-6 START FINISH A 1-2-3 C 5-6-7 10 8 13 START FINISH A 1-2-3 C 5-6-7 E 2-3-4 G 1-2-3 11 2 7 D 3-5-7

D 3-5-7 PERT – Stochastic PERT B 3-4-5 F 2-4-6 START FINISH A 1-2-3 10 8 13 START FINISH A 1-2-3 C 5-6-7 E 2-3-4 G 1-2-3 11 2 7 D 3-5-7 D 3-5-7

D 3-5-7 PERT – Stochastic PERT B 3-4-5 F 2-4-6 START FINISH A 1-2-3 10 8 13 START FINISH A 1-2-3 C 5-6-7 E 2-3-4 G 1-2-3 11 2 7 D 3-5-7 Optimistic D 3-5-7

D 3-5-7 PERT – Stochastic PERT B 3-4-5 F 2-4-6 START FINISH A 1-2-3 10 8 13 START FINISH A 1-2-3 C 5-6-7 E 2-3-4 G 1-2-3 11 2 7 D 3-5-7 Optimistic Normal D 3-5-7

D 3-5-7 PERT – Stochastic PERT B 3-4-5 F 2-4-6 START FINISH A 1-2-3 10 8 13 START FINISH A 1-2-3 C 5-6-7 E 2-3-4 G 1-2-3 11 2 7 D 3-5-7 Optimistic Normal Pessimistic D 3-5-7

Gantt Chart Shows planning schedule of the tasks for the project Shows progress to date First Used by Henry Gantt 1910

Gantt Chart B4 F4 START FINISH A2 C6 E3 G2 D5 6 10 8 13 11 2 7 1 2 3 4 8 13 START FINISH A2 C6 E3 G2 11 2 7 D5   1 2 3 4 5 6 7 8 9 10 11 12 13 14 Days TASKS A B C D E F G

Gantt Chart B4 F4 START FINISH A2 C6 E3 G2 D5 6 10 8 13 11 2 7 1 2 3 4 8 13 START FINISH A2 C6 E3 G2 11 2 7 D5   1 2 3 4 5 6 7 8 9 10 11 12 13 14 Days TASKS A B C D E F G

Gantt Chart B4 F4 START FINISH A2 C6 E3 G2 D5 6 10 8 13 11 2 7 1 2 3 4 8 13 START FINISH A2 C6 E3 G2 11 2 7 D5   1 2 3 4 5 6 7 8 9 10 11 12 13 14 Days TASKS A B C D E F G

Gantt Chart B4 F4 START FINISH A2 C6 E3 G2 D5 6 10 8 13 11 2 7 1 2 3 4 8 13 START FINISH A2 C6 E3 G2 11 2 7 D5   1 2 3 4 5 6 7 8 9 10 11 12 13 14 Days TASKS A B C D E F G

Gantt Chart B4 F4 START FINISH A2 C6 E3 G2 D5 6 10 8 13 11 2 7 1 2 3 4 8 13 START FINISH A2 C6 E3 G2 11 2 7 D5   1 2 3 4 5 6 7 8 9 10 11 12 13 14 Days TASKS A B C D E F G

Gantt Chart B4 F4 START FINISH A2 C6 E3 G2 D5 6 10 8 13 11 2 7 1 2 3 4 8 13 START FINISH A2 C6 E3 G2 11 2 7 D5   1 2 3 4 5 6 7 8 9 10 11 12 13 14 Days TASKS A B C D E F G

Gantt Chart B4 F4 START FINISH A2 C6 E3 G2 D5 6 10 8 13 11 2 7 1 2 3 4 8 13 START FINISH A2 C6 E3 G2 11 2 7 D5   1 2 3 4 5 6 7 8 9 10 11 12 13 14 Days TASKS A B C D E F G

Gantt Chart B4 F4 START FINISH A2 C6 E3 G2 D5 6 10 8 13 11 2 7 1 2 3 4 8 13 START FINISH A2 C6 E3 G2 11 2 7 D5   1 2 3 4 5 6 7 8 9 10 11 12 13 14 Days TASKS A B C D E F G

Gantt Chart B4 F4 START FINISH A2 C6 E3 G2 D5 6 10 8 13 11 2 7 1 2 3 4 8 13 START FINISH A2 C6 E3 G2 11 2 7 D5   1 2 3 4 5 6 7 8 9 10 11 12 13 14 Days TASKS A B C D E F G

Gantt Chart – C halved B4 F4 START FINISH A2 C3 E3 G2 D5 6 10 5 12 10 5 12 START FINISH A2 C3 E3 G2 10 2 7 D5   1 2 3 4 5 6 7 8 9 10 11 12 13 14 Days TASKS A B C D E F G