Equipment simplified model SMR UR safety

Slides:



Advertisements
Similar presentations
Cold Powering of the HL-LHC magnet system WP6 Motivation Work Package description Tasks Partners & resources Amalia Ballarino HL-LHC Design Study – 3 rd.
Advertisements

CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
LHC Performance Workshop - Chamonix January 2010 Session 4 - Safety for Personnel Underground - He Evacuation What can the Safety Coordination.
Safety Management of the LIU Project A. Funken Anne Funken, LIU PT 21/05/15.
SAFETY FOLLOW-UP HL-LHC PROJECT WP17 – Infrastructures meeting S. La Mendola, Jose Gascon DGS/SEE 09 July 2015.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
From Research Prototype to Production
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
LHC Insertions Upgrade Working Group (LIUWG) Space available in tunnel Y. Muttoni.
1 1. Some recent views ( ) 2 Linac tunnel
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
STATUS REPORT: ALIGNMENT OF COLLIMATORS P. BESTMANN /O. ABERLE Collimation Working Group 26/09/2011.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
EN-CV interventions during YETS
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
For more info:
LIU-PSB Configuration Management EDMS Documentation, Layout and ECRs Thomas Birtwistle EN-MEF-DC.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008.
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
19/11/2015 PSB and PS&TT2 Facilities YETS L. Kobzeva.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
Project Breakdown Structure Tracing changes to our different baselines I. Bejar Alonso and Project Office TCC – 14 th January 2016.
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
Philip Schwarz TE-MSC-MNC 1 Engineering Specifications for ELENA ring and TL magnets Philip Schwarz on behalf of WP 2.2 ELENA IIC meeting 5 th December.
WA 104 : TOOLS FOR WORK ORGANIZATION IN THE CLEAN ROOM Erwan Bertrand Olga Beltramello.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Proposal: Use of ECRs for “Controls” Changes and Renovations Rende Steerenberg, Samy Chemli, Marine Gourber-Pace, Klaus Hanke, Verena Kain, Bettina Mikulec,
Design considerations for the FCC electrical network architecture FCC week 2016, Rome, April 2016 Davide Bozzini - CERN/EN/EL With the contribution.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
Safety - Lessons learnt from the design, commissioning and operation of the HIE-ISOLDE cryomodules Safety overview ESS 8 June 2016 AP.Bernardes/EN on behalf.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
LIU Configuration Management EDMS Documentation, Layout and ECRs This presentation follows the LIU-PSB specific presentation done on 9 th October 2014.
LHC experience with installation Katy Foraz March 6th 2008, Dubna GDE Meeting - ILC Conventional Facilities and Siting Workshop ***********************************
Update on the PSB Cooling and Ventilation Systems
News and Introduction from CERN June 15th, 2005
SMR 21/09/2017 P. Fessia.
HL-LHC IT STRING and Series test of SC link
TC activities.
Installation of an Instrument on a CERN machine
Feasibility and implication of installation of the string test in SM18 with a slope M. Bajko WP16.
HEL – Safety aspects Christelle Gaignant
Safety Issues (TF, June 15, 2005)
Document Plan & Milestones WP7
M. Alcaide Leon, Paolo Fessia
M. Alcaide Leon, Paolo Fessia
FCC Tunnel and Shaft Cross Sections
Hollow e- lens, Cryogenic aspects
Accelerator and Experiment Interface Session: LS2, LS3
Y. Muttoni - J.P. Corso TS Workshop Archamps
RWTCS Steering Commitee
Lucio Rossi Project Leader
International Review of the Conceptual Design of the Cold Powering system for the HL-LHC Superconducting Magnets J.Ph. Tock
A very first look at siting issues
The overall integration. Frozen situation 18/09/2015
Powering from short circuit tests up to nominal
Overview & baseline of LS2 and roadmap for CRG
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
START OF REVISION OF UR TUNNEL INTEGRATION
LINAC 3 Meeting ICL machines Injectors
Presentation transcript:

Equipment simplified model SMR UR safety P. Fessia, Y. Muttoni and the integration team Presented by P. Fessia

Simplified model

The problem Machine integration uses 3D models to put together all the different equipment in order to check that there are no interferences (physical and with reserved space), to simulate interventions In the LHC for a tunnel section we have Tunnel walls General services Cryogenics Magnet or other equipment on the beam Racks Cabling Reserved space (transport/alignement) Each of these are models to be put together. If each of this is several Gb the final model cannot be handled and we do not need all the internal feature needed for design

Example of simplified modeI I

Example of Simplified models II

Request from now ahead Each WP and tasks shall provide the simplified model for integration to the integration team There will be several version according to how the model advance. Do not wait the last one Ask explicitly to the mechanical design office to take this request into account. They are not necessarily accounting for it and it will be few extra hours Hot to develop them Y. Muttoni has prepared a guideline procedure to help preparing them (there are tricks on reference system to be taken into account, facets etc). This document will provide 70% of the answers There are features that are depending from the functional integration requirement from system to system. Please tell your designer/ engineering charge to discuss the level of simplification with Y. Muttoni Till now we did for part of the system needed for LS2 to speed up the process. Thanks to take this in charge from now ahead

SMR

SMR Space Modification Requests are documents to propose and track changes in the integration baseline. This could also involve modifications of other infrastructures and impact other WP. If approved by the project office then it originates an ECR that could request more info then the SMR For the moment applied to the new HL underground structures and to the surface ones We want to trace cost increases, decreases, extra cost limitations and transfer of budget between WPs Managed in SharePoint https://espace.cern.ch/HiLumi/WP15/Lists/List_SMR/AllItems.aspx

SMR under discussion N object WP requesting WP involved 2 UL displacement P5 WP6A, WP3 WP6B, WP7, WP9, WP17.1 3 4 Underground infrastructure P1 (metallic structures, platforms, iron support) WP15 (WP4, WP9, WP17.2, WP17.3) WP4, WP9, WP17.1, WP17.2, WP17.3 5 Underground infrastructure P5 (metallic structures, platforms, iron support) 6 PM17 infrastructures (cable trays and smoke extraction system) WP17.2, WP17.3 WP9, WP15, WP17.1, WP17.2, WP17.3 7 PM57 infrastructure (cable trays and smoke extraction system) 8 SD57 cryo routing under floor WP9, WP15 WP9, WP15, WP17.1

SMR under discussion N object WP involved 9 Technical galleries and HL building interfaces P1 WP15 (WP4, WP9, WP17.2, WP17.3) WP4, WP9, WP17.1, WP17.2, WP17.3 10 Technical galleries and HL building interfaces P5 11 Modification loading carrying structure SD 17 and SD metallic structure 12 Modification loading carrying structure SD 57 and SD metallic structure

Electrical safety for HL underground

15/09/2017 first discussion On the 15/09/2017 we will have a first hour of discussion on the electrical safety guidelines to be applied for the design of the electrical system to be installed in the UR. I recall you that the project baseline, for which we are investing a lot of money, is to have access in beam that means with circuit fully powered. We shall ensure people safety already in the design phase in order to avoid costly, time consuming and voluminous retrofit. It is important that everyone is on the same page Following the first discussion we will see how to go ahead in this crucial activity   All systems are concerned with different level of impact and therefore if you, as WPL or task leader, cannot come please send a knowledgeable and accountable representative. Here my very personal list WP6a: main actors, i.e. present LHC design of connection between  water cooled cables and DFBA would not be acceptable and the DFH system shall take into account the safety requirement in the design WP 17.2: main actor: all the cables and the connection and transformers WP6B: main actor as part of the circuit system WP7: quench protection WP4: installation of the RF equipment in the UA WP9: cryogenic is in the proximity: possible secondary risk could be generated by electrical accident. WP17.3: CV as for cryogenic