LIU – SPS Low level RF Updates and schedule G. Hagmann,

Slides:



Advertisements
Similar presentations
Stephanie Allison LCLS Event System 14 June LCLS Event System Outline HW Block Diagram Timing Requirements Time Lines EVG.
Advertisements

Digital RF Stabilization System Based on MicroTCA Technology - Libera LLRF Robert Černe May 2010, RT10, Lisboa
26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
LINAC 4 – LLRF ELECTRONICS UPDATE BCC-42 A.K. Bhattacharyya, A. Butterworth, F. Dubouchet, J. Molendijk, T. Mastoridis, J. Noirjean(reporter), D. Stellfeld,
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Overview of the LLRF Activities at SLAC
Status of MicroTCA LLRF Development Zheqiao Geng On behalf of the LLRF AIP team 6/4/2012.
Strategy for SPS 200 MHz LLRF upgrade (1)  Each of the four cavities (2x 5 sections, 2x 4 sections):  1-T Feedback (loop around cavity and amplifier)
LCLS-II Injector LLRF System – MicroTCA Based Design Zheqiao Geng 6/4/2012.
Wir schaffen Wissen – heute für morgen 24 August 2015PSI,24 August 2015PSI, Paul Scherrer Institut Status WP 8.2 RF Low Level Electronic Manuel Brönnimann.
Jan 30, 2008MAC meeting1 Linac4 Low Level RF P. Baudrenghien with help from J. Molendijk CERN AB-RF.
Zheqiao Geng 6/5/2012 Plan for Evaluating LLRF Deployment Solution at LCLS-II.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
September 19-20, 2007 A.Zaltsman EBIS RF Systems RF System Overview Alex Zaltsman September 19-20, 2007 DOE Annual Review.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Communication in ATCA-LLRF System LLRF Review, DESY, December 3rd, 2007 Communication in.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser 1 Frank Ludwig, DESY XFEL-LLRF-ATCA Meeting, 3-4 December 2007 Downconverter Cavity Field.
W. Hofle LIU-SPS Meeting SPS BA2 Damper LS1 Progress and plans reported by W. Hofle LIU-SPS Meeting G. Kotzian T. Levens D. Valuch.
Feedback and Beam Control Section (FB) Activities and Highlights 2013 Outlook presented by Wolfgang Hofle FB Section at 2013 RF Group Meeting - December.
BPM stripline acquisition in CLEX Sébastien Vilalte.
CLIC NI Acquisition and Control Module update CLIC Module Working group meeting Adriaan Rijllart EN-ICE-MTA.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 17 th December 2013.
LS1 Mid-Point Status Report of the PSB Low Level RF, Transverse Feedback & High Level RF. Autumn 2013 A. Akroh, M.E. Angoletta, A. Blas, L. Arnaudon, A.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
Digital LLRF: achievements and LS1 plans M. E. Angoletta, A. Blas, A. Butterworth, A. Findlay, M. Jaussi, P. Leinonen, T. Levens, J. Molendijk, J. Sanchez.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
CS section activities Industrial controls Luca Arnaudon David Glenat David Landre Slawomir Totos Ruben Lorenzo-Ortega Digital hardware John Molendijk.
PIP Update May Agenda Summary Update – Activities – Budget – Plans Update Slides – Solid StateTom – ModulatorsRene – High Power Ferrite Testing.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Steps towards beam commissioning: Low Level RF system group Thomas Schilcher :: Paul Scherrer Institut SwissFEL.
HINS LLRF Status and Plans Brian Chase For the LLRF Group.
E. Hazen -- ACES ACES 2011 MicroTCA in CMS E. Hazen, Boston University for the CMS collaboration.
E. Hazen -- Upgrade Week1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- Upgrade Meetings1 AMC13 Project DAQ and TTC Integration For MicroTCA in CMS Status Report E. Hazen - Boston University for the CMS.
E. Hazen -- HCAL Upgrade Workshop1 MicroTCA Common Platform For CMS Working Group E. Hazen - Boston University for the CMS Collaboration.
Andrew Young SLAC TID-AIR Technology Innovation Directorate
DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University
Injector II Low Level RF & Interlock – Status
AMC13 Project Status E. Hazen - Boston University
CC LLRF SM18 test plan and BA6 infrastructure
RF acceleration and transverse damper systems
The SLAC Instrumentation and Control Platform
AMC13 T1 Rev 2 Preliminary Design Review E. Hazen Boston University
Controls & software Andy Butterworth.
E. Hazen - Back-End Report
Brief Status SPS Prototype PSB Prototype Installed in LS1
Jorge Sánchez-Quesada BE-RF-FB
LHC-RF activities in LHC PT 4 TS2 YETS LS2
LIU Wire Scanner Milestones June 2017
Overview and System Design for ESS LLRF Systems
ILC LLRF Status Ruben Carcagno, Brian Chase
LIU – EVM status and next steps
Injectors BLM system: PS Ring installation at EYETS
Ewald Effinger, Bernd Dehning
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
New xTCA Developments at SLAC
The ELENA BPM System. Status and Plans.
12.4: SRF HOM Diagnostics: Experimental Results and Future Plans
Digitizers in CCR for transverse wide-band pick-ups
MicroTCA Common Platform For CMS Working Group
MTCA.4 Based Local Oscillator and Clock Generation Module for the European XFEL. Uroš Mavrič on Behalf of the MSK Group / DESY and ISE / Technical University.
xTCA in CMS Magnus Hansen Thanks to many CMS collaborators
LLRF and Beam-based Longitudinal Feedback Readiness
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
ESS BCM Firmware 1.
Krzysztof Czuba ESS LLRF Quarterly Meeting
Electronics, motion control and verification
Status of the ESS High Power RF Systems
LIU BWS Firmware status
Presentation transcript:

LIU – SPS Low level RF Updates and schedule G. Hagmann, 20.09.2017

Overview SPS LLRF upgrade uTCA VME/uTCA uTCA?

Cavity Controller – RF test stand TWC 200MHz 3 section BAF3 uTCA platform

Cavity Controller – RF test stand uTCA (Direct-sampling) Custom design (BE-CO, BE-RF) DS8VM1 (Desy/Struck) SIS8300-KU (Desy/Struck) 125MHz/250MHz

Cavity Controller(s) - uTCA Item Qty Remarks Status uTCA.4.1 crate 4 (2 for RF) NAT NATIVE_R9 9U, 12 slots AMC Received Power module 6 (2 for RF) NAT-PM-AC600D 600W, 12V MCH 4 NAT-MCH-PHYS CPU NAT-MCH-RTM & CPU module Timing module carrier 4 1 NAMC-PMC NAMC-PMC-T261 (double width) AMC extender 2 NAMC-EXT-RTM-F-PS (uTCA.4) RTM extender NAMC-EXT-RTM-R (uTCA.4) AMC – SIS8300-KU 8AC, 2DC DAC & Interlock to zone3 White-rabbit option DRTM – DWC8VM1 ? RTM with down-converter, Vector modulator Under eval DRTM – DS8VM1 3 (R12) 1 (R11) RTM for direct-sampling, Vector modulator 1x (R11) Received 2 repaired! R12 Expected to be delivered week 38

Cavity Controller - RF test stand Cavity combiner Prototype V1 under test (1x) Cables received for 1 cavity (time of flight compensation) 1 combiner per section => 3 needed for test stand V2 series (4x) will be launched by end of Sept. Will be ready for installation (1 cavity) by December 2017 Mechanical support to be designed (BE-RF-PM ?)

Cavity Controller - RF test stand Cavity controller (uTCA) Hardware ready (uTCA: CPU, MCH, RTM (DS8VM1), AMC (SIS8300)) Europa crate Predriver: production launched RF calibration (filtering, attenuation, …): to be developed Firmware BE-CO will provide the infrastructure by end Sept (PCIe bridge, White-rabbit core, interfaces (SPI,…), DDR interface) BE-RF is developing the RF feedback (1-turn feedback, polar loop, demodulator, modulator, …) Software Driver: Encore for PCIe/PCI under dev. By BE-CO (by end 2017) FESA class (wait for Encore or use BE-CO internal library -UAL)

Original 2017 schedule for uTCA RF Test stand uTCA crate received SIS8300 (AMC) received DS8VM1 (RTM) uTCA received BE-CO firmware (AMC) ready RF test stand Postponed to beginning 2018 Encore for PCIe/PCI (BE-CO) Dec 2017: uTCA platform go/no-go uTCA RF feedback in lab

SPS-LIU RF power (LS2) SPS-LIU Master plan We are here Beam for physics Long Shutdown Commissioning Operation Technical Stop RF power upgrade (courtesy E. Montesinos) LLRF hardware commissioning Bit too short!