UCG- TAG OUT LOCK OUT.

Slides:



Advertisements
Similar presentations
Lockout/Tagout Awareness Training
Advertisements

Basic safety rules and procedures for controlling hazardous energy
Lockout/Tagout Training: 29 CFR Lockout Tagout Standard
Lockout/Tagout/Verify Awareness
Lock Out/Tag Out Training Lock-Out/Tag-Out OSHA Definition. Lockout/Tagout (LOTO) refers to specific practices and procedures to safeguard employees.
Today’s Meeting There are approximately 25 people killed by electricity per year in Australia (average for the last 7 years), 700 people are hospitalised.
De-energization and Lockout
Hazardous Energy Control Brady Corp. OR-OSHA
LOCKOUT/TAGOUT.
Lockout and Tagout.
Lockout-Tagout (Control of Hazardous Energy) This training program is designed to inform management of the requirements of the Lockout-Tagout Program for.
Lockout/Tagout (The Control of Hazardous Energy)
Controlling Hazardous Energy
Control of Hazardous Energy – Lockout/Tagout 29 CFR
Lockout/Tag-out Procedures
Lockout Tag out Training2009. Control of Hazardous Energy Policy Personal locks & keys will be issued to employees by their Safety/Training Coordinator.
Lockout/tagout Authorized employees
Lockout/Tagout Affected Employees. © Business & Legal Reports, Inc Session Objectives You will be able to: Recognize hazardous energy sources Carry.
Lockout/Tagout Authorized Employee Slide Show Notes
Trindel Insurance Fund
Control of Hazardous Energy Lockout/Tagout 29 CFR
Copyright  Progressive Business Publications Control of Hazardous energy Blue Ridge Safety Association Safety Training Presentations.
LOCKOUT/TAGOUT ENERGY CONTROL PROGRAM
/0309 Copyright ©2003 Business and Legal Reports, Inc. BLR’s Safety Training Presentations Lockout/Tagout Refresher 29 CFR
Lockout/Tagout for Affected Employees Understand the Basics.
1 29 CFR THE CONTROL OF HAZARDOUS ENERGY.
 The purpose of this Lockout/Tagout Procedure is to have a positive method of confirming that a piece of equipment, machine, or device is not energized.
Control Of Hazardous Energy
Lockout/Tagout Authorized Employees: Learn the Procedures.
Lockout/Tag Out Guidelines Procedures to protect employees and co-workers.
Electricity Compressed Air Steam Hydraulic Pressure Gas Lines etc.
LOCKOOUT/TAGOUT b THE ULTIMATE GOAL IS: To implement policies and procedures to prevent, as necessary, the release of hazardous energy from power sources--or.
Lockout/Tagout.
Basic Lockout Guidelines
Copyright © 2012 American Safety Management Inc. Lockout Tagout.
Procedures to protect employees and co-workers Basic Lockout Guidelines Procedures to protect employees and co-workers.
Lockout - Tagout Control of Hazardous Energy OSHA Standard
© BLR ® —Business & Legal Resources 1408 Lockout/Tagout Authorized Employee.
Striving For Safety Excellence HunterDouglas Corporate Environmental, Safety, Risk Management Lock Out Tag Out Affected Employees.
LOCK-OUT/TAGOUT SAFETY SAFELY MAINTAINING EQUIPMENT AND MACHINES.
29 CFR  In this course, we will cover the following:  The need for energy control procedures  Methods of lockout / tagout  Employer’s responsibilities.
Lockout/tagout for authorized employee
LOCKOOUT/TAGOUT THE ULTIMATE GOAL IS: To implement policies and procedures to prevent, as necessary, the release of hazardous energy from power sources--or.
Lockout Tagout Program
LOCKOUT/TAGOUT/VERIFY
Lockout/Tagout Standard
Lock Out / Tag Out The Control of Hazardous Energy
Energy is a good servant but a cruel master.
The Control of Hazardous Energy (Lockout-Tagout)
Lock Out & Tag Out.
Sources of Energy ELECTRICAL MECHANICAL PNEUMATIC FLUID AND GASES
Lockout/tagout Refresher training
Lockout/Tagout/Verify Awareness
Energy Control (Lockout/Tagout)
Energy Control Procedures Lockout/Tagout 29 CFR
Proper Lockout Procedure
CONTROL OF HAZARDOUS ENERGIES (LOCKOUT / TAGOUT)
SAFE WORK INSTRUCTIONS
Control of Hazardous Energy Lockout/Tagout 29 CFR
The Control of Hazardous Energy (Lockout-Tagout)
Lock Out Tag Out Michael Vangeli 11/15/2018.
Control of Hazardous Energy
Presented by Environmental Health and Safety
Lock Out Tag Out.
Lockout/tagout Refresher Training
LOCKOUT/TAGOUT By: Kory Hildebrand.
Isolation Procedure Topic 2, Unit 6.
Presentation transcript:

UCG- TAG OUT LOCK OUT

SAFE WORK PROCEDURE SCOPE: Definitions Reasons for Isolation Lock-out and Tag-out Types of Isolation When is Isolation Required? Authority to Perform Isolations Isolation Process When is Lock-out and Tag-out Required? Lock-out and Tag-Process Removal of Lock-out and Tag-out Returning Plant to Service Damaged or Defective Plant Process for using an “Out of Service Tag” Removal of “Out of Service Tag” Working on Equipment that is Out of Service

DEFINITIONS. Isolation: de-energising plant/equipment and/or disconnecting services such as gas or water or electricity Lock-out: applying a personal lock to the means of isolation that physically prevents activation of plant, equipment or services Tag-out: a tag that warns others that the plant, equipment or service is not safe to use

REASONS FOR ISOLATION LOCK-OUT & TAG OUT . Isolation of Services or Maintenance, of Plant & Equipment Damaged or Defective Plant & Equipment Note: There are different tags and requirements for each process

Types of isolation may include: ISOLATION TYPES Types of isolation may include: Energy sources such as: Electrical power Stored kinetic energy (e.g. suspended loads) Hydraulic power Pneumatic (air) power Services such as: Gas Water Supply of other substances such as fuels and oils

Electrocution When is Isolation Required? Isolation is required when one or more people are conducting: Maintenance on plant or Excavation or concrete cutting or Drilling where there is a risk of: Electrocution Contact/entanglement with moving parts Release or ignition of a substance Accident or inadvertent start-up Use of plant/equipment in an unsafe condition

Authority to Perform Isolations Isolations should be performed by competent persons who have received training in the correct isolation method for the specified plant, equipment or service. In some instances -This may mean enlisting the services of a tradesperson such as an electrician.

The following process MUST be followed: Isolation Process The following process MUST be followed: Notification to all persons who may be affected Lower elevated objects/equipment (if practicable) Isolate at the main energy supply e.g. Electricity switchboard or Water meter Apply personal danger tags and personal locks Verify the effectiveness of the isolation before work

Examples of Personal Locking Devices When is Tag Out Lockout required A Lock-out / Tag-out system must be used each time plant, equipment or services are isolated for maintenance, repair or cleaning. Examples of Personal Locking Devices A hasp is used to attach multiple padlocks where more than 1 person is working under the protection of a specific isolation An electrical cord lock-out device used to prevent connection of electrical equipment to the mains power supply Padlock with a unique key that can be used to lock isolator switches in the safe OFF position

Lock-out & Tag-out Process Each person performing work under isolation must securely attach their Personal Danger Tag, stating: Name Date and time of placement Reason for attaching tag Tags are to be used once only Lock-out / Tag-outs must be applied to the point of isolation to prevent accidental start-up. Where multiple people are involved, each person must attach their personal lock.

Removal of Lock and Tag-out Personal locks and tags may only be removed by the individuals who placed them and only once their work has been completed to a safe standard Failure of a person to remove their personal lock or tag upon completion of work may result in disciplinary action

Prior to start-up: All locks and tags must be removed Return Plant or Pemises to Service Prior to start-up: All locks and tags must be removed All safeguards must be correctly fitted Notify any persons who may be affected by the start-up Visually inspect and/or conduct a head-count to ensure all workers are well clear of moving parts or electrical supply

Returning Plant to Service It is strictly prohibited to activate plant, equipment or services while a tag or lock is in place.

Damaged or Defective Plant All employees, contractors and visitors must immediately report damaged or defective plant / equipment to their Site Manager or Supervisor. If there is any risk of harm to people or plant/equipment, an out of service tag must be used.

Ensure: The item of plant / equipment is safely isolated Process for using an “Out of Service” Tag Ensure: The item of plant / equipment is safely isolated An Out of Service Tag is securely attached to the means of isolation The defective item is removed from the work area where practicable Report defective item to Manager or Supervisor

Removal of “Out of Service Tag” The person who placed the “Out of Service Tag” may remove it at any time provided they are competent to determine the plant/equipment is able to resume safe operation.

Removal of “Out of Service tag” Persons authorised to remove another person’s “Out of Service Tag” are: A tradesperson who has repaired the fault and is satisfied that the item is safe to resume operation A Supervisor / Leading Hand in charge of the repair work and who is satisfied that the item is safe to return to service

Working on Equipment that is out of Service REMEMBER “Out of Service Tags” do not provide you with protection because they do not identify your presence on the job. It is your responsibility to place your personal danger tag and lock over the “Out of Service Tag” for the duration of your work on the equipment.

Please proceed with the assessment. Thank You Please proceed with the assessment.