Cambourne to Cambridge Better Bus Journeys

Slides:



Advertisements
Similar presentations
A34 Corridor Strategy Strategic Route Improvements 25 th November 2004 working together with.
Advertisements

SOUTHERN FRINGE DEVELOPMENTS –CONSTRUCTION MANAGEMENT STRATEGY JUNE 2011 Outline /Full Planning Permissions –provisions 1. Strategic Construction Environmental.
Limerick City Green Routes Corridor Selection Study Presentation to Limerick City Council 14 th February 2008.
Consultation on key routes which run parallel to Oxford Road corridor September 2012 Bus priority package.
CityCo, Piccadilly Hoteliers Forum
Urban Transportation Council Green Guide for Roads Task Force TAC 2009 Annual Conference and Exhibition Vancouver.
D2 Roadway Discussion Sound Transit Board September 22, 2011.
Hertfordshire Congestion Topic Group 11 June 2010.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Kilkenny City and Environs Draft Mobility Management Plan
Seminar 23rd November 2001 Other Policies: Demand Management & Highway Investment Professor Marcial Echenique.
Joint Transport Forum I Rapid Transit Line 2 Our Future Transport I West of England Sub Region.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
South/West Corridor Transit Improvements PRIMO & ENHANCED AMENITIES PLANNING PHASE September 9, 2014 Planning & Project Development Committee August 11,
Public Consultation A RE YENG REVIEW LINE 2B 13 August 2015.
TRANSPORT The Cambridge Futures response to the Draft Structure Plan Dr Tony Hargreaves, Cambridge Futures.
Transit Partnerships. Goal of Presentation Review the Transit Partnership Proposal Seek Ordinance Approval: –Authorizing the Mayor to submit Transit Partnership.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
Planning the Future to enhance and sustain our town PETERSFIELD TOWN DESIGN STATEMENT.
Transport Update Chris Carter Transport Strategy Manager.
BELMONT TRANSPORT PACKAGE A49 – B4349 (Relief Road Southern Section) Meeting 14 June 2013.
Integrated Transport Policy / Regional Transport Plan Environment & Regeneration Scrutiny Committee 13 December 2006.
Salford Core Strategy Eccles Political Executive Briefing 14 November 2008.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
Simon Amor Asset Development Manager
Raumati Road Corridor Consultation and Corridor Assessment
Land west of Grace Crescent, Hardwick Presentation to Hardwick Parish Council 23/08/2016.
Connecting Oxfordshire: Bus Partnership and the Oxford Transport Strategy 21 April 2016 John Disley Transport Policy & Strategy.
I-66 OUTSIDE THE BELTWAY Shrevecrest HOA JUNE 21, Susan Shaw, P. E
Transport Strategy in Cheshire West and Chester Alison Knight Director of Places Strategy 3rd June 2016.
East Sussex Strategic Partnership Transport Update 25 April 2017
Options consultation launch March 2017
A Presentation to: River to Sea TPO Board October 26, 2016.
Four Winds Condominium Association August 2, 2017
Dartmouth Road Public Realm Enhancements – Preliminary Design
JUAN DE FUCA PEDESTRIAN CROSSING Transportation and Public Infrastructure Committee Colwood, BC 1 October 2012.
Milton Road LLF Design Engagement Paul van de Bulk 12 September 2017.
A Presentation to: River to Sea TPO BPAC November 9, 2016.
Edinburgh Fastlink.
A47 / A12 Corridor Improvement schemes
Western Orbital Local Liaison Forum 11TH September 2017.
Cambourne to Cambridge
The Oakton Condominium Association September 12, 2017
Friday, December 16th.
I-66 Outside the Beltway Design Public Hearing Meetings November 13, 14 & Susan Shaw, P.E., Megaprojects Director Virginia Department of.
21st Century School Buildings Plan
Cambourne to Cambridge Better Bus Journeys – End of Stage Report
Thornbury Road new green-man cycle and pedestrian crossing
Cambourne to Cambridge Better Bus Journeys East of M11 Workshop Summary 13 November 2018.
More people cycling in Edinburgh and more investment
D Line Station Plan Overview
D Line Station Plan Overview
D Line Station Plan Overview
City Connect 2 LEEDS CITY CENTRE IMPROVEMENT JOHN WHITE – PROJECT LEAD
Chisinau-Gurgiulesti Motorway, Construction of Comrat Bypass
Queens Quay Site Clydebank Waterfront
M14A/D Select Bus Service
KEYNOTE STAGE SPONSOR.
Harbour Island Force Main Replacement
HE Designated Funds Cycling Safety and integration (CSI)
Central Avenue Rapid Transit
Cambourne to Cambridge Better Bus Journeys: On Road Option
Production Month Sun Hours K Monthly Kwh Tou Peak Value After Kwh
Western Orbital: M11 J11 Park and Ride Provision
Engagement Group 13 February 2018.
2015 January February March April May June July August September
GCP Transport Update Meeting for: M11 J11 Park & Ride Engagement Group
Histon Road LLF Resolutions and Programme
Western Orbital.
West Cervantes Traffic Feasibility Study Jill Lavender, Transportation Planner Cory Wilkinson, AICP CEP, Project Manager Mary Morgan, PE, Engineer.
Presentation transcript:

Cambourne to Cambridge Better Bus Journeys A428 Busway Corridor – Option 3 & 3A St Neots Road, Hardwick 07/03/2017 Cambourne to Cambridge Better Bus Journeys

High Level Timetable Step 1 Early 2014 Identify feasible options Stage Month Year Milestone Step 1 Early 2014 Identify feasible options Step 2 June 2015 City Deal Board chose 6 options to consult on October - November Public consultation on options March 2016 Local Liaison Forum created September Report and papers to be published on the options: October A428/A1303 Report to Board Step 3 November - July 2017 Refinement of Recommended Option Public consultation on option May 2018 Completion of full outline business case for option Report to Executive Board on a full outline business case for option Step 4 December 2020 Substantially complete statutory approvals April 2021 Report to Executive Board on final scheme authority to construct Step 5 Summer 2024 Substantially complete construction This is a summary of the Shortlisted options in these areas

Concepts consulted on 2015 07/03/2017 Cambourne to Cambridge Better Bus Journeys

Catchment Area 07/03/2017 Cambourne to Cambridge Better Bus Journeys

Madingley Mulch to Northampton St Northampton St to Madingley Mulch Comparator Journey Direction Existing Services Option 1 Option 3/3a Journey Times   Madingley Mulch to Northampton St INBOUND AM peak = 20 mins AM peak = 14 mins AM peak = 7.5 mins Off peak = 17 mins Off peak = 13 mins Off peak = 7 mins PM peak = 20 mins PM peak = 12.5 mins PM peak =7.5 mins Northampton St to Madingley Mulch OUTBOUND AM peak = 11 mins Off peak = 9 mins PM peak = 10 mins PM peak = 7.5 mins Data source: VIX data for Citi 4 service VIX data for Newmarket P&R service Based on VIX data for Citi 4 and CGB Reliability Inbound - AM Peak – 64%; IP = 80%; PM peak = 65% Inbound - AM Peak – 80%; IP = 71%; PM peak = 79% (Taken from VIX data for Newmarket Rd Park and Ride) Aims to achieve 99% reliability Outbound – AM peak = 90%; IP = 84%; PM peak = 89% Outbound - AM Peak – 73%; IP = 68%; PM peak = 72% (Taken from VIX data for Newmarket Rd Park and Ride) Cycling Inbound and Outbound Cycling as existing provision – on road along Madingley or offline through Coton and Cambridge West Offline Coton route would remain and footways would reduce along Madingley Road, Cyclists would have to use bus lanes on Madingley Road where no shared cycleway exists – this would affect Bus journey times and reliability A cycleway will be provided adjacent to the busway providing traffic free routes into Cambridge West and to Grange Road. Costs n/a Tranche 1 costs = £32.6million including P&R site (Out-turn costs and capital investment) Tranche 1 costs = £72.34million including P&R site. (Out-turn costs and capital investment) 07/03/2017 Cambourne to Cambridge Better Bus Journeys

Potential Route Alignments 07/03/2017 Cambourne to Cambridge Better Bus Journeys

Option 3 07/03/2017 Cambourne to Cambridge Better Bus Journeys

Option 3A – Potential Arrangements Proposed Busway constructed adjacent to St Neots Road. Footway/Cycleway constructed north of the Busway. Footway/cycleway constructed adjacent to St Neots Road with soft verge separation. Busway constructed north of the footway/cycleway. 07/03/2017 Cambourne to Cambridge Better Bus Journeys

Option 3A – Potential Arrangements Busway constructed adjacent to St Neots Road. Footway/cycleway constructed south of St Neots Road Busway constructed north of St Neots Road with trees/vegetation separation. Footway/cycleway constructed south of St Neots Road 07/03/2017 Cambourne to Cambridge Better Bus Journeys

Possible traffic calming measures Improved gateway features on the approach to Hardwick. Highlighting speed limit and entry into a village environment to encourage reduced speed. Landscaping to reduce the openness of the route and visually reduce the width of the corridor. Provision of traffic islands within centre of the carriageway to encourage reduced speed, with speed limit repeater markings. Provision of central hatch and edge line road markings along the carriageway to visually reduce the carriageway width. 07/03/2017 Cambourne to Cambridge Better Bus Journeys

Option 3A – Arrangement 3A Development Proposed Busway positioned away from St Neots Road, retaining the existing treeline north of St Neots Road. Proposed footway/cycleway constructed adjacent to St Neots Road to the south. 07/03/2017 Cambourne to Cambridge Better Bus Journeys

Option 3A – Arrangement 3A Development Proposed Busway positioned away from St Neots Road separated by trees/vegetated area. Segregation islands provided in centre of St Neots Road Proposed footway/cycleway adjacent to St Neots Road. 07/03/2017 Cambourne to Cambridge Better Bus Journeys

Option 3A – Arrangement 3A Development Proposed Busway positioned adjacent St Neots Road. Fencing provided to separate the busway from St Neots Road where required. Proposed footway/cycleway adjacent to St Neots Road. 07/03/2017 Cambourne to Cambridge Better Bus Journeys

Option 3A – Arrangement 3A Development Proposed Busway positioned away from St Neots Road, retaining existing treeline north of St Neots Road. Areas of additional planted verge provided south of St Neots Road. 07/03/2017 Cambourne to Cambridge Better Bus Journeys

Environmental Concerns Pollution – All buses at least Euro 6 emissions standard Noise – All existing noise attenuation to be retained Traffic calming reduce the attractiveness of through route from proposed Bourn development Busway stops and junctions are to be lit (in addition to park & ride sites) 07/03/2017 Cambourne to Cambridge Better Bus Journeys

Busway Design measures or other relevant mitigation measures can be taken to reduce or avoid effects. In some instances environmental enhancements may result e.g. the creation of new or better landscape and ecological habitats. The overall approach to the design measures will be defined by local and national policy and guidance. 07/03/2017 Cambourne to Cambridge Better Bus Journeys

Frequency – 6-9 buses per hour Services Frequency – 6-9 buses per hour Stops – In all options Hardwick has a stop on the busway Journey Times – Hardwick to City Centre in 13 minutes 07/03/2017 Cambourne to Cambridge Better Bus Journeys