Project Scheduling: Lagging, Crashing and Activity Networks Chapter 10 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall10-1.
Advertisements

Project Scheduling: Lagging, Crashing and Activity Networks Chapter 10 © 2007 Pearson Education.
9-1 ELC 347 project management Day 19. Agenda Integrative Project –IP part 4 not graded yet –Part 5 Due Nov 22 (page 318) –Any of the first five sections.
Project Scheduling: Lagging, Crashing, and Activity Networks
Project Scheduling: Lagging, Crashing and Activity Networks
Day 19 ELC 347/BUS 348/PSA 347.
Managing Projects Chapter 14.
ELC 347 project management Week 11. Agenda Integrative Project –3rd part Graded –4 th part due next week –Outline of deliverables (posted in WebCT)Outline.
8-1 Scheduling Scheduling Defined Gantt Charts Network Techniques: PERT and CPM Determining Task Durations Probability and Simulation Some Examples.
Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Sixth Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich.
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall o P.I.I.M.T o American University of Leadership Ahmed Hanane, MBA, Eng, CMA, Partner.
Project Scheduling: Networks, Duration estimation, and Critical Path.
9-1 Project Scheduling: Networks, Duration Estimation, and Critical Path Chapter 9 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
5/4/20151 NETWORK SCHEDULING TECHNIQUES. 5/4/20152 Network Diagrams  PMI defines the scheduling process as: “the identification of the project objectives.
Project Scheduling: Networks, Duration Estimation, and Critical Path
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Day 15.
Chapters 8, 9, and 10 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
Project Scheduling: Networks, Duration estimation, and Critical Path
Copyright 2012 John Wiley & Sons, Inc. Chapter 8 Scheduling.
Project Management Dr. Everette S. Gardner, Jr.. Project Management2 PERT / CPM advantages 1. Disciplined planning 2. Realistic objectives 3. Unambiguous.
Project Time Management
Operations Management Contemporary Concepts and Cases Chapter Fourteen Project Planning and Scheduling Copyright © 2011 by The McGraw-Hill Companies,
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall o P.I.I.M.T o American University of Leadership Ahmed Hanane, MBA, Eng, CMA, Partner.
Where We Are Now. Where We Are Now Developing the Project Plan The Project Network A flow chart that graphically depicts the sequence, interdependencies,
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall o P.I.I.M.T o American University of Leadership Ahmed Hanane, MBA, Eng, CMA, Partner.
THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6.
Project Management Chapter 8 (Crashing).
Project Management: A Managerial Approach
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
1IT Project Management, Third Edition Chapter 6 Chapter 6: Project Time Management.
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
PowerPoint presentation to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Chapter 6: Project Time Management Information Technology Project Management, Fourth Edition Using Critical Path and MS Project 2003 Tuesday, February.
Lags in Precedence Relationships
ENGM 631 Optimization Ch. 10: PERT/CPM. Great Pyriamid of Cheops (2,500 B.C.) 42,300,000 Stone Blocks 440 Stories 4Accuracy of 0.04 inch 413 acres level.
Project Planning & Scheduling What is a “project”? Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time Networks.
Managing the Information Systems Project Cont’d
Project Management MGT 30725
Project Management: PERT/CPM
Project Planning & Scheduling
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
The Project Schedule and Budget
deterministic Fixed and known in advance, representing a
Project Scheduling Lecture # 1.
Project Planning & Scheduling
Project Management for Business
Project scheduling Chapter 10 Copyright ©2016 Pearson Education, Inc.
Chapter 6: Project Time Management
Projects: Critical Paths
CHAPTER 6 PROJECT TIME MANAGEMENT
PROJECT MANAGEMENT WITH CPM/PERT.
Project Scheduling: networks, duration estimation, and critical path
Project Time Management
Project Management: A Managerial Approach
Project Scheduling: Lagging, Crashing and Activity Networks
Project Time Management
ELC 347 project management
Project Time Management
Project Time Management
AOA A style of project network diagram in which arrows
Importance of Project Schedules
PROJECT SCOPE, SCHEDULE, AND RESOURCE MANAGEMENT
Project Management Project management is the discipline of organizing and managing resources in such a way that these resources deliver all the work required.
Project Time Management
CHAPTER 6 PROJECT TIME MANAGEMENT
Scheduling.
Presentation transcript:

P.I.I.M.T American University of Leadership Ahmed Hanane, MBA, Eng, CMA, Partner email: ahanane360@gmail.com

Project Scheduling: Lagging, Crashing, and Activity Networks Chapter 10 Project Scheduling: Lagging, Crashing, and Activity Networks

Chapter 10 Learning Objectives After completing this chapter, students will be able to: Apply lag relationships to project activities. Construct and comprehend Gantt charts. Recognize alternative means to accelerate projects, including their benefits and drawbacks. Understand the trade-offs required in the decision to crash project activities. Develop activity networks using Activity-on-Arrow techniques. Understand the differences in AON and AOA and recognize the advantages and disadvantages of each technique.

FIGURE 10.1 Boeing’s 787 Dreamliner Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall

Lags in Precedence Relationships The logical relationship between the start and finish of one activity and the start and finish of another activity. Four logical relationships between tasks Finish to Start Finish to Finish Start to Start Start to Finish

Finish to Start Lag Most common type of sequencing Shown on the line joining the modes Added during forward pass Subtracted during backward pass This lag is not the same as activity slack 0 A 6 Spec Design 6 6 B 11 Design Check 5 15 C 22 Blueprinting 7 Lag 4

Finish to Finish Lag Two activities share a similar completion point The mechanical inspection cannot happen until wiring, plumbing, and HVAC installation are complete 10 A 16 Plumbing 6 16 B 21 HVAC 5 21 C 22 Inspection 1 15 D 21 Wiring Lag 5

Start to Start Lag Logic must be maintained by both forward and backward pass 31 A 33 Plumbing 6 33 B 36 HVAC 5 36 C 37 Inspection 1 30 D 36 Wiring Lag 3

Start to Finish Lag Least common type of lag relationship Successor’s finish dependent on predecessor’s start 30 D 36 Wiring 6 Lag 3 22 A 28 Plumbing 6 28 B 33 HVAC 5 33 C 34 Inspection 1

Gantt Charts Establish a time-phased network Can be used as a tracking tool Benefits of Gantt charts Easy to create and comprehend Identify the schedule baseline network Allow for updating and control Identify resource needs

Completed Gantt Chart for Project Delta FIGURE 10.8   Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall

Gantt Chart for Project Delta with Critical Path Highlighted FIGURE 10.9   Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall

Gantt Chart with Resources Specified FIGURE 10.10   Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall

Gantt Chart with Lag Relationships FIGURE 10.11   Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall

Principal methods for crashing The process of accelerating a project Principal methods for crashing Improving existing resources’ productivity Changing work methods Compromise quality and/or reduce project scope Institute fast-tracking Work overtime Increasing the quantity of resources

Managerial Considerations Determine activity fixed and variable costs The crash point is the fully expedited activity Optimize time-cost tradeoffs Shorten activities on the critical path Cease crashing when the target completion time is reached the crashing cost exceeds the penalty cost

Project Activities and Costs Table 10.1 Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall

FIGURE 10.14 Time–Cost Trade-Offs for Crashing Activities Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall

FIGURE 10.15 Fully Crashed Project Activity Network Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall

FIGURE 10.16  Relationship Between Cost and Days Saved in a Crashed Project Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall

Activity on Arrow Networks Activities represented by arrows Widely used in construction Event nodes easy to flag Forward and backward pass logic similar to AON Two activities may not begin and end at common nodes Dummy activities may be required

Notation for Activity-on-Arrow (AOA) Networks FIGURE 10.18 Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall

Sample Network Diagram Using AOA Approach FIGURE 10.19   Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall

Representing Activities with Two or More Immediate Successors(Wrong) FIGURE 10.20A   Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall

Alternative Way to Represent Activities with Two or More Immediate Successors (Wrong) FIGURE 10.20B   Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall

Representing Activities with Two or More Immediate Successors Using Dummy Activities (Better) FIGURE 10.20C   Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall

Partial Project Delta Network Using AOA Notation FIGURE 10.21   Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall

Completed Project Delta AOA Network FIGURE 10.22   Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall

Project Delta Forward Pass Using AOA Network FIGURE 10.23 Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall

Project Delta Backward Pass Using AOA Network FIGURE 10.24   Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall

Controversies in the Use of Networks Networks can be too complex Poor network construction creates problems Networks may be used inappropriately When employing subcontractors The master network must be available to them All sub-networks must use common methods Positive bias exists in PERT networks

Summary Apply lag relationships to project activities. Construct and comprehend Gantt charts. Recognize alternative means to accelerate projects, including their benefits and drawbacks. Understand the trade-offs required in the decision to crash project activities. Develop activity networks using Activity-on-Arrow techniques. Understand the differences in AON and AOA and recognize the advantages and disadvantages of each technique.