FCT and CERN Portuguese Trainee Programme Report

Slides:



Advertisements
Similar presentations
TE / CRG / Paulo Gomes The Control System for the LHC tunnel cryogenics, p. 1 CERN Portuguese Teachers Programme, 7 Sep 2011 Dr. Paulo Gomes on behalf.
Advertisements

FUNDAÇÃO PARA A CIÊNCIA E TECNOLOGIA FCT Trainee Program Follow Up João Rodrigo Alvelos Ferreira | Started March 2013 October 2014 TE-VSC-ICM.
Time Stamping and archiving of PLC data
European Organization for Nuclear Research PLC services Jerónimo Ortolá, Jacky Brahy EN-ICE Workshop 23 April 2009.
Lukasz ZwalinskiLHCb CO 2 cooling; 1 IBL CO 2 cooling control system Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Michal Zimny,
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
Vacuum, Surfaces & Coatings Group Technology Department Vacuum tests for CLIC module prototypes 6 November 2013 C. Garion2 Outline: Reminder: specification.
(C.Betz Kick-Off Meeting Vacuum 5th March 2013) Agenda: First steps using WinCC OA First steps using UNICOS V5 Vacuum Test Rig Principles of.
ISOLDE Vacuum Controls (CERN-GSI WS), S. Blanchard TE-VSC-ICM UNICOS Vacuum Objects Specifications Review Sebastien Blanchard TE/VSC Interlocks,
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
LTC Extended days, 03 March’08 J.M. Jimenez, AT Vacuum Group LHC Vacuum commissioning J.M. Jimenez On behalf of AT-VAC.
CPC (C ONTINUOUS P ROCESS C ONTROL ) SCADA UNICOS: UN IFIED I NDUSTRIAL CO NTROL S YSTEM CPC (C ONTINUOUS P ROCESS C ONTROL ) SCADA 1 Marco Boccioli -
Workshop “Vacuum systems of Synchrotron Light Sources“ organized by MAX-LAB & ALBA Barcelona, th September 2005 Instrumentation and Vacuum Control.
Openlab Workshop on Data Analytics 16 th of November 2012 Axel Voitier – CERN EN-ICE.
Friday April 27, 2012, Cascina, Pisa Page 1 of 12 Cryotrap Control using Tango Control System Martin Mohan Software Engineer EGO.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
European Organization for Nuclear Research LHC Gas Control System Applications G.Thomas, J.Ortola Vidal, J.Rochez EN-ICE Workshop 23 April 2009.
CERN Safety Alarm Monitoring Presented by Luigi Scibile ST division / MO group.
The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team.
Vacuum Controls Status MACS week December 2010 PP a-JWA-VacControlStatus.ppt Joachim Wallner 1.
FAIR Accelerator Controls Strategy
LHC Cryogenics Control: INTEGRATION OF THE INDUSTRIAL CONTROLS (UNICOS) AND FRONT-END SOFTWARE ARCHITECTURE (FESA) APPLICATIONS Enrique BLANCO Controls.
MARCO UNICOS based control system CERN Lukasz Zwalinski – PH/DT Maciej Ostrega – PH/DT.
Training in Vacuum Technology for JUAS 2013 Students
Chiller control system Lukasz Zwalinski – PH/DT.
Chiller control system Specification meeting Lukasz Zwalinski – PH/DT.
Status of Vacuum Control System MACS week June 2011 PP a-JWA-VacControlStatus.ppt Joachim Wallner 1.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
Vacuum Controls framework for the LHC and its injectors Sebastien Blanchard CERN TE-VSC Introduction to the Vacuum Controls framework for the LHC and its.
Isabelle Laugier, AT/VAC/ICM Section May 6 th 2008 LHC Vacuum Control system.
“The LHC GCS Framework” Geraldine Thomas CERN, IT-CO A complete PLC and PVSS automatic code Generation.
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
European Organization for Nuclear Research LHC Gas Control System Applications Generation to Deployment phases Strategy/Principles.
Follow-up meeting of the Administrative Agreement between FCT and CERN for the on-the- job training of Portuguese technical graduates Tiago André Soares.
The Control System for the LHC tunnel cryogenics Controlling Cool Accelerators Controle da Criogenia de Aceleradores de Partículas Dr. Paulo Gomes CERN.
ISOLDE Vacuum Controls (CERN-GSI WS), S. Blanchard TE-VSC-ICM UNICOS implementation in ISOLDE Sebastien Blanchard TE/VSC Interlocks, Controls.
Claudia Dias Vacuum, Surfaces & Coatings Group Technology Department Claudia Dias CERN, Technology Department Vacuum, Surfaces and Coatings Group 2 |
Philippe Gayet Engineering Department OPERATION AND MAINTENANCE INTEGRATED A STEP FURTHER? Philippe GAYET EN-ICE, CERN Asset and Maintenance Management.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
MARCO control system Munich Lukasz Zwalinski – PH/DT Maciej Ostrega – PH/DT.
1 Cryogenics Instrumentation & Controls Commissioning for the LHC AB/CO viewpoint Enrique Blanco AB/CO IS.
Vacuum Controls framework for the LHC and its injectors Sebastien Blanchard CERN TE-VSC Integration of controllers in SCADA using OPC Server Goal: Improve.
LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 1/52) AB-CO Measurement & Analysis Present status of the individual.
Miguel Angel Quero Corrales
OPERATES SCADA OPERATION SYSTEM Explain the operational SCADA
Combining safety and conventional interfaces for interlock PLCs
SCADA Selection and Usage at CERN
SCADA & Monitoring Developments for Vacuum
Presented by Li Gang Accelerator Control Group
Vacuum Controls Quality Management
Laboratorio per dottorandi 2017 Particle Accelerators Control System
PLC-based control systems at SOLEIL - ICALEPCS 2017
Status of Vacuum Control System
Configuration Management and Layout Database ELENA Project
Recent developments in the Vacuum Control Software
How SCADA Systems Work?.
Georgia Gkioka TE-VSC-ICM National Technical University of Athens
UCPC RP Presentation for GSI
UNICOS: UNified Industrial COntrol System CPC (Continuous Process Control) Basic course SESSION 4: SCADA UCPC 6 UNICOS-Continuous Process Control Check.
MAUVE CO2 cooling review
Software Developer for Vacuum Control System (BE3528)
BE/ICS Monitoring Systems Survey Results
Unicos Vacuum Package SCADA Features Vacuum Controls S. Blanchard
Development of built-in diagnostics in the RADE framework (EN2746)
M. Oveissi, D. Eckard*, A. Rose+, B. Shneiderman+, G. W. Rubloff
Robert Gomez-Reino Garrido
PLC / SCADA / HMI Controllers: Name : Muhammad Zunair Comsats University Date: 28-October-2018.
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Vacuum Control System for Monolith Vacuum
Field installable, upgradeable and scaleable
Presentation transcript:

FCT and CERN Portuguese Trainee Programme Report Claudia Dias CERN, Technology Department Vacuum, Surfaces and Coatings Group Interlocks Controls Monitoring FCT and CERN Portuguese Trainee Programme Report | 31st March, 2017

Resume Vacuum at CERN – Overview Vacuum Control SCADA System – Developments Vacuum Equipment Labelling – Campaign Vacuum Monitoring Application – Development Training Competences FCT and CERN Portuguese Trainee Programme Report | 31st March, 2017

Vacuum at CERN – Overview Supervision Beam and Insulation vacuum systems > 128km of vacuum chambers across all accelerators Pressure range from 10-4 to 10-11 mbar achieved by: ~3000 vacuum pumps ~3000 vacuum gauges ~500 sector valves How to supervise and control such a large system? 7 SCADA servers ~300 PLCs Backboned by vacuum-specific software frameworks Control Field FCT and CERN Portuguese Trainee Programme Report | 31st March, 2017

Vacuum Control SCADA System – Developments Valve Monitoring panel Real-time and continued valve fatigue follow-up Archiving of valve behaviour main parameters User notification features (system warnings, errors) FCT and CERN Portuguese Trainee Programme Report | 31st March, 2017

Vacuum Control SCADA System – Developments Valve Monitoring panel Real-time and continued valve fatigue follow-up Archiving of valve behaviour main parameters User notification features (system warnings, errors) Vacuum devices Help panels Real-time device state description Emulation of any device state, and description LHC Sector Valves Penning Gauges Ion Pumps Pirani Gauges FCT and CERN Portuguese Trainee Programme Report | 31st March, 2017

Vacuum Control SCADA System – Developments Valve Monitoring panel Real-time and continued valve fatigue follow-up Archiving of valve behaviour main parameters User notification features (system warnings, errors) Vacuum devices Help panels Real-time device state description Emulation of any device state, and description Beam Line name tags Automatic and user-defined beam line identification on synoptic FCT and CERN Portuguese Trainee Programme Report | 31st March, 2017

Vacuum Control SCADA System – Developments Valve Monitoring panel Real-time and continued valve fatigue follow-up Archiving of valve behaviour main parameters User notification features (system warnings, errors) Vacuum devices Help panels Real-time device state description Emulation of any device state, and description Beam Line name tags Automatic and user-defined beam line identification on synoptic Vacuum Sector selectable by user (on work) Sector lines can be right-clicked Sector status can be set, affecting its synoptic representation Integration with assets management FCT and CERN Portuguese Trainee Programme Report | 31st March, 2017

Vacuum Equipment Labelling – Campaign Quality developments on assets management Vacuum equipment name standardization Integration with global asset management tools Applying to all the vacuum devices and monitoring hardware The complete VSC-ICM team involved >2000 labels printed and scanned FCT and CERN Portuguese Trainee Programme Report | 31st March, 2017

Vacuum Monitoring Application – Development Monitoring webpage SCADA synoptic for the main accelerators Beam status Vacuum devices status External operational panels Main user: Vacuum Monitoring Operator Displayed in the CERN Control Center (CCC) and around the Vacuum building http://vacmon.web.cern.ch Improvements: Interactivity with user New web development technologies Enhance maintenance Boost the development of new features Integration with SCADA system to provide more detailed information to the user Integration CERN groups databases FCT and CERN Portuguese Trainee Programme Report | 31st March, 2017

Training Competences Competences being acquired: Overall purpose: SCADA (WinCC-OA, PVSS) development General programming (Java, C++, QT, VBS) Web Development (Java Spring) Databases (SQL, architecture) Quality assurance and management Overall purpose: Vacuum Controls features extension Vacuum control system user-support FCT and CERN Portuguese Trainee Programme Report | 31st March, 2017

Questions? FCT and CERN Portuguese Trainee Programme Report | 31st March, 2017