Cabling for LHCb Upgrade

Slides:



Advertisements
Similar presentations
Walls crates cables gas chambers electronics CERN adb.
Advertisements

LHCb Upgrade Optical Fibers from Cavern to the Surface - what has been done ? - prototypes status and next coming steps - what is missing for final installation.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.
Preparation of SPD Cabling Calo comissioning meeting – 19th July 2006 – CERN I.Status of cables II.Cable reels III.Labelling IV.Cabling inside a VFE box.
L.Jirden1 Update on Power Supplies DCS WS L.Jirden u Wiener u Caen u Global Support Contracts.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Ken Wyllie, CERN Upgrade infrastructure, Feb LHCb Upgrade Electronics Infrastructure K. Wyllie & L. Roy.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
June 1 rst, Consolidation for E-cloud and High Voltage cards N.Vauthier TE-CRG LS1 projects review:
r1Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling YB+2 and YB+1, extension to minus wheels and YB0, cables between UXC55 and USC55.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
LEAF 03 March Optical Fibre Services for Experiments Luit Koert de Jonge/TS-EL-OF.
CERN EN-EL Cabling and Optical Fibre Section CERN EN-EL Cabling and Optical Fibre Section Mini Workshop, Simao Machado, EN/EL/CF.
Cable Layouts, Connectors for the LHC GAS SYSTEMS GAS COORDINATION MEETING, OCTOBER 2005 PH / DT1 GS.
K.WyllieElectronics meeting 29/05/061 RICH Power Supplies & Grounding Thanks to Johan Morant Paolo Baesso Xavier Le Gouard.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
Upgrade projects and APT update DT-LHCb coordination meeting 28 September 2015.
Expt. Area meeting – December V. Bobillier1 Cabling installation status.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
1 13 Octobre 2011 Laurent Roy ATCA Crate / Infrastructure in place -Rack in D3: dimension -Electrical power availability -Tell1 racks running in D3 (air.
V. Bobillier1 Cable installation status.
HiRadMat – Users Meeting 29/5/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,
M1 Central Part Cable Routing R3 FAR R2 CLOSE R2 FAR + GEM A3 B From chain GEM R2 CLOSE R2 FAR A1 20 A1 A1 A2 A CHAIN Access Front Dané.
Report on database work for INB in ALICE Latchezar Betev (ALICE) Information Session INB – June 8, 2006.
VAC – CTRL SYS internal meeting, 14 Dec A list of topics Start of the disassembly works: mid Jan. At first the W arm shall be off- service, then.
1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.
Cables Ian Crotty 8 May 2012 Cables for the RE4 Upscope in CMS News. The HV cables are in the Integration DB (INB/904) The Hv order is confirmed. Need.
LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team1 Experimental Area Latest News from IP8  Radiation Shield – Upper & Front Parts  Structures.
CALO News Pascal Perret LPC Clermont 22 January 2012.
1 LHCb needs to space for upgrade activities and maintenance of the existing detector: detector R&D, detector module production, detector assembly, storage.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
1. 2 PX ‘material’ shaft LHCb workshop Visitor area Control room SG8 Gas building Meeting room and offices Storage Access to UX.
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
IT-4135/EN Supply of Air Handling Units for Industrial HVAC Projects at CERN Technical Specification Paul Pepinster / EN-CV.
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
ELENA installation progress F. Butin / ELENA collaboration.
Status of the Remote HV Tile Upgrade session during the AUW Wednesday, 20 April 2016 François Vazeille on behalf of the Clermont-Ferrand team  Same set-up.
Detector Safety System overview DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware) 2 redundant PLC ~700 input.
S A Griffiths CM42 June 2015 Electrical & Control.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
Demineralised water cooling system
Chapter Objectives In this chapter, you will learn:
General aspects: Optical links :
RD51-WG X June test beam experience: useful information for October
Safety Issues (TF, June 15, 2005)
CMS Area Working Group Meeting
T1 Electronic status Conclusions Electronics Cards:
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Mini-drawers, FE-ASIC , Integrator
EMU Slice Test Run Plan a working document.
Renovation of the Accelerators Controls Infrastructure and its Assets Management Asset and Maintenance Management Workshop November 14th, 2013 Cl.Dehavay.
Electrical and electronic systems projects
TTC System Status May 2007 System overview Production Status
Pierluigi Paolucci - I.N.F.N. Naples
Pierluigi Paolucci - I.N.F.N. Naples
X-ray Pump-Probe Instrument
RPC HV&LV status Introduction HV power supply tender
LS1 status 24/03/2014.
VELO-meeting January 25, 2007 Sub-projects: SX & SX
19-April-05 Peripheral Crate Testing, Installation, and Commissioning PC I&C Feb ’06 EMU Fred Borcherding 16-May-19 PC I&C Feb'06.
East Hall under construction
ILO Industrial Opportunities Days, 6-7 June 2019
CSC Electronics Installation and Commissioning Oct ‘06
CSC Electronics Installation and Commissioning CSCE I&C
Needed for Team A on -End
Presentation transcript:

Cabling for LHCb Upgrade Cables and Racks : who is responsible for what ? Documents needed before installation A software tool in development Safety aspects and purchasing delays Planning Laurent Roy 09 June 2016

Long distance Cables Rb84 Routing example for copper (Detectors-Barracks) Access to Cable trays in the ‘chicane’ ~33% wall to dismantle ?

Racks Space for equipment (LV, HV,…) Space for Patch Panel Cooling with air? with water ? Smoke detection? Extinguisher system? Rack attribution to do for Upgrade (in UX85, in D3 barrack) Patch Panel rack example

Who is responsible for what ? Example: (actual installation for IT) B C C G E D D F E A+B: cabling ‘on’ the detectors + cables from detector to ‘Infrastructure’ Patch Panel, cable chains included Sub-detector (define, order, install) Rk: for optical patch cords a grouped order could be proposed if sub-detectors define their requirements precisely C: Rack preparation (rails, air/water cooling…)  Sub-detector (define) , help of Infrastructure (install) D: Patch Panels E: Connectors F: Long distance cables if ‘common’ (ex: Maraton or Optical fibres)  Infrastructure (order with sub-detector budget for copper cable, install)  if ‘special’ : Sub-detector (define, order), Infrastructure (install) G: Equipment installation, short cables, connections  Sub-detector

Documentations Upgrade Infrastructure requirements (Heinrich) reviewing on going for ‘cable part’ (Ken and me), doc will be released in next TB Have an overview of cabling and racks needed Allows to estimate cable trays space and routing (1/3 dismounting wall enough?,…) Full Optical links doc Start to complete an edms doc, one per sub-detector  Allows the procurement, installation, commissioning, then LHCb upgrade operation ‘Long distance’ Copper cable + connectors + racks doc Mini meeting / sub detector will start after summer One contact person to be assigned per subdetector (to give all information needed, the budget code for the ‘grouped’ orders, …)

Data Base, Software interface, Labelling, RP traceability Actual CABLE Data Base kept but updated New Web Interface for Cable management (Lucas Vieira, Gloria, Rainer, Joel, Laurent) to declare the cable in place to keep to declare the new cables you want to install to have a DB updated with cable status: ‘to be removed’ or ‘to installed’ before LS2 useful interface for installation, labelling and other cables management compatible with RP Traceability requirement Rk: Mandatory for long distance cables  Will be also available for internal subdetector cables management Web Interface ready after summer CABLE Data Base new structure

Safety aspect Delay for procurement … Cable should be compliant with Cern safety regulations (IS-23) A lot of criteria  https://edms.cern.ch/ui/file/335745/LAST_RELEASED/E_IS23.pdf All certificates must provided by the manufacturer If not: pay an accredited lab to do the tests on a cable sample following the standards requested. Rk: Choose cables/connectors available through CERN stores Most of them are IS23 compliants … Delay for procurement Delivery of Cable (from Cern store but also from external companies) can be very long !! Order well in advance to be ready in time for installation. Same for power supplies Ex: few Wiener Maraton ordered 19 Oct 2015 received 27 April 2016 = 6 months Caen Power supplies ordered 11 Dec 2015 received 25 May 2016 = ~ 5-6 months

Planning Detailed Documentations

CONCLUSION *It is time to go in detail for the cabling Full documentation deadline: before end of this year Thanks in advance for your contribution ! *New Cable management interface is coming *Do not neglect Safety aspects and Delivery durations in your plan Good cabling Not enough prepared !