Neutrino Platform Proximity Cryogenics 72th EHN1 Cryogenics Integration TE-CRG

Slides:



Advertisements
Similar presentations
Xenon Detector Status Liquid Xenon Group. 1 Outline Cryostat construction –Honeycomb panel test at Pisa –Assembly –Cryogenic test at SIMIC –Leak test.
Advertisements

CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
MONALISA installation at the ATF2 ATF2 weekly meeting.
RD51 Common Test Beam: Status RD51 collaboration week Kolymbari, June 2009 Yorgos Tsipolitis NTUA.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
FP 420 Connection Cryostat Design and Integration Keith Potter, Jaak Lippmaa, Guido Ryckwaert, Benoit Florin, Thierry Renaglia, Thierry Colombet, Shrikant.
128 May 2013 CENF Near Far Integration For the Safety Folder + Environmental impact Study Simple process: Identify Safety issues >> description >> risk.
Notes After TIG 17/7/08 HF+ Move out of garage: Aug 15* Platform+table+collars+racks+BP support (jack up for platform) = 3 days Controls for motors = 1.
EHN1 Extension overhead crane coverage Keith Kershaw CERN EN-HE.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
LHC Insertions Upgrade Working Group (LIUWG) Space available in tunnel Y. Muttoni.
UPDATE ON THE CRYOSTAT DESIGN AND INSTALLATION SEQUENCE.
Installation issues - update, July 2006A.Fabich1 MERIT installation: Update July 2006 A.Fabich CERN AB-ATB July 2006.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
SBS Magnet and Infrastructure Status Robin Wines July 2015.
Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008.
CENF – Civil Engineering Extension B887 Status – 18 September 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
Xenon Detector Installation schedule Satoshi MIHARA.
09/07/07Shutdown’07 Week 5 F.G. Garcia1 MTA beam line installation Weekly Report September 07, 2007 Period covered: August 31 st to September 7 th (Week.
Cryogenics Fabrication Plans & Constraints David Montanari (on behalf of the CERN Neutrino Cryogenic Group) ProtoDUNEs Meeting Feb 23, 2016.
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
TE-CRG Activities D. Delikaris, TE-CRG.
EHN1 – EN/EL Progress update J. Devine 25/02/16. Integration – Jura Substation Position updated to avoid clash with door. Meeting next week for Civil.
LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team1 Experimental Area Latest News from IP8  Radiation Shield – Upper & Front Parts  Structures.
MICE Prototype Coupling Coil Cooling Circuit Design Dan Cheng Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
GIF in EHN1 - Vision 112/02/2014A. Fabich, EN-MEF-LE.
… getting there … 112/02/2014A. Fabich, EN-MEF-LE.
GIF++ implementation Adrian Fabich, Sylvain Girod, EN-MEF-LE Technical meeting with Supplier of Irradiator, 3 rd October 2013.
P. 1Mario Deile – TOTEMino: Status and Schedule Mario Deile Zone 2.Gas system 3.Cooling water 4.Cables 5.Safety 6.Schedule, Project Plan 7.Schedule.
ELENA installation progress F. Butin / ELENA collaboration.
ProtoDUNEs Interface documents (NP-02, NP-04) David Montanari (on behalf of Redouan A, Mark A, Johan B, Michel C, Joaquim C, Aurelien D, Kevin H) Apr 14,
Neutrino Platform Proximity Cryogenics 59th EHN1 Cryogenics Integration Redouan Abdennour, Johan Bremer, Michel Chalifour, Joaquim Creus, Aurelien Diaz,
3x1x1 m 3 Anode deck Suspension system WA105 meeting - 21 st of January, 2015 B. Aimard, G. Balik, L. Brunetti, G. Deleglise, D. Duchesneau, N. Geffroy.
ProtoDUNE Single Phase (NP-04) P&ID David Montanari (on behalf of Mark A, Johan B, Michel C, Joaquim C, Kevin H) CERN Neutrino Platform General Meeting.
European cryogenic days Membrane cryostats for large volume neutrino detectors June 9 th, GENEVA.
Neutrino Platform Proximity Cryogenics 68th EHN1 Cryogenics Integration TE-CRG
Teleconf ACS – FREIA 28th March 2017
Status of the PANDA Solenoid Magnet Production in BINP
EHN1 Cryogenics Integration
Neutrino Platform Proximity Cryogenics 62th EHN1 Cryogenics Integration Redouan Abdennour, Johan Bremer, Michel Chalifour, Joaquim Creus, Aurelien Diaz,
Safety in the Neutrino Platform Hall
LBNF CAD models, Drawings and Component list
IT-4189 Supply and installation of a cryogenic distribution system
EHN1 Extension planning
EHN1 Extension North Side wall (Removal of Existing services & platforms) Michael Jeckel & Bastien Rae.
VELO-installation meeting CERN, January 17, 2006
BA6 – crab cavity activities in EYETS
Totem Gas Systems ( T1 , T2 ) S. Haider PH / DT1.
INSTALLATION SEQUENCE
CE Status: Activities executed until 03/08 and ongoing
EHN1: CE Integration process updating
n_TOF “Draft” plans for YETS and LS2
News from Projects Lau Gatignon / EN-EA Input from F.Butin, Q.Bouirek
Warm structure requirements :
Teleconference ACS – FREIA 31st October 2017
EHN1 Neutrino Installation Plans
Extension SR1 WP3 Electrical installations
Status of the cryogenic system for B180
Preparations for test of
Installation plans from mid 2005
Site Based Preconstruction – Enabling Work
Status of the PANDA Solenoid Magnet Production in BINP
UPPSALA UNIVERSITY_GERSEMI PROJECT
Polarized 3He target installation
Cryogenic upgrade of B163, B165 & B253 Status Meeting 19th December 2018
DS20k Integration Workshop
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

Neutrino Platform Proximity Cryogenics 72th EHN1 Cryogenics Integration TE-CRG 12/07/2017 J.Creus Prats - CERN

Week 29 update for Sarvadon contract 17079: Metallic structures Week 29 update for Sarvadon contract 17079: Drawings received for 4/4 platforms Installed platforms: NP 02 40 F1 ST NP 04 40 F1 ST Installation schedule NP 04 40 AP ST 17/07/2017 NP 02 40 CA ST 24/07/2017 12/07/2017 J.Creus Prats - CERN

As built pictures NP 02 40 F1 ST Metallic structures As built pictures NP 02 40 F1 ST 12/07/2017 J.Creus Prats - CERN

Details of securing of NP 02 40 F1 ST area Metallic structures Details of securing of NP 02 40 F1 ST area Action 1: Add ramp to platform/concrete – Sarvadon – Not executed Action 2: Removal of barrier – EN-ACE – Execution today Action 3: Barrier gaps proection- EN-ACE – Protected 3/3 1 3 2 12/07/2017 J.Creus Prats - CERN

As built pictures NP 04 40 F1 ST Metallic structures As built pictures NP 04 40 F1 ST 12/07/2017 J.Creus Prats - CERN

Racks support ordered, by EN-EA, d. wk36 Metallic Structures Racks support ordered, by EN-EA, d. wk36 Two external fenced huts, by EN-ACE, d. wk 38 20 inox supports for field boxes, Slovakia supplier , d. wk 36 1 2 A. Diaz 12/07/2017 J.Creus Prats - CERN

Crane Cabin Exclusion Zone – height to ground >7.1m Metallic Structures Crane Cabin Exclusion Zone – height to ground >7.1m Zone 1: covering all the elements that interfere with the crane cabin from july 21st. The distance of the platform piping supports to the ground floor is 7.9m. Zone 2 : covering all the elements that interfere with the crane cabin from july 28th. The distance of the platform piping supports to the ground floor is 7.8m. 12/07/2017 J.Creus Prats - CERN

Ongoing: Cabling of cryogenics control barrack HNA 803 Control Hardware Ongoing: Cabling of cryogenics control barrack HNA 803 Cable trays EN-EL: Installation start with NP 02 week 31 Installation finished before week 39 Installation racks / field box TE-CRG from week 37 to 40 Cabling between racks and field boxes week 42 ( CC3) V.Clerc, S.Girod 12/07/2017 J.Creus Prats - CERN

Location of point, next to NP04 racks Control Hardware Need of Permanent protection of trench for cable trays and racks installation. Stairs end in front. Location of point, next to NP04 racks A protection should be in place by September 2017 STAIRS 12/07/2017 J.Creus Prats - CERN

not welded in the cryostat Warm piping top cap NP-02 Requirement of side purge ports in the cryostat penetration flange collars: detector requires 13 ports and internal cryogenics requires 14 ports. Installation of purge lines later after January 2018 A. Gendotti, B. Aimard, S. Murphy Side purge pipes not welded in the cryostat 12/07/2017 J.Creus Prats - CERN

not welded in the cryostat Warm piping top cap NP-04 Requirement of side purge ports in the cryostat penetration flange collars: detector requires 22 ports and internal cryogenics requires 14 ports. Installation of purge lines later after October 2017 R.Acciarri + DUNE Side purge pipes not welded in the cryostat 12/07/2017 J.Creus Prats - CERN

Cryostat safety relief collector NP-02 Warm piping cryostats Cryostat safety relief collector NP-02 Installation before beam stairs are in place. Dates? R. Abdennour, J. Creus 12/07/2017 J.Creus Prats - CERN

12/07/2017 J.Creus Prats - CERN