ESR Slow highly charged ions and antiprotons

Slides:



Advertisements
Similar presentations
FAIR – Status Report Walter F. Henning NuPECC Meeting -- March Venice.
Advertisements

Mitglied der Helmholtz-Gemeinschaft Beam Cooling at HESR in the FAIR Project 12 th September 2011 Dieter Prasuhn.
The FAIR Antiproton Target B. Franzke, V. Gostishchev, K. Knie, U. Kopf, P. Sievers, M. Steck Production Target Magnetic Horn (Collector Lens) CR and RESR.
O. Kester for the HITRAP collaboration, HIAT2009, June 8-12, Venice, Italy Status of Construction and Commissioning of the GSI HITRAP Decelerator Outline:
J. Marton, ÖPG-FAKT, Weyer, September 27, FAIR at GSI and the Future of Hadron Physics J. Marton Institute for Medium Energy Physics Austrian Academy.
Lasers and Highly-Charged Heavy Ions at Günther RosnerHZDR Workshop, Rossendorf, 6/9/111.
1 Antiprotons at FAIR FLAIR SIS 100 / 300 pbar production Capture and accumulation deceleration High Energy Storage Ring for Antitprotons (HESR): 0.8–15.
M. Vogel SPECTRAP status. Manuel VogelGSI X SPECTRAP.
Zoran Andjelkovic Johannes Gutenberg – Mainz University GSI Darmstadt Laser Spectroscopy of Highly Charged Ions and Exotic Radioactive Nuclei (Helmholtz.
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
Progress Report Günther RosnerNuPECC, Copenhagen, 15/6/121.
Future Penning Trap Experiments at GSI / FAIR – The HITRAP and MATS Projects K. Blaum 1,2 and F. Herfurth 1 for the HITRAP and MATS Collaboration 1 GSI.
FAIR – Status Report Walter F. Henning.
Status of the Transfer of CRYRING to FAIR MSL, 2 February 2009 Håkan Danared.
FAIR Facility for Antiproton and Ion Research Guenther RosnerNuPECC, Prague,
Zoran Andjelkovic Johannes Gutenberg Universität Mainz GSI Darmstadt Laser Spectroscopy of Highly Charged Ions and Exotic Radioactive Nuclei (Helmholtz.
1 Plans for JINR participation at FAIR JINR Contributions: ● Accelerator Complex ● Condensed Baryonic Matter ● Antiproton Physics ● Spin Physics Physics.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
FLAR project S.L. Yakovenko JINR, Dubna,Russia. 2 Contents 1.FlAIR project 2.AD facility at CERN 3.Antyhydrogen and Positronium in-flight at FLAIR 4.LEPTA.
Jürgen Florenkowski GSI, Darmstadt Agenda Annual Report Meeting EU construction ( CNI ) contract "DIRAC-PHASE-1" for the FAIR project September 26, 2006.
The FAIR* Project *Facility for Antiproton and Ion Research Outline:  FAIR layout  Research programs Peter Senger, GSI USTC Hefei Nov. 21, 2006 and CCNU.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15,
Accelerator Issues Fermilab Antiproton Experiment Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Construction.
FLAIR meeting, GSI March Positron Ring for Antihydrogen Production A.Sidorin for LEPTA collaboration JINR, Dubna.
M. Steck, RUPAC 2006, Novosibirsk Cooling of Rare Isotope Beams in the ESR Cooling by: Stochastic cooling (pre-cooling) Electron cooling (final cooling)
Design and construction of Nuclotron-based Ion Collider fAcility (NICA) and Mixed Phase Detector (MPD) Design and construction of Nuclotron-based Ion Collider.
Lab. Director’s Meeting IHEP, Protvino, Russia, January 2008 D. Reistad, The Svedberg Laboratory, Uppsala University.
4 Construction Site today Construction Site – current Google Maps View 1Short Status of FAIR for NuPECC /KP.
1 NICA Project Report of The Group I S.L.Bogomolov, A.V.Butenko, A.V.Efremov, E.D.Donets, I.N.Meshkov, V.A.Mikhailov, A.O.Sidorin, A.V.Smirnov, Round Table.
The HITRAP Project at GSI For the HITRAP collaboration: Frank Herfurth GSI Darmstadt.
13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 1 How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD.
CR: status and activities at BINP I.Koop, BINP, Novosibirsk O.Dolinskyy, GSI,Darmstadt , MAC, GSI, Darmstadt.
Inti Lehmann Facility for Antiproton and Ion Research Darmstadt, Germany 2nd PhD Science GSI 2014 – 11 August 2014 FAIR – Facility for Antiproton.
Oleksiy Dolinskyy 23 rd October, FAIR layout of accelerators Collector Ring.
GSI Helmholtzzentrum für Schwerionenforschung GmbH GSI visitation W. Barth W. Barth, WAO 2014, Mainz/Germany.
Preparation Phase of the FAIR Project
Status of the FAIR Project
Precision Tests of Fundamental Interactions with Ion Trap Experiments
Oleksiy Dolinskyy 1st December, 2014
English for young physicists WS 09/10 Niklas Müller
High energy beam transport.
FAIR Machine Cycles David Ondreka
Oleksiy Dolinskyy December 1st, 2014
Status of the FAIR Project
Perspectives for Heavy-Ion Collisions at Future Facilities
Status of HESR 18th March Gießen Dieter Prasuhn.
Access to material testing facilities (WP10)
ELENA installation and commissioning status
Emergency dumping of proton and ion beams in SIS100 F
Experiments with heavy, highly charged Ions HITRAP Project Status
Z. Andelkovic, W. Geithner, F. Herfurth, M. Lestinsky, G. Vorobyev
FAIR ACCELERATORS Peter Spiller EMMI workshop
In-Kind FAIR David Urner FAIR, Darmstadt , D. Urner.
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
“Electron cooling device in the project NESR (FAIR)"
INTRODUCTION AND OVERVIEW. Operators training.
DTS Fields of Interest POF IV
How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD
Ladies and Gentlemen, Let me give you a short outlook to the operating of the new facility at this point. My colleague has just shown you, how we operate.
Timing System GSI R. Bär / U. Krause 15. Feb. 2008
Project "Nuclotron M" / NICA
Petra Schütt Operateurs-Schulung
FAIR – the Universe in the labororatory
HESR for SPARC 25th November FAIR MAC Dieter Prasuhn.
Status of the CCC for CRYRING / FAIR
Pulsed electron beam cooling experiments: data & preliminary results
HE-JLEIC: Do We Have a Baseline?
JLEIC Ion Beam Formation options for 200 GeV
and collaboration with France
Presentation transcript:

CRYRING @ ESR Slow highly charged ions and antiprotons Motivation Technical Overview Status of installation Frank Herfurth for the HITRAP and CRYRING working groups

F. Herfurth "CRYRING @ ESR" WHY? HCI Highly Charged Ions Elements Isotopes + Matter Charge radii FS, HFS g-factor e--binding + surface BW effect a, me Lamb-shift Structures QED test + atoms Hollow atoms Charge exchange Collision dynamics F. Herfurth "CRYRING @ ESR"

F. Herfurth "CRYRING@ESR" FAIR F. Herfurth "CRYRING@ESR"

F. Herfurth "CRYRING@ESR" FAIR – SPARC and FLAIR Atomic physics Antiproton physics (low energy) FLAIR SPARC F. Herfurth "CRYRING@ESR"

SPARC and FLAIR Facility for Low Energy Antiproton and Ion Research Stored Particles Atomic Physics Research Collaboration Swedish in-kind contribution CRYRING F. Herfurth "CRYRING@ESR"

The “Green Paper” – Stepwise to FAIR Module 0 SIS100 SIS 100 Module 1 Exp. Areas CBM/ HADES, APPA Module 2 Super-FRS ESR But: ESR continues! Module 3 Antiprotons for PANDA (CR, HESR) HESR Upgrade CR F. Herfurth "CRYRING @ ESR"

F. Herfurth "CRYRING @ ESR" GSI SIS 400 MeV/u CRYRING @ ESR FRS 11 MeV/u ESR UNILAC 4 MeV/u F. Herfurth "CRYRING @ ESR"

CRYRING in Stockholm (MSL) Successful operated from 1992 to 2010 Dismantled and shipped to FAIR/GSI in 2012/13 F. Herfurth "CRYRING @ ESR"

F. Herfurth "CRYRING @ ESR" Max. rigidity 1.44 Tm 15 MeV/u U92+ 96 MeV/u protons Min. rigidity ~ 0.054 Tm 150 keV/u protons Experiment Equipment Particle detectors Gas jet, MOTReMi, EXL ... Extraction Injection Particle detectors 0° port Microcalorimeter 180° port Microcalorimeter Electron cooler F. Herfurth "CRYRING @ ESR"

F. Herfurth "CRYRING @ ESR" Vacuum & Beam Life Time Ion pumps ~ 10 Cryopumps NEG pumps ~ 100 0.3 15 3 s 15 min V. Shevelko, priv. comm. F. Herfurth "CRYRING @ ESR"

Electron Cooling ESR - CRYRING C. Brandau priv. comm. F. Herfurth "CRYRING @ ESR"

F. Herfurth "CRYRING @ ESR" (p,g) Reaction Rates Nucleosynthesis of proton-rich nuclei beyond iron Only few experimental data for relevant energy range (Gamow window) in p-process 12 F. Herfurth "CRYRING @ ESR"

Experimental Equipment Schottky beam diagnostics Electron cooler / electron-ion merged beam experiments Atomic targets (gas target, MOTReMi) Transverse electron targets Particle, X-Ray photon, recoil ion detectors Cryogenic current comparator Beam line for slow extraction F. Herfurth "CRYRING @ ESR"

F. Herfurth "CRYRING @ ESR" Max. rigidity 1.44 Tm 15 MeV/u U92+ 96 MeV/u protons Min. rigidity ~ 0.054 Tm 150 keV/u protons FAIR Research & Development Detectors and diagnostic systems FAIR type control system Training of operators on FAIR type system FAIR type safety and radiation monitoring/access system All this with real beam! Scientific Opportunities Heavy, highly-charged ions as available at GSI (up to U92+) at low energy ~ 100 keV/u .. 10 MeV/u – bridge the energy gap between the ESR (> 4 MeV/u) and HITRAP (<10 keV/u) F. Herfurth "CRYRING @ ESR"

F. Herfurth "CRYRING @ ESR" ESR – From 400 to 4 MeV/u ESR – Experimental Storage Ring at GSI with stochastic and electron cooling Ni28+ 400  30  4 MeV/u ESR cycle during recent experiment signal: time (s) RF amplitude 5..20 injection, stoch. cooling 3..10 deceleration 400 – 30 MeV/u 2..6 e- cooling, rebunching 2..5 deceleration 30 – 4 MeV/u magn.dipole field 2..5 e- cooling, ejection 2  107 3 reset magnets ion current 40 s 1100 A  180 A  25 A F. Herfurth "CRYRING @ ESR"

Modification of ESR for CRYRING Additional Kicker but in the mean time … S. Litvinov

Extraction towards CRYRING Beam extracted using the injection kicker Transported beyond the first three dipoles in transfer line N7+ @ 4 MeV/u (only ca. 0.6 Tm !) S. Litvinov, C. Kleffner, M. Steck, F. Nolden, D. Winters

Modification of ESR for CRYRING Additional Kicker in the mean time … creative use of existing kicker Beam line upgrade (ESR – Cave B) added steering, dipoles; additional diagnostics Synchronization ESR/CRYRING Kickers/RF got easier by increasing the diameter of CRYRING to ESR/2 Towards a reduced cycle time Requires faster cooling and more flexible control system

CRYRING modifications toward FAIR/GSI Injection ≤ 30 MeV/u ≤ 30 MeV/n CRYRING is now being modified to be suitable for its new role as LSR. A high-energy injection and extraction will be added. Injection kicker magnet Extraction kicker magnet Electrostatic extraction septum Magnetic extraction septum Extraction

F. Herfurth "CRYRING @ ESR" New Injection Septum Delivered to GSI Tested up to 1800 Ampere Stray field measured F. Herfurth "CRYRING @ ESR"

Component Preparation/Repair Magnets Add supports Transfer measurements to prepare alignment Check cooling water flow Electron Cooler Repair transport damage Check collector Prepare cryogenic test Others Magnetic field measurements Adapt to safety rules Check heating jackets Test diagnostics (IPM, Trafos) … F. Herfurth "CRYRING @ ESR"

CRYRING @ ESR in “Cave B” New, 1.44 Tm Beam Line Modify Cave B F. Herfurth "CRYRING @ ESR"

F. Herfurth "CRYRING @ ESR" Cave Reconstruction FOPI Magnet moved out and detector uninstalled Major concrete and infrastructural changes implemented F. Herfurth "CRYRING @ ESR"

F. Herfurth "CRYRING @ ESR" Installation started! F. Herfurth "CRYRING @ ESR"

F. Herfurth "CRYRING @ ESR" Timeline Installation started Continue Installation Finish cave infrastructure, Install Power Converters Control system and Diagnostics on track Beam line ESR – CRYRING prepared F. Herfurth "CRYRING @ ESR"

Slow, Heavy, Highly Charged Ions @ GSI/FAIR SIS Stripper 400 MeV/u UNILAC FRS ESR 4 MeV/u HITRAP 4 K 10 MeV/u CRYRING 4 MeV/u … 100 keV/u Slow, heavy, highly charged Ions … mostly stored but always well controlled Energy range between 10 MeV/nucleon to sub eV/Ion 105 to 107 heavy, highly charged ions like U91+ Low energy antiprotons in the future S-EBIT F. Herfurth "CRYRING @ ESR"

Slow Antiprotons @ GSI/FAIR 29 GeV/u ? GeV/u p-Linac ? SIS100 Pbar Target ESR Slow, heavy, highly charged Ions … mostly stored but always well controlled Energy range between 10 MeV/nucleon to sub eV/Ion 105 to 107 heavy, highly charged ions like U91+ Low energy antiprotons in the future 4 K 4 MeV/u HITRAP S-EBIT 4 MeV/u … 100 keV/u 10 MeV/u CRYRING Beam lines connecting HESR, CR, ESR under discussion F. Herfurth "CRYRING @ ESR"