HMA Follow On Activities

Slides:



Advertisements
Similar presentations
AR – Issues for Attention Tactical and Strategic Guidance documents – what is the agreed approval/ publication process? –Strategic Guidance will.
Advertisements

MOSS 2007 Document Management Adam McCarthy 1 st April 2009.
® © 2009 Open Geospatial Consortium, Inc. Starting an Interoperability Experiment David Arctur, OGC Director, Interoperability Programs December 8, 2009.
Toward a Multi-State Consensus on Rural Intersection Decision Support: Objectives u Gain understanding of issues involved with national rural intersection.
OGC Update WGISS-19 - March 2005 Allan Doyle, GSDI/EOGEO
HMA January 2011 – Slide 1 Daniele Marchionni TELESPAZIO HMA Follow On Task 4 - Order AR January 2011.
HMA Sep 2009 – Slide 1 Daniele Marchionni Elsag Datamat HMA Follow On – Task 4 - Workplan.
HMA 5-6 July 2010 – Slide 1 Daniele Marchionni Elsag Datamat Stefania Pappagallo Elsag Datamat HMA Follow On Task 4 - Order MTR 5-6 July 2010.
05 October 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
Teleconference, 22 October 2008 SPS Mandatory I/F Development Slide 1 HMA SPS Mandatory I/F Development HMA-T Phase 2 Progress Meeting 26 Nov 2008, by.
3 November 2009 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
Page 1 Arnaud Cauchy, EADS Astrium 6th of November 2013 ESA HMA AWG HMA-S WP6100 WPS2.0 Specification Session 4: State of the art technology and standards,
1 HMA Follow-on – Negotiation Meeting - Task 4 ESRIN – 24/06/2009 Issue: 1.0.
28 May 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
HMA-FO ODA, January 2011 HMA Follow-On Task 3 Online Data Access in the frame of ESA's Heterogeneous Missions Accessibility (HMA) initiative Acceptance.
Hoeilaart, 19 February 2009 Slide 1 CITE tests for and HMA-T Phase 2 Progress Meeting 19 February 2009, Hoeilaart Nicolas Lesage, IGN.
HMA-T Progress Meeting 26 November 2008 Slide 1 IMAA-CNR activity report HMA-T Progress Meeting 26 November 2008 S. Nativi, E. Boldrini, F. Papeschi IMAA-CNR.
5 July 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) MTR 5 July.
HMA AWG, 6 November 2013 Slide 1 HMA for Science - Status HMA AWG Meeting 6 November 2013, ESRIN Frascati Yves Coene, Spacebel s.a. Claudio Gizzi, Astrium.
Spacebel - Hoeilaart, February 2009 SPS Mandatory I/F Development Slide 1 HMA SPS Mandatory I/F Development HMA-T Phase 2 Acceptance Review 1 18.
HMA Slide 1 Heterogeneous Missions Accessibility Follow On Pier Giorgio Marchetti - European Space Agency
19 Feb 2009, Spacebel (Hoeilaart) OGC and activities HMA-T Phase 2 AR Meeting 19 Feb 2009, Spacebel (Hoeilaart) Frédéric Houbie, ERDAS.
19 January 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
Architecture DWG Closing Plenary Report
Frascati, 2-3 July 2008 SPS Mandatory I/F Development Slide 1 HMA SPS Mandatory I/F Development HMA-T Phase 2 KO Meeting 2-3 July 2008, Frascati Ricardo.
HMA Follow-On Task 3 Online Data Access in the frame of ESA's Heterogeneous Missions Accessibility (HMA) initiative Mid Term – AWG Summary
HMA Follow On Task 4 - Order Final Presentation June 2011
HMA AWG Configuration Management Status 1 December 2008
HMA Follow On Activities
Heterogeneous Missions Accessibility HMA Architecture Working Group
(on behalf of the POOL team)
CEOS OpenSearch Project II
HMA Follow On Activities
HMA Identity Management Status
HMA-S Final Presentation OGC DSEO Protocol
Software Engineering Architectural Design Chapter 6 Dr.Doaa Sami
HMA Follow On Activities
HMA Follow On Task 4 - Order Final Presentation June 2011
HMA SPS Mandatory I/F Development
HMA Follow On Task 4 - Order Preliminary Review 2-3 February 2010
Validation & conformity testing
HMA Follow On Activities
SKADS Controller’s Meeting Timeline Annual Financial Report
MTS#59 - Input from CTI Silvia Almagia May 2013
HMA Follow On Activities
Joe Clarke (presenting)
Overview of Progress HMA Standardisation Work
HMA Follow On Activities
CEOS OpenSearch Project II
N. Fanjeau, Airbus Defence & Space June 11, 2014
EO Data Access Protocol
HMA Follow On Activities
DREAM Project CSA-ESA Bilateral Meeting 16 February, Frascati
CITE tests for and HMA-T Phase 2 Progress Meeting
Lesson 1 Understanding Software Quality Assurance
HMA Follow On Task 4 - Order Final Presentation 21 June 2011
CEOS OpenSearch Conformance Test Document
HMA Follow-on Kickoff Meeting
OGC and activities HMA-T Phase 2 KO Meeting
Status OpenSearch Standardisation Activities - HMA-S Project
HMA Follow On Task 4 - Order Final Presentation 21 June 2011
DSC Governance Sub Group Recommendations
Pier Giorgio Marchetti - European Space Agency
CEOS OpenSearch Project
SWE 2.0 – Current Status of Standards
HMA for Science Task 1 – Project Management
Reportnet 3.0 Database Feasibility Study – Approach
DAIL RIDS are posted to SSE wiki
QoS Metadata Status 106th OGC Technical Committee Orléans, France
EO profile for WMS progress report
Presentation transcript:

HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly Progress Meeting 27 April 2010 Reuben Wright, Deimos Space

Schedule Deliverables Actions Work in Progress SPS 2.0 SPS Extension for EO SFRE Requirements SFRE Documentation SFRE Development

Schedule 1/2

Schedule 2/2

Proposal Information: List of Documentation Deliverables

Proposal Information: List of Software Deliverables

Open actions from PR 02/02/10, and teleconference on 23/03/2010 Where possible updates to match the OGC specification model will be attempted before March TC. In particular to ensure we have appropriate Abstract Test Suites and some high level view. List of reqs from HMA Scenario document to be considered for the high level requirements summary. Cross-specification discussion with OWS Common group about if/how the Notifications information could be moved to OWS Common once it has been used in SPS. AR to raise as OWS change req. EO specific use cases and scenarios (including notification) should be included in one of the Task 2 deliverables. Old use cases and interaction diagrams from HMA-I Scenario TN can be redrawn. Spotimage/Deimos should review the old HMA-I Scenario TN, extract the old scenarios and use cases, validate them with the new evolution (e.g. reserve, confirm) since and update these scenarios and use cases. Should be included in one of the Task 2 deliverables. AR to review draft. At end of May send across to Daniele M (Task 4) for review (along with EO extn for SPS). Action to organise a joint teleconf (programming/ordering) with MDA to better understand the tasking scenario where delivery options should be passed at tasking time without a separate ordering service. AR will document in sps extn Add possibility of submitting individual pseudo scenes for tasking in EO SPS 2.0. Merge with Submit by feasibility ID capability. optional Operation to be added Send draft SPS EO document by April, 15th for last tasking parameter review during the HMA Architecture Board Delayed to mid May. Deimos to ask ESA to chase OAB for their comments by May 10 Plan for releasing SPS EO RFC after June TC Go for vote of SWE Common Data Model, SWE Service Model and SPS 2.0 in June. Use clean URNs for SPS EO tasking parameters with authority = OGC and sub namespace = eop/opt/sar

Status: released as an RFC Work in Progress: SPS 2.0 Status: released as an RFC Comments have been received and are being discussed by the Working Group Plan to have final decisions on the received comments at next TC meeting (14-18 June)

Work in Progress: SPS Extension for EO Status Drafted throughout Updates to use EO GML (v 3.2.1) Requests are unchanged Will update Library to handle the differences for responses, no large changes at Java level Extension has added a slot for returning the list of segments Specification Model and ATS updates Document to be added to OGC Pending area before last week of May Ready for discussion/RFC at next OGC TC (14-18 June)

Work in Progress: SPS Extension for EO EO GML 3.2.1 Dependency on EO GML 3.2.1 has been introduced Seems to be a stable standard, but not published yet Check: Schemas to use are the “Reverse engineered” from re-created model? Handled by Task 1 and 3 ? Reviews of EO Parameters Action 67 is about completing last tasking parameter review by the HMA Architecture Board Could ESA chase the members for their comments by May 10? Deimos will manage review feedback from Astrium also

Work in Progress: SPS Extension for EO EO specific use cases and scenarios in Task 2 deliverables Action 36: “EO specific use cases and scenarios (including notification) should be included in one of the Task 2 deliverables. Old use cases and interaction diagrams from HMA-I Scenario TN can be redrawn. Spotimage/Deimos should review the old HMA-I Scenario TN, extract the old scenarios and use cases, validate them with the new evolution (e.g. reserve, confirm) since and update these scenarios and use cases.” Deimos and Spot working on updating the TN with use cases EO Extn for SPS will include details on what is included in Describe Tasking to support scenarios: access via direct URL (as MDA requested) Use of Ordering system, with way of passing information across tied to Task IDs Will send both TN and EO SPS over to Daniele (Task 4) end of May

Work in Progress: SFRE Requirements Requirements Baseline Documents Version 1.1 Software System Specification (SSS) and Software Requirements Specification (SRS) have been completed Closed all RIDs from PR Submitted on 8 April for approval (and PR closeout) Uploaded to HMA Wiki 23 April Requirements Traceability Being used in Design documentation and Test Planning

Work in Progress: SFRE Documentation Software Design Document (SDD) Drafting an integrated document for both SF Client and SF Server ECSS 40C will be followed Acceptance Test Plan (ATP) Proposal to use Deimos standard template for Acceptance Testing, as used in HMA-T (and many other ESA projects) ECSS 40C does not give detailed guidance (beyond mention in Table A1) ECSS-Q-ST-80C (Software product assurance) doesn't give these details either Not anticipating a Software verification plan (SVerP) or Software validation plan (SValP) for this project. NB there is a certain amount of interface test information in the Abstract Test Suites

Work in Progress: SFRE Development Development progress SF Client work started - progress being made on supporting the v2.0 operations SF Server work continues – generates a valid response for all operations except DescribeSensor. Working on planning simulation Development process Multiple release strategy has been adopted Targetting a internal release 2 (the first release with any UI) for 28/05. These versions of Client and Server will be tested for interoperability Open Source SPS Library updates from Deimos. Reviewed at Spot