Ork Watch Tower – First Floor Measurements may vary on your printer

Slides:



Advertisements
Similar presentations
How To Make Curtains & Drapes
Advertisements

GATHER THE FOLLOWING SUPPLIES:
Sewing Basics Earning your Sewing License. Why Learn How to Sew? Why should we learn how to hand sew? What are some useful applications from hand sewing?
CONSTRUCTION BLUEPRINT READING
Take out your Pajama Pants Packages and open them up…be careful not to lose any pieces! Write your initials and period # on your pattern pieces! Keep.
Spiral Stairs Assembly Instruction By Laser Dollhouse Designs
The Little Nikki Assembly Instruction By Laser Dollhouse Designs.
Bezel Ring.
How to Make a Hot Air Balloon
Lone Star Region National Model Railroad Association “The Shack” Scratch Build -Mike Jobe.
Folded Self Mailers and Letter Size Booklets. Size. Third fold self mailer. Weight. 60# text 1 inch Tabs. 2 tabs on top and 1 tab on lead edge Bottom.
Pneumatic Arm Assembly Instructions. Contents of Pneumatic Arm Kit Wooden pieces (⅜” cross-section): 1 X 24”; 1 X 21⅛”; 8 X 7½”; 4 X 7⅛”; 4 X 7”; 2 X.
1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test.
Colorado Space Grant Consortium Foam Core Class #05 Foam Core Class #05.
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
Drafting Rear Elevations. Start with outer frame when drafting standard flat. Heights are generally in multiples of 2’-0”. Outer Frame.
Stave core assembly Stephanie Yang WP4 face to face meeting, Lancaster University 20 Feb 2014.
TOOL: Radial Arm Saw NEXT STEP: Radial Arm Saw RESULTS: Finish Top Apron Pieces at 9” L x 4” W x ¾ “ Th PROJECT Square Plant Stand PART Top Apron # NEEDED.
How to construct a handbag
Darkness tent template
Supplies List for Farm Themed Busy Book
How to make a paper bag book cover
How to construct the draw string bag Some things you’ll need to make a bag.
Lone Star Region National Model Railroad Association “The Shack” Scratch Build -Mike Jobe SESSION 2.
Construction Framing Mr. Brock. Lumber 2x4s are not actually 2” by 4”
Mars Reconnaissance Orbiter1:48 scale READ ALL THE INSTRUCTIONS AND INSPECT THE PARTS SHEETS FIRST. Score fold lines and cut out the parts. High Gain Antenna.
1 HVACR116 – Trade Skills Plan Views Elevations Plan Views Elevations.
Final Outcome Accuracy of measurements Material Design.
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
Beginning Steps of the Can Challenge PowerPoint made by: Cameron Niemann.
Wood Construction Materials Hardwood Comes from deciduous trees such as oak, birch, walnut, maple, and hickory.
Using the Alphabet of lines. Drawing should be near bottom left corner. The front view shows how wide and how tall the object is.
Stage Construction Theatre Workshop I. The Stage Crew  Set construction crew- build the set  Set designer- creates the design/idea for the set that.
Pop-up Evergreen Tree. Designed by Robert Sabuda.
One Point Perspective Design and Technology. One Point Perspective Task 3 Here are some high quality examples of what we are aiming to produce by the.
Top surface of B3L Top surface of B3L B3L12 Tried to blow off, but couldn’t Insde of tube. B3L15 The dot at the middle.
HVACR116 – Trade Skills Plan Views Elevations. Plan Views.
Using commercial patterns Trimming, pinning, cutting out, transferring pattern markings. © PDST Home Economics.
The temple-pyramids were one of the Mayans most impressive achievements. The massive stone structures were built in the heart of Mayan cities. Mathematical.
Gift bag decorated with decoupage. 1. Draw the shape of the bag on a sheet of brown paper (or any other solid one)
Castle Project Name___________________ Period___________________ Mr. Martin- World History- Room 8.
Layers of the Earth Foldable
1 Part 3 Getting Ready to Sew. 2 Stay Organized Gather all your notions and supplies Double-check the steps to take Press after each construction step.
Design and technology st aidan’s high A pictorial sketch of a wall lamp is shown. The shade is in the form of a cut cone. Draw, from the given.
Lean Notes Page. Lean Notes What are the four things that need to get written on the reference edge ?_______ ______ ______ ______ This written information.
Choose your size: Before you begin making any cuts of the pattern, if you are still unsure about your size, you can measure your hips and side length.
Tessellation Project Supplies needed: 3 x 5 index card for every 2 students Scissors Ruler One sheet of white paper One sheet of construction paper Pencil.
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Courtesy Eric Witherspoon, Sonex plans #815 Photo 1: What it is. Photo 2: How it works. Sonex Wing Stand Answer to photos 3 and 4: Want leading.
Hexagonal Prisms Developments.  A development is a flat template of a 3D shape that when folded up in the correct way makes the actual shape of the 3D.
Sit at tables Take notes on how to construct a Tetrahedron Kite.
Quick and Easy Model Building
How to Cover Your Book.
Construction Framing Mr. Brock.
The Complete Guide to Mounting Images
Day 1.
Terms to Know Before You Sew!
Review Slides for Final on May 30th
Hot-Air Balloons.
Building a Nightstand Woods 1 Final Project Step #1
Tides Foldable.
Space and Shape.
Unit 8 Floor Framing.
Wiring the Light and Relay
How to Use a Protractor.
Cubes Orthographic projections One and Two-point Perspective
Break down Lance rack Cut one of each of these for each rack
Plan The next question would be ... but how do we get the drawings from the 3D object? This will be explained over the next few pages. Take a look at.
Star Life Cycle Accordion Book
Makeup Bag.
Presentation transcript:

Ork Watch Tower – First Floor Measurements may vary on your printer Wall 3 C 2 3 Wall 1 A 1 Wall 2 B 1 2 Wall 4 D 3 4 1st Floor / Ground Floor A B E D C F 1 inch Page 1

Wall 5 Wall 6 Roof Supports Ground Floor Level 1st Floor Roof 4 5 Roof Supports There is no right or wrong angle or measurements for these. Ground Floor Level Red dashed lines are 3/8 inch (thickness of a sheet of foam core) from the edge. Black Dashed and dotted lines are a marke for the roof level line. You will need this to place pieces to support the upper level and roof. You will glue the roof supports to this line, so that the roof sits flush with the top of the model on walls 6 and 1. This is done by pinning and glueing the supports top edge to the dashed and dotted black line. Any Scrap foam core will be used to add to the outside, to break up a flat smooth pattern, so keep your small cuttings. 1st Floor Roof Ground Floor Roof The roof is again the same size as the floor, but I cut it on a slight angle, so the bottom is smaller than the top. This will allow for it to slide on and off of the top. 1 inch Page 2

Construction Layout – First Floor Measurements may vary on your printer 1st Floor / Ground Floor A B E D C F Wall 1 1 Wall 2 2 Wall 4 3 4 Wall 3 Wall 5 5 Wall 6 1 inch Page 3

Ork Watch Tower – Second Floor Measurements may vary on your printer B2 A2 C2 E2 F2 5 5 8 1 1 2 2 3 3 4 4 6 2nd Floor Building Base D2 G2 C2 H2 8 6 7 H2 E2 F2 7 G2 1 inch Page 4

Second Floor Level 2nd Floor Building Roof Roof Supports The Second floor is constructed in the same manner as the first floor. The edges are cut to almost a 45O angle, this will help join the edges and prevent a lot of trimming. But it is ok if it is not perfect, it is actually better since it will look more like an ork built it! Below you will see the placement of the second floor placement on the roof of the first floor. Roof Supports Done the same way as we did the first floor. 2nd Floor Placement 1st Floor Roof Page 5 1 inch

Ork Watch Tower – Support Arm Measurements may vary on your printer Back Edge Underside Support Base Support Base Pt. 2 SPINE 1 SPINE 2 SPINE 3 Crows Nest Base Crows Nest Base Pt. 2 B B B 1 inch Page 5

Ork Watch Tower – Support Arm Measurements may vary on your printer Support Arm The three identical spines will be the main support. They will be touching, sandwiched at the top, to make the support arm. The back edge and underside will be pinned and glued along the edge of the support arm to close it up. These may be cut from foam core, however heavy card stock will be easier to cover the edges. The crows nest will be glued on top when Complete in the same manner as the support base. A A Yellow arrow indicates Tower Angle Hole in Base Pt. 2 Base Pt. 2 Support Arm Base 2nd Floor Support Arm Base Pt. 2 Support Arm Base B B Construction Example for Spine and Base 1 inch Page 6

Ork Watch Tower – Crows nest Measurements may vary on your printer Rope Arm A C E D B F Support Arm Building the crows nest will be completed just like the other buildings. The rope arm will be glued to the arch (A) and used to fasten a climbing rope. That will be used to “climb” to the crows nest. The two pieces will be glued side by side, flush to the end. The red dotted line indicates the position where the rope arm will be glued.\ The black dashed line is where your will glue the crows nest floor part 1 on the bottom of the crows nest floor part 2. The crows nest can be glued at any angle on the support arm that you wish. Remember that the rope should hang to the second floor. Crows Nest Floor Part 2 A Crows Nest Floor Part 1 B F C E D Crows Nest Floor Part 2 (top)