Task 4.2 Grid Coordination & DR Activation Module

Slides:



Advertisements
Similar presentations
ESTORAGE WP 2 Progress & Results 28/10/2013 Jean-Christophe Passelergue Olivier De l’Hermuzière.
Advertisements

The future Role of VPPs in Europe Pan European Balancing Market: EU-FP7-Project eBadge Workshop on DSM Potentials, Implementations and Experiences 20 th.
The research leading to these results has received funding from the European Community's Seventh Framework Programme (FP7/ ) under grant agreement.
OPTIRAIL WORKSHOP · OCTOBER 23, 2014 · BRUSSELS WP5: “Integration and Usability validation of models”
GREDOR - GREDOR - Gestion des Réseaux Electriques de Distribution Ouverts aux Renouvelables Project scope - Présentation du projet Moulin de Beez, 29/04/2015.
André Weiß, DLR Institute of Space Systems Concurrent Evaluation – An Application for DLR’s Concurrent Engineering Facility SECESA 2010, October,
Frankfurt (Germany), 6-9 June 2011 Power System Impacts from Large Scale Deployment of EV -The MERGE project – João A. Peças Lopes
Microgeneration and new end-use technologies in ADDRESS, INCA and SEESGEN-ICT Jussi Ikäheimo (VTT) (& Regine Belhomme, Giovanni Valtorta) IEA DSM 17 workshop.
1 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 Overview of activities of the first six months and of the.
McGraw-Hill/Irwin © The McGraw-Hill Companies, All Rights Reserved BUSINESS PLUG-IN B17 Organizational Architecture Trends.
Enterprise Systems Architectures EGN 5621 Enterprise Systems Collaboration (Professional MSEM) Fall, 2012.
Kick of WP3 Steps towards building Oxford, first project meeting :30 am – 11:15 am.
ECOGEM Cooperative Advanced Driver Assistance System for Green Cars Burak ONUR Project Coordinator R&D Support Executive
Electric Energy Systems Smart Grids and IEA ENARD – Annex II: DG System Integration into Distribution Networks Helfried Brunner Operating Agent AnnexII.
Optimization of active distribution networks: design and analysis of significative case studies for enabling control actions of real infrastructures D.Moneta*,
ESSRT In-Process Review September 10, Agenda 1.Work Completed Till Date 2.Scope of future activities and deliverables 2.
CERES-2012 Deliverables Architecture and system overview 21 November 2011 Updated: 12 February
25/02/2016 SW Development Process - SW Architecture/Stefan L. Meier/Electronic Product Development SW Architecture EPD Software Development Process 1.
1 Watson Peat Using Intelligence to INSPIRE Future Networks 12 th May 2016.
Integration of Demand Side Management, Distributed Generation, Renewable Energy Sources and Energy Storages Task status report, Task XVII EXCO meeting.
RESERVOIR Service Manager NickTsouroulas Head of Open-Source Reference Implementations Unit Juan Cáceres
WP7 - Dissemination of Results & Exploitation
Innola Solutions, Inc., USA March 24, 2017
WP2 - INERTIA Distributed Multi-Agent Based Framework
© 2016 ProsumerGrid, Inc., All Rights Reserved
User Profiling and Ambient UIs
Transmission-Distribution Interface Working Group Meeting
Chapter 19: Network Management
Proaktives Verteilnetz - Proactive Distribution Grid
Considerations for a Modern Distribution Grid
Task 2.5: Holistic Flexibility Models (M10 - M24)
WP4 - INERTIA Aggregators Monitoring, Management and Control Hub
A new platform for testing TSO-DSO coordination schemes
[WP1] T1.2 User and Business Requirements
[WP1] T1.2 User and Business Requirements
ESRDC Overview for Load Management
WP2 INERTIA Distributed Multi-Agent Based Framework
Presentation of new INERTIA partner:
Project Management Status
Overview of MDM Site Hub
Next Generation Distribution System Platform (DSPx)
WP1 – Smart City Energy Assessment and User Requirements
Project Management Status
WP2 INERTIA Distributed Multi-Agent Based Framework
WP2 - INERTIA Distributed Multi-Agent Based Framework
Operational procedures and tools for scheduled shutdowns at CC-IN2P3
WP1 - INERTIA Framework Requirements, Specifications and Architecture
THE PROCESS OF EMBEDDED SYSTEM DEVELOPMENT
Task 5.2 INERTIA Simulation Test Suite TECNALIA Joseba Jimeno
WP3 Local Control and Automation Hub,
Advancements in Availability and Reliability computation Introduction and current status of the Comp Reports mini project C. Kanellopoulos GRNET.
Presentation of the three technological pilots
Task 5.2 INERTIA Simulation Test Suite TECNALIA Joseba Jimeno
WP5 INERTIA Integration & Lab Testing
WP1 INERTIA Framework Requirements, Specifications and Architecture
The Extensible Tool-chain for Evaluation of Architectural Models
postgrad. Sergiy Korotunov prof. Galyna Tabunshchyk
Qin Wu Roni Even Ying Cheng IETF 103 Bangkok, Tailand Oct 12, 2018
This sprint should be used for focusing on:
Lecture 1: Multi-tier Architecture Overview
12th IEEE PES PowerTech Conference
2. An overview of SDMX (What is SDMX? Part I)
RECARE set-up Rudi Hessel on behalf of coordination team
Presented by Prof. dr. Nermin Suljanović Elektroinštitut Milan Vidmar
Wide Area Workload Management Work Package DATAGRID project
AIMS Equipment & Automation monitoring solution
Partner Implications from Seminar: New Approaches to Capacity Development Break-out Group: Role of Assessment frameworks.
The Global Forum Electricity Ancillary Services and Balancing | Berlin, SmartNet Pilots: The demonstration of the different TSO-DSO coordination.
Content. Content Energy system design steps.
End-to-End Reconfigurability (E2R)
Presentation transcript:

Task 4.2 Grid Coordination & DR Activation Module TECNALIA Joseba Jimeno

Task 4.2 Index Task Overview DR Activation and Grid Coordination Work plan Deliverable D4.2 Current status Issues

T4.2 -Task Overview Objective: Duration: Partners involved: “Design tools required by the DSO to operate the network in a safe and optimal way. These tools provide the link between the network operators and their requirements of flexibility from the customers” [DoW] Duration: Start: March 2013 (M6) End: September 2014 (M24) Partners involved: TECNALIA (8 pm), ENG (6 pm), PPC (5 pm), ALMENDE (4 pm), ETC (2 pm) Deliverables: D4.2 “Grid Coordination & DR Activation based on multi-agents framework Modules” (M24)

T4.2 – DR Activation and Grid Coordination Architecture of the DSO Control Hub

T4.2 – DR Activation and Grid Coordination Interaction between the DSO and Aggregator Control Hub

T4.2 – Work plan Identification of the DR services Main responsible partner: PPC + ETC Expected deadline: M20 Network operation components Main responsible partner: TECNALIA Expected deadline: M24

T4.2 – Work plan DSO-Aggregator communications and data management Main responsible partner: ENG Expected deadline: M22

T4.2 – Deliverable D4.2 D4.2 Compiles results form Task 4.2 and 4.3 (M24) Two separate parts: DSO Control Hub (Task4.2) Aggregator control and optimization (Task4.3)

T4.2 – Current Status Identification of the services that the INERTIA Aggregator can provide to the DSO First draft from PPC - Done ETC to review/expand the current draft - Pending Characteristic of the DR - Pending Time from service request to service deployment Duration of the flexibility service Energy to be deployed Reliability requirements

T4.2 – Current Status Implementation of network operation components Network management - Done Restriction analysis - Done DR dispatch calculation - Pending Definition of Demo Scenarios Congestion management: network reconfiguration after a fault - Done Voltage control: high renewable production - Pending

T4.2 – Current Status Implementation of the DSO-Aggregator communications and data repository Status??? (ENGINEERING) Reporting for the deliverable D4.2 Task 4.2 Services – First draft Demo scenarios - First draft Description of components – Pending Task 4.3 (ALMENDE) ????

T4.2 – Issues Mapping between MV supply points and Local Control Hubs Integration in the DSO Control Hub: Data repository Communications interface Anything else from ENG side???