Cryoplant Controls Installation

Slides:



Advertisements
Similar presentations
ESS Cryogenic System Design
Advertisements

SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62)
January 4, 2007 Project Overview RHIC II Project Internal Cost Review Roberto Than Cryogenics Systems January 4, 2007.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
PIP-II Cryogenics Arkadiy Klebaner and Jay Theilacker PIP-II Collaboration Meeting 9 November 2015.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
LCLS-II Cryoplant Overview
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
Thomas Jefferson National Accelerator Facility Page 1 Dana Arenius Cryogenics Control Account Manager 12 GeV Upgrade Project X Collaboration September.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
Installation Package - Electrical
Hongyu Bai LCLS-II 2 K Cold Box PDR September 27, 2016
Cryoplant Installation Organization
Vishy Ravindranath LCLS-II 2 K Cold Box FDR March 9, 2017
Cryogenic Plant Controls - Configuration
Neutrino Platform Proximity Cryogenics 68th EHN1 Cryogenics Integration TE-CRG
Cryoplant Installation Cost and Schedule Installation PDR
RF Systems and Controls for the LERF CM Tests
Cryogenic Plant Controls – Cost and Schedule
Installation Procurement Package
Dana Arenius LCLS-II 4.5K Cold Box Director’s Review November 16, 2016
Process Requirements and Design Approach
Cryogenic Plant Electrical and Controls
2 K Coldbox Safety and ESH
2K Cold Box FDR Introduction
Cryomodule test stand at ESS site
He Plant, LN2 Systems and Commissioing
2K Cold Box PDR Introduction
FRIB Cryogenic Support
Cryoplant Installation Overview
LCLS-II CRYOPLANT CONTROLS HARDWARE FINAL DESIGN REVIEW
LCLS-II Cost Details E. Daly / C. Hovater / M. Wiseman with help from Accel Ops and Engineering 03-AUG-2017.
Cryoplant Installation Scope
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
LCLS-II 2K Cold Box Controls Design Review
Overview of Mechanical Design
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
LCLS-II Cryoplant Controls Readiness to Procure
From Design to Installation courtesy R. Folch S. Atieh TS / MME
Cryogenic C&C Scope of work
Status of the cryogenic system for B180
Instrumentation and Controls
2K CB FDR Overview:  Agenda, Charge, Review Process
2K Cold Box Process Design
2K Cold Box Mechanical Design
SC1R Cold Box PDR Controls
Cryogenic Plant Controls – Safety Switches
Pressure Piping Analysis
Cryoplant Installation Design Summary
2K Cold Box Cost, Schedule & Staffing
2K Cold Box Cost, Schedule & FDR Summary
LCLS-II Cryoplant Controls FDR Status of Past Reviews and Lessons Learned Dana Arenius Sept 13, 2017.
PLC Coding and Local HMI
Charge 2. Equipment Protection 3. Definition and Documentation
Scope, Requirements Deliverables & Schedule
Documentation Chris Scanlon and Ritendra Bhattacharya
Overarching Commissioning Plan
Operator Training Requirements
Control Hardware & Status
Testing Plan and Status
SNS Cryoplant Commissioning Past Experiences
SNS PPU Cryomodule Instrumentation
CryoPlant Commissioning
LCLS-II Cryoplant Controls Workshop.
Onsite Training at JLab
ESR2 Cryoplant Utilities
SNS PPU Cryomodule Instrumentation
LCLS-II Operations in LERF
Cryogenic upgrade of B163, B165 & B253 Status Meeting 19th December 2018
Presentation transcript:

Cryoplant Controls Installation Chris Scanlon LCLS-II Cryoplant Installation PDR October 18, 2016

Purpose: To detail the controls work in the Installation Specification Outline Purpose: To detail the controls work in the Installation Specification Topics Controls Installation Scope Roles and Responsibilities Documentation Risks Schedule Summary LCLS-II Cryoplant Installation PDR, Oct 18, 2016

Controls Installation Scope LCLS-II Cryoplant Installation PDR, Oct 18, 2016

Controls Installation Scope To be installed: Control boxes containing PLCs Field terminal boxes Field instrumentation Cable tray, conduit and electrical connections between field devices, terminal boxes and control boxes Power to control boxes Ethernet to control boxes, IT room and cryoplant monitoring room LCLS-II Cryoplant Installation PDR, Oct 18, 2016

Controls Installation Scope Controls for both cryoplants are procured at the same time for each phase. Phase 1 Gas Management System Main Compressor System Final Oil Removal System Depressurization Manifold Oil Management System Cool Down/Clean Up System Cooling Water System One gas management system exists in each cryoplant. Utility System Oil Processor Skid Gas Distribution System Interface Boxes Recovery System Instrument Air System Gas Storage System N2 Distribution System Guard Vacuum System One utility system is shared by the cryoplants. IT & Cryoplant Monitoring Rooms Monitoring computers Networking Pressure Transducer LCLS-II Cryoplant Installation PDR, Oct 18, 2016

Controls Installation Scope Controls for both cryoplants are procured at the same time for each phase. Phase 2 4K Cold Box Main Cold Box Test Heaters LHe Storage Dewar One 4K cold box system exists in each cryoplant. 2K Cold Box Cold Compressors One 2K cold box system exists in each cryoplant. Contamination Analyzer LCLS-II Cryoplant Installation PDR, Oct 18, 2016

Roles and Responsibilities JLab Design control panel and terminal box assemblies Design interconnecting wiring diagrams Procure control panels and terminal boxes Define interfaces between vendor designs and control system Final testing before commissioning SLAC Hire installation GC Program EPICS interface to Cryoplant Differential Pressure Transducer LCLS-II Cryoplant Installation PDR, Oct 18, 2016

Roles and Responsibilities Equipment Vendors Provide transportation, delivery and rigging plan of equipment Testing at vendor: Hi-pot, continuity GC Provide detailed controls installation plan Procure and install field instrumentation BOM Install necessary conduit and cable tray Rigging, offloading and installation of equipment Wire between instruments, terminal boxes, PLC enclosures Testing upon receipt: Hi-pot, continuity, motor rotation direction, phase orientation LCLS-II Cryoplant Installation PDR, Oct 18, 2016

Roles and Responsibilities PLC Network Connections LCLS-II Cryoplant Installation PDR, Oct 18, 2016

Roles and Responsibilities Example of EDM screen via EPICS at JLab LCLS-II Cryoplant Installation PDR, Oct 18, 2016

Requirements Documents Documentation Requirements Documents Functional Requirements Documents • LCLSII-2.7-FR-0492-R0 - Cryogenic Controls Functional Requirements Specification • LCLSII-4.1-FR-0327-R0 - Cryogenic Systems Integration • LCLSII-4.8-FR-0244-R0 – Cryogenic Plant Functional Requirements Specification Interface Control Documents • LCLSII-1.2-IC-0278-R0 - Radiation Safety System Controls to Accelerator Systems, Cryogenic Systems, Photon Systems, and Infrastructure Systems • LCLSII-2.5-IC-0056-R3 - Accelerator Systems to Cryogenic Systems Engineering Notes • LCLSII-4.9-EN-0289 - CDS Control Loop Functions • LCLSII-4.9-EN-0255 – CDS and Cryomodule Failure Mode and Effects Analysis • LCLSII-4.8-EN-0336 – Cryoplant Margin, Operability and Maintainability LCLS-II Cryoplant Installation PDR, Oct 18, 2016

Applicable Codes During Installation NEC – 2014 Edition Documentation Applicable Codes During Installation NEC – 2014 Edition NFPA 70E – 2015 Edition SLAC Control of Hazardous Energy SLAC Electrical Equipment Inspection Program SLAC BIO-approval LCLS-II Cryoplant Installation PDR, Oct 18, 2016

Documentation Phase 1 Phase 2 Controls procurement specification: 79120-S1500 Drawings for phase 1 are 95% complete Oil processor and purifier interfaces defined by vendor Rest of phase 1 interfaces defined by JLab Functional analyses defined by JLab Phase 2 Drawings for phase 2 are 50% complete 4K cold box control interfaces Physical interfaces defined by vendor at FDR, Oct 2016 Functional analysis defined by vendor at FDR, Oct 2016 2K cold compressor physical interfaces defined by vendor at FDR, Jan 2017 2K cold box control interfaces defined by JLab BOM for loose instrumentation is 50% complete LCLS-II Cryoplant Installation PDR, Oct 18, 2016

Documentation – Examples Example of a PLC enclosure assembly drawing LCLS-II Cryoplant Installation PDR, Oct 18, 2016

Documentation – Examples Example of PLC input card wiring, including field terminal box LCLS-II Cryoplant Installation PDR, Oct 18, 2016

Documentation – Examples Example of field terminal box wiring and assembly, including pressure transducers LCLS-II Cryoplant Installation PDR, Oct 18, 2016

Risks Control panels are not delivered on time Low risk – months between planned completion of controls installation and supported system installation completion and commissioning Delay in installation completion Low risk – 5 months between planned completion of controls installation and supported system commissioning Installers exposed to high noise Low risk – Phase 1 (compressor room) installation complete before commissioning of WHCs. Phase 2 (cold box room) is isolated from the WHC noise. LCLS-II Cryoplant Installation PDR, Oct 18, 2016

Phase 1 controls equipment procurement award Nov 2016 Schedule Phase 1 controls equipment procurement award Nov 2016 Loose instrumentation BOM complete Jan 2017 Phase 2 controls equipment procurement award Jan 2017 Phase 1 controls equipment delivery to SLAC Jul 2017 Install Phase 1 controls equipment and loose instrumentation Oct 2017 Phase 2 controls equipment delivery to SLAC Oct 2017 Install Phase 2 controls equipment and loose instrumentation Jan 2018 LCLS-II Cryoplant Installation PDR, Oct 18, 2016

The End Questions? LCLS-II Cryoplant Installation PDR, Oct 18, 2016