I-66 OUTSIDE THE BELTWAY Shrevecrest HOA JUNE 21, Susan Shaw, P. E

Slides:



Advertisements
Similar presentations
I-66 Corridor Improvements Outside the Beltway CTB Briefing
Advertisements

I-394 Express Lane Community Task Force March 18, 2004.
New I-65 Interchange at Worthsville Road Welcome!.
Dulles Corridor Metrorail Project 23-mile new Metrorail line branching off the Orange Line after East Falls Church 11 new stations 5 in Phase 1: East Falls.
Environmental Assessment Public Meeting
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
Waheed Uddin, PhD., P.E. Professor and Director, CAIT Center for Advanced Infrastructure Technology Department of Civil Engineering The University of Mississippi.
Presentation to the Subcommittee on Highways and Transit and the House Committee on Transportation and Infrastructure Peggy Catlin, Deputy Executive Director.
Barrington Road at Jane Addams Memorial Tollway (Interstate 90) Interchange Improvement Study Hoffman Estates Village Hall June 27, 2012.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
1 I-81 INITIATIVES IN VIRGINIA Fred Altizer, Jr., P.E. Assistant to the Chief Engineer I-81 Program Manager.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
Freeway Congestion In The Washington Region Presentation to National Capital Region Transportation Planning Board February 15, 2006 Item # 9.
Regional HOT Lanes Study Preliminary Findings An Informational Hearing of the Senate Transportation and Housing Committee Toll Roads and Managed Lanes.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
I-15 Express Lanes Project January 2012 I-15 Express Lanes Project January 2012.
I-66 Corridor Improvements Morteza Farajian Interstate 66 Corridor Improvements From US Route 15 in Prince William County To Interstate 495 in Fairfax.
By: Patricia Amaro, Billy Pappas, Ryan Steele, and DJ Soven.
I-465 at I-65 Interchange Modification Public Meeting 6:00pm Monday, October 1, 2012 South Grove Intermediate School Beech Grove, Indiana.
I-465 at I-65 Interchange Modification Public Meeting 6 p.m., Thursday, August 14 South Grove Intermediate School, Beech Grove, IN.
Prospective Rural Additions Meeting JULY 15, 2015.
Status Report on the Regional Value Pricing Study Ronald F. Kirby, Director of Transportation Planning November 15, 2006 Item 11.
RTD Board Update October 8, 2013 US 36 Bus Rapid Transit.
Rebuilding Rhode Island’s Aging Bridges with Truck Tolling
Englewood Mews HOA May 23, 2017 Michelle Holland, Megaprojects Communication Manager Virginia Department of Transportation John Morse, I-66 Project.
Using Public-Private Partnerships to Move More People The Story of HOT Lanes in Northern Virginia January 30, 2017 Morteza Farajian, Ph.D.
All About the County Road 22 Roundabout
Integrating Transit and Highway Solutions In High Volume Corridors
Update of Transportation Priorities Plan
Charlotte Region Fast Lanes Study
NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association June 15, 2016 Helen Cuervo VDOT District Administrator, Northern Virginia.
Four Winds Condominium Association August 2, 2017
Office of Transportation Planning Modal Planning Update
I-77 High-Occupancy Toll Lanes
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Sully District Council of Citizens Associations January 25, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation.
Project Status & Right-of-Way Acquisition
DATA Transportation 101 Project Status March 20, 2002
I-280 Corridor Study and I-280/Winchester Blvd Project
U.S. 98 (State RoaD 30) Project Development & Environment (PD&E) Study
NGTA Halton Planning and Public Works Committee
Major Projects in Development
Facebook Campus Expansion Project EIR
Project Status Update I-680 Southbound HOV Gap Closure Project Environmental Phase September 2011 PARSONS.
Project Overview Multimodal improvements to 22.5 miles of I-66
The Oakton Condominium Association September 12, 2017
Draft Transportation Element September 6, 2017
I-66 Outside the Beltway Design Public Hearing Meetings November 13, 14 & Susan Shaw, P.E., Megaprojects Director Virginia Department of.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
CDOT North I-25 Express Lanes Update April 28, 2016
Arizona Conference on Roads and Streets Multimodal Cities: Addressing Issues in Transit Corridors March 24, 2016.
I-94 Maple Grove to Rogers Community Noise Engagement Meeting #1
Update on Route 1 Efforts Transportation Advisory Committee October 20, 2015 Leonard Wolfenstein, FCDOT Jane Rosenbaum, FCDOT Doug Miller, FCDOT Department.
Florida Transportation Commission FY 2009
Slugging in the I-395 Corridor
Board Transportation Committee October 13, 2015
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Responsibilities and FUNDING
Lower Makefield Township Community Meeting
SR 400 Express Lanes: Market Sounding
Endorsement of the Recommended Design Concept (Preferred Alternative) for Transforming I-66 Outside the Beltway Board Transportation Committee October.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Geometric Design: General Concept CE331 Transportation Engineering.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
PUBLIC HEARING S.R. 30 (U.S. 98 Business/West Garden Street)
Harbour Island Force Main Replacement
Chicago to Council Bluffs-Omaha
Major Initiatives in Hampton Roads
Presentation transcript:

I-66 OUTSIDE THE BELTWAY Shrevecrest HOA JUNE 21, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

Where We Are In Design Process July 2016 VDOT Design Concepts and RFP Summer 2017 Concept Adjustments Late 2017 CONSTRUCTION Start-up November 2016 Partner Selected (I-66 Express Mobility Partners) TODAY October 2016 Technical Proposals Submitted from Two Teams Including Alternative Technical Concepts (ATC’s) June 2017 Public Information Meetings Fall 2017 Design Public Hearing Summer 2017 Environmental and Traffic analyses of concepts Ongoing Design Refinements

Environmental Analyses Tier 1 Environmental Impact Statement approved November 2013 Following public hearings and input, Tier 2 Draft Environmental Assessment approved January 2016 Federal Highway Administration issued a Finding of No Significant Impact on June 22, 2016 on the Tier 2 Draft Environmental Assessment ACTIVITY To Date Revised and new concepts will require environmental and traffic analyses Additional environmental analysis Summer 2017 based on revised concepts - available Fall 2017 and Beyond 2018

Noise Analysis Process Identify noise receptors Perform noise measurements at representative receptors along the corridor Perform noise modeling Identify impacts (is noise mitigation warranted?) Design and assess mitigation (typically noise walls) Is the wall feasible? Is the wall reasonable? Noise walls were shown in preliminary concept plans in 2015 Confirm noise study results and perform updated noise analyses based upon updated concept plans and traffic analyses Present noise study results and noise wall locations at design public hearings in fall 2017 Solicit public input from benefited property owners and renters (voting process) Incorporate approved noise walls into the final road design construction plans NEPA and Preliminary Design FINAL DESIGN

Noise Walls in Your Community If your community has a noise wall today, you will have one in the future Replacement walls will be at same height or higher than existing walls and when a wall is removed work must be continuous until replacement (240 day goal) Benefitted property owners (or tenants) will be consulted prior to any new walls being installed (voting process)

What to Expect During Construction Construction start-up late 2017 within existing right of way Construction ramp-up spring 2018 Construction to take place throughout the 22.5 mile corridor for duration of project No lane closures on I-66 during peak periods Public will be kept informed through Transform66.org, social media, TV, radio, print media, roadway signage Provide advance construction information to adjacent communities and address issues of concern – Good Neighbor policy

Trucks on I-66 PERMITTED PROHIBITED All types of trucks currently travel on I-66 Certain types of trucks will be allowed on I-66 Express Lanes Large trucks will pay at least 3 to 5 times the passenger-car rate for tolls Designed for safe operation of buses and trucks PERMITTED PROHIBITED Two-axle vehicles, including single-unit trucks, permitted, consistent with other express lanes in region Multi-axle vehicles will be permitted including tractor-trailer trucks pulling a single trailer Tractor-trailer trucks pulling more than one trailer will be prohibited Pick-up or other single-unit trucks pulling a single trailer will also be prohibited

I-66 Inside the Beltway Program Tolling during weekdays, peak hours, peak directions beginning December 2017 Eastbound: 5:30 – 9:30 a.m. and Westbound: 3:00 – 7:00 p.m. E-ZPass required for all users; E-ZPass Flex if HOV HOV2 toll-free in 2017, HOV3 toll-free when express lanes open outside Beltway in 2022 Multimodal projects benefitting I-66 users funded by toll revenue Widening I-66 eastbound between Dulles Connector Road and Fairfax Drive-Exit 71 (approximately 4 miles) – construction begins in 2018 and open in Mid-2020 Clean Special Fuel License Plate drivers traveling alone will need to pay toll unless meeting HOV requirements 8

THANK YOU