JU September Stakeholder Engagement Conference Webinar #1

Slides:



Advertisements
Similar presentations
1 Overview of ACC BTA Order and Planned Utility Response Process Arizona Corporation Commission Fifth Biennial Transmission Assessment Commission Decision.
Advertisements

Dynamic Distribution Grids © 2012 San Diego Gas & Electric Company. All trademarks belong to their respective owners. All rights reserved. Neal Bartek.
Project Change Management
PSCI PHARMACEUTICAL SUPPLY CHAIN INITIATIVE The Pharmaceutical Supply Chain Initiative – An Overview Presented by [Add name] [Add role title] [Add company.
1 Presented by Nancy Rehbine Zentis, Ph.D. SFLODN, September, 2008 Developing Leadership Competencies.
DNV GL © SAFER, SMARTER, GREENER DNV GL © Second Annual Utility of the Future Pulse Survey Key Findings 1 July 15, 2015 Presentation to C/CAG RMCP.
© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part.
Demand Forecasting
© 2015 Electric Power Research Institute, Inc. All rights reserved. Matthew Rylander EPRI April 20, 2015 Streamlined Method for Determining Distribution.
Presentation to Energy Optimization Collaborative October 2015 ENERGY A Proposal to Expand the Calibration Research Agenda: Part Two.
SOUTHERN CALIFORNIA EDISON® SM Preferred Resources Pilot August 17, 2015
1 Modeling Distributed Generation Adoption using Electric Rate Feedback Loops USAEE Austin, TX – November 2012 Mark Chew, Matt Heling, Colin Kerrigan,
Transforming the Distribution Grid
New England Electricity Restructuring Roundtable February 26, 2016 New Technologies, Practices, and Policies to Transform Retail Energy Markets James T.
Institutional Support Vladimir Koritarov Argonne National Laboratory April 2016.
PG&E’s Distribution Resources Planning READ AND DELETE For best results with this template, use PowerPoint 2003 Planning the “Networked Grid“ Integrated.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
Frankfurt Intelligent Buildings and Big Data Greg Walker, Research Director CABA (Continental Automated Buildings.
Regulatory Considerations for Deploying Distributed Energy Storage Sky Stanfield, Of Counsel Keyes, Fox & Wiedman LLP July 9, 2015 MA Stakeholder Conference.
Integrated Capacity Analysis Working Group June 1, am – 12 pm CPUC Hearing Room E drpwg.org.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
DER Provide Grid Services for the 21 st Century Electric System Lorenzo Kristov, Ph.D. Principal, Market & Infrastructure Policy More Than Smart Conference.
1 Grid Operations Engagement Group August 18, 2016 Monitoring and Control Summary of Stakeholder Engagement Group Meetings.
Draft for Discussion Purposes Only Market Operations Engagement Group Customer Data Recap of the July 26, 2016 Meeting Presentation material does not represent.
Eric Peirano, Ph.D., TECHNOFI, COO
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Photovoltaic (PV) Inverter Market Price, Packaging Trends, Industry Outlook.
JMFIP Financial Management Conference
Distribution System Planning Engagement Group
LNBA Subgroup: Avoided Transmission Value
Grid Operations Engagement Group ISO/DSP Interaction and Coordination
Transmission-Distribution Interface Working Group Meeting
Considerations for a Modern Distribution Grid
Eric Peirano, Ph.D., TECHNOFI, COO
Locational Net Benefit Analysis Working Group
MGMT 452 Corporate Social Responsibility
JU September Stakeholder Engagement Conference Webinar #1
Market Operations Engagement Group EVSE Working Group – Principles
JU Stakeholder Engagement Conference
Matthew Wittenstein Electricity Analyst, International Energy Agency
SWOT Analysis Overview Hotel Level SWOT Analysis Template
Market Operations Engagement Group EVSE Working Group
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Photovoltaic (PV) Inverter Market Price, Packaging Trends, Industry Outlook.
Breakout Session on Smart Grid Data Analytics
Grid Operations Engagement Group
Integrating Distributed Energy Resource into Grid Operations
JU September Stakeholder Engagement Conference Webinar #1
Lorenzo Kristov, Ph.D. Principal, Market & Infrastructure Policy
The Transition to a High DER Future
Empowering Electric Industry Human Resources Transformation
Grid Modernization and Distribution System Planning – What’s Going Around the Country? February 22, 2018 Liesl Clark, President.
Opportunities in the Changing Energy System

ISO New England Net Load Analysis with High Penetration Distributed PV
Integrated Resource Planning and Load Flexibility Analysis
Scenario Scoping Process
Reliability Assessment Committee Reliability Workshop Priorities
Grid Modernization in Massachusetts
Integrated Distribution Planning Process
Introduction to Growth Scenario Working Group
Inter-Staff Collaboration Summit
Smart Energy Infrastructure
Service Oriented Architectures (SOA): What Users Need to Know.
Infrastructure Needs and Our Electric Grid for the 21st Century
Reliability Assessment Committee Reliability Workshop Priorities
Scenario Scoping Process
Forecasting and Operations CAISO Case
KEY INITIATIVE Financial Data and Analytics
California Transportation Electrification Activities
Energy Storage Roadmap & Flexibility Roadmap Information Session
Electricity Distribution and Energy Decarbonisation
Presentation transcript:

JU September Stakeholder Engagement Conference Webinar #1 September 15th, 2016 Demand and DER Forecasting

Agenda for September 15th Time Topic 2:30 – 2:35 Introductions Matt Robison (ICF) 2:35 – 3:55 Demand and DER Forecasting & Q/A Mark Domino (National Grid) and Mike DeMatteo (National Grid) Timothy Duffy (NYISO) Laura Manz (ICF) 3:55 – 4:55 Cybersecurity and Privacy & Q/A Mikhail Falkovich (Con Edison / O&R) Kenya Jackmon (ICF) and Scott Graves (ICF) 4:55 – 5:00 Wrap-up

Distribution System Planning Demand & DER Forecasting Laura Manz (ICF) Mark Domino (National Grid) & Mike DeMatteo (National Grid)

Demand & DER Forecasting Charter Purpose: Explore common ground in approaches regarding the evolution in planning the distribution system in New York as Distributed Energy Resource (DER) penetration increases and as the market evolves while meeting customers’ needs and complying with the DSIP Guidance Order Topics and Scope: Demand & DER Forecasting The Importance of Demand & DER Forecasting to the Planning Process Discuss how load forecasts can support the planning process Discuss the need for incorporating the probabilistic methods and applying more granular/bottom-up approaches in demand/DER forecasting Utility Current Forecasting Practices Discuss the different approaches currently used by Joint Utilities in forecasting DER Growth Forecasts Discuss the evolution to more granular DER growth forecasts Discuss the impact of DER growth in load forecasts and planning Incorporation of DER developer data Coordination with NYISO in Demand & DER forecasting

Demand & DER Forecasting is Essential to Utility Planning Process Developing accurate demand & DER forecasts is critical for the identification of system needs during load flow analysis and decisions to be made during the planning process. Historically, utilities have relied on top-down and deterministic approaches in projecting transmission and distribution (T&D) loads, which have been an effective and efficient tool for planning purposes and will continue to be a valuable element in future planning processes. As the penetration of DER continues to grow, there is a greater need to complement these historical top-down forecasts with more granular, bottom-up forecasts. The development of bottom-up and probabilistic approaches for forecasting both demand and DER output will enable more accurate representation of the system in all levels of load flow models to help planners understand when and where constraints may emerge as DER penetration increases.

Current State of Demand & DER Forecasting There is a broad diversity in the approaches and pace that individual companies are taking with respect to the development of demand & DER forecasts. Most companies have conducted demand forecasts down to sub-station level and for some, the top-down approach continues to be the most cost effective way of meeting system and customer needs. Current penetration levels of DER have already caused impacts on load growth for some utilities. Efforts have begun to develop more granular DER forecasts that predict customer activities, behaviors and decisions and integrate bottom-up approaches into planning. Each company has developed their own roadmap for forecasting and the diversity in approaches. Reflecting the differences in individual company’s system design, DER penetration level and monitoring information etc.

DER Growth Forecasts DER growth forecasts should reflect technology advances, policy guidance, market environment, and how customer profiles influence the adoption of DERs. At low penetration rates, the impact of DER growth can be adequately represented through load modifiers, but as larger quantities are integrated, these technologies should be explicitly forecasted in order to accurately account for the increased uncertainties presented by the characteristics of each DER technology type and its impact on the system. The granularity of the DER growth forecasts and the need for detailed, bottom-up approaches will depend on a set of utility-specific factors: Each utility’s distribution system design System information and modeling capabilities DER penetration The internal development roadmap for forecasting, including improved tools, methodologies and data resources

DER Growth Forecasts Impact of DER growth in load forecasts and planning Increased penetration of DER will create both locational and aggregate impacts on the system, making it increasingly important for planners to understand the impacts of DER on a granular, circuit level, and then build on the analysis to determine the aggregate impacts on the system presented by these technologies. As new DER types gain a foothold in the marketplace, their deployment should be reflected in a utility’s forecast and their impact on peak loading and energy forecasts should be evaluated by technology and penetration level. Additionally, as these DER growth forecasts become more fully integrated into load forecasts, advanced modeling tools using probabilistic methods will be leveraged to assess the impact of DERs on load factor, load profile, system efficiency, and other relevant metrics. Incorporation of DER developer data To the extent that it is available, data inputs from DER developers and other stakeholders may be considered as an additional input to the development of DER growth forecasts. Future stakeholder engagement will inform decisions about potential development of more defined processes for collecting and incorporating developer data.

Coordination with NYISO Forecasts Coordination between utilities and the NYISO has already been occurring on long- term demand forecasts as well as the evaluation of the impacts of energy efficiency, demand response, PV and other renewables on peak demand and energy forecasts. Future coordination between NYISO and utilities on demand & DER forecasting will be expanded through both existing and new channels, which will help maintain the collaboration with regard to forecasting approaches and better reflect the impact of DER on load growth in NYISO’s zonal forecasts and its related planning process.

Demand and DER Forecasting Q & A Timothy Duffy (NYISO) Mark Domino (National Grid) Mike DeMatteo (National Grid) Laura Manz ( ICF)

Thank you for joining us! Please contact info@jointutilitiesofny.org or visit our website www.jointutilitiesofny.org for more information