Shaft Replacement Standard Operating Procedure

Slides:



Advertisements
Similar presentations
From the Box to Packing in 30 minutes Pack-in-a-Box components Remove components and assemble bracket as shown Follow the instructions to pack your first.
Advertisements

Build Your Own Future RC2 Serviceability. Build Your Own Future Safety and Ground Rules Before servicing, always remove A/C power from the unit and disconnect.
Zebra® 105SL™ * Removing and Installing Printhead
1 Stripe 400/600 Removing and Installing Printhead Printhead Resistance Calibration Toggle Position Adjustment.
Stable Rise – Fixed Bracket / Stationary Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
Servicing Welch DRYFAST ULTRA Pump Models 2032
Optical Manufacturing Solutions 1 Probe Assembly.
ZIPP 404 BEARING REPLACMENT GUIDE Tools Needed:
Yamaha oil pump rebuild
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
Digital StarLab Set-Up, Operation, Maintenance, and Teacher Manual for the Digital StarLab are in the links below or on the training tab in the BlackBoard.
MyLock 644D Service Seminar.
Engine Removal and Disassembly
Model 12 Intek Horizontal OHV
Step 12 Here is the issue…..the mount for the throttle arm is pushed up against the side of the housing. The problem with this is it allows (due to alignment)
Typical Walk-in Closet with elfa® décor
Memory Craft Feed Dog Drop Step Motor Adjustments.
Stable Rise –Pull and Swivel Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
1 Zebra 170 XiIII Plus Removing and Installing Printhead Calibrating Head Resistance Print Quality Adjustments.
860 21/2”-10”. Modification Overview  Production of the 2½” – 10 sizes began in  Lead free version (LF860) was introduced in Parts do not.
Removal of Radiance Neph Disable the humidifier power remove water reservoir at top of neph disconnect power, computer and sensor cables disconnect and.
1 InnoSys Quick Connect End Effecter Service and Maintenance Procedures Nov. 19, 2007 Rev. B.
1 © 2011 Profile Recorder for ProtoFlow S Installation Instruction.
Service Seminar Memory Craft Table of Contents MC10001 Top Cover Removal…………………………………………………………………..…………1 Belt Cover Removal……………………………………………………………..……………2-4.
Service Seminar Model MB4.
TP4-ENERSOL-TD/PV double function
Small Engine Reassembly Briggs & Stratton OHV
4100 HP Maintenance Kit Enter
MC11000 Kit Replacement 1 1. Open the face plate and remove the 2 screws. Remove and discard the original face plate. 3. Remove the 2 white caps on the.
Service Seminar Memory Craft Removing the Face Plate 1. Open the face plate. 2. Remove the 2 screws and remove the face plate. 1.
994 2½ ”- 10”. Modification Overview  Production for the 994 began in 1999 and is current.
Sockets, Ratchets, and Impacts Speed Wrench - Available in 1/4”, 3/8”, 1/2” Drives.
Clearing Procedures. DISASSEMBLY Major Groups Barrel Group Turn the cover latch and raise the cover group Grasp the retracting slide handle with the.
Automotive Brake Systems, 5/e By James D. Halderman Copyright © 2010, 2008, 2004, 2000, 1995 Pearson Education, Inc., Upper Saddle River, NJ All.
957RPDA, 957N RPDA, 957Z RPDA 21/2”-10”. Modification Overview  Production began in 2002 and is current.  Early versions used a ¾” Flomatic RPZE for.
CLM Maintenance. Covers : 1 - Side cover, 2 - Back cover, 3 Top cover, 4 - Lamp door, 5 - Side cover input and communication side, 6 - HEPA dust filter,
Service Manual. Cubi Overview The service manual instructs the installing and removing the mSATA, memory card, Wifi card and 2.5 inch HDD.
LF866 2½”-10”. Product Overview  Production of the 2½” – 10” sizes began in  The LF866 utilizes a Type 2 bypass (Model LF619 single check).
LAB #10. Governor Control Arm Using a 10mm socket install the two bolts that hold the governor control arm. Finger tighten then torque to 100 “#
Engine Reassembly Technicians need to take their time when reassembling an engine. This is not a race! Listen for instruction when to add the next piece.
Model 12 Intek Horizontal OHV
1 InnoSys Quick Connect End Effecter Service and Maintenance Procedures Shreveport Assembly 14 MAY, 2008.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
Description of Hand Tools Tools help us do work and make things. Tools.
VIEW SERIES with Sliding Door
9 HAND TOOLS.
PostBase Automatic Feeder Component Removal Service Training
Scorpion is a remote tester specifically designed for testing ASD systems. Scorpion is compatible with the FAAST aspirating smoke detector. It is particularly.
Annex 4 - Moving Frame and Whiffletree assembly
Assembly Instructions:
Easy centering and setting system
Bilge Pump Service Project Model Service Kit
826YD 21/2”-10”.
Tool removed during cycle Fault #2
Soxhlet Unit B Maintenance By: Shawna Brookes.
Servicing the Steering System
Most Effective Procedures to Repair a Brake Booster.
Garage Door Repair - Some Useful Tips
T400 Motor Replacement.
830, 831 4”- 6”.
1 SCREWDRIVERS 3. PROPER USE OF HAND TOOLS B A
Disassembly and Assembly of A900C-W Electronic Governor Actuator for P8 Fuel Injection Pump
957RPDA, 957N RPDA, 957Z RPDA 21/2”-10”.
M500, M500N, M500Z 21/2”-10”.
1/17/2019.
880V 21/2”-10”.
C400, C400N, C400Z 21/2”-10”.
4000CIV 21/2”-10”.
M400, M400N, M400Z 21/2”-10”.
Presentation transcript:

Shaft Replacement Standard Operating Procedure

Disconnect EMAs X Axis EMA Y Axis Tools Needed: Snap Ring Pliers, Computer, EMA Software Step 1: Remove pin ring from EMA clevis and load cell If using new joint: Just retract EMA with the software. Y Axis Tools Needed: 7/8 wrench, Computer, EMA Software Step 1: Remove pin from EMA clevis and load cell Step 2: Retract EMA using the software

Moving EMAs Flip Breaker to turn on power to EMA controllers Plug in cables to EMA-1 Open Moog GUI Go to motion tab and change position Click download pointing arrow in top left to download setup to the controller Open NI MAX Reset the USB-6216 DAQ device Set analog channel output to zero along with its minimum

Moving EMAs 2 Plug in serial cable to EMA-2 (Repeat previous slide steps) Open Moog GUI and select “Use current model” (883-045) Go to motion tab and change position Click download pointing arrow in top left to download setup to the controller Open NI MAX Reset the USB-6216 DAQ device Set analog channel output to zero along with its minimum

Outlet Flow Inlet Removal Tools Needed: Adjustable wrench, bucket Step1: Using adjustable wrench, unscrew oil inlet hose, pour excess oil into bucket. Step 2: Remove oil inlet adapter from bearing housing using the adjustable wrench

LVDT and The Tools needed: 3/8 allen key, 3/4 wrench Step 1: Removal thermocouple from housing by hand. Step 2: Remove LVDT’s from LVDT fixture Step 3: Using the 3/8 Allen key and 3/4 wrench, unscrew the LVDT fixture from the rig

Oil Outlet Removal Tools needed: 7/8 wrench, bucket Step 1: Using the adjustable wrench, unscrew all outlet hoses, pour excess oil into bucket

Remove the Encoder Tools needed: 3/32 Allen key, flathead screwdriver Step 1: Using the flathead screwdriver, unscrew the encoder from the table Step 2: Using the Allen key, unscrew the setscrews in the encoder, releasing it from the journal

Remove the V-Belt and the Pulley Tools needed: 5/32 Allen key Step 1: Remove v-belt safety cover from top of table Step 2: Using the Allen key, unscrew the setscrew holding the V-belt pulley to the journal Step 3: Pull back on the pulley to stretch the V-belt and simultaneously pull off the journal Step 4: Set belt and pulley off to the side

Remove Pillow Bearing Tops Tools needed: 9/16 Socket, Ratchet Step 1: Using the socket and ratchet, loosen pillow block bearing bolts Step 2: Finish unscrewing the bolts by hand

Remove Load Cells Tools Needed: Adjustable wrench Step 1: Using the adjustable wrench, loosen load cell, unscrew the rest by hand to avoid tangling the wires. Step 2: Preferably with a partner, pick up and rotate housing so Y-load cell is now rotated 90 degrees. Step 3: Using wrench, remove the Y-load cell

Remove Journal From Housing Tools needed: 3/16 Allen key Step 1: Using Allen key, loosen set screws Step 2: Remove busing insert by pulling it away from the housing Step 3: Slowly remove the journal from the bearing housing.

Replace Journal Shaft

Installing the Journal ********** Tools needed: Oil Step 1: Lubricate the journal shaft Step 2: Check to make sure you are installing from the CORRECT SIDE. Step 3: Insert shaft until it comes close to the other side. You should be able to support it from the other side Step 4: Holding the journal shaft from both ends, twist it until you feel that it is centered with the journal bearing and push it the rest of the way into the housing.

Installing the Bushing Insert Tools needed: Oil and 3/16 Allen Key Step 1: Lubricate the journal and bearing insert. Step 2: Check orientation of flat spots in the journal and orient the insert accordingly. Step 3: Use the Allen key to tighten set screws, fixing the bearing insert to the journal.

Install Load Cells Tools Needed: Adjustable wrench Step 1: Locate the correct orientation for installment Step 2: Hand tighten the X-load cell Step 3: With help, rotate the housing to access the Y-load cell, and using the wrench, tighten the Y-mount Step 4: Ensure the load cells are in the correct orientation for connection to EMAs

Reinstall Oil Hoses Tools needed: 7/8 wrench, adjustable wrench, bucket Step 1: Install oil inlet adapter Step 2: Screw on oil inlet hose first Step 3: Screw on both outlet hoses last

Install Sensors and V-Belt Tools needed: 5/32, 3/32, 3/8 Allen key, 3/4 wrench and flat head Step 1: Place thermocouple in oil outlet adapter Step 2: Place encoder on journal Using the flat head screwdriver, screw in until washing has firmly pressed bracket to the sheet metal Using the 3/32 Allen key, tighten the set screws Step 3: Place pulley on the journal Locate the flat of the journal Orient V-belt pulley so set screw is in line with the journal’s flat Using the 5/32 Allen key, tighten set screw Step 4: replace LVDTs Place mount so bottom tip is against the table top Use 3/8 Allen key and the 3/4 wrench to tighten the mount against the table Place the LVDTs back in the slots but them from touching the housing until after the EMAs are hooked up. Tighten LVDTs down with 4-40 screws

Connect EMAs to the Housing Tools needed: Computer, EMA software Step 1: Flip the breaker to turn on the power to the EMA controllers Step 2: Plug in serial cable to EMA-1 Step 3: Open up Moog GUI and select “use current model” (883-045) Reset fault Step 5: Open NI MAX Reset the USB-6216 DAQ device. Open test panel Set analog output channel zero min to 0 and the max to 10V Divide the starting position by max length and multiply by 10 Use this voltage to move EMA to original position Adjust voltage incrementally until the rod end and clevis line up Step 6: Unplug power chord to EMA Step 7: Place pin and replace snap ring

Connect the EMAs to the Housing Step 1: Plug in serial cable to EMA-2 Step 2: Open up Moog GUI and select “use current model” (883-045) Rest fault Step 3: Plug in the EMA power cord Reset the USB-6216 DAQ device Step 4: Open the NI MAX Reset the USB-6216 DAQ device. Open test panel Set analog output channel zero min to 0 and the max to 10V Divide the starting position by max length and multiply by 10 Use this voltage to move EMA to original position Adjust voltage incrementally until the rod end and clevis line up Step 5: Unplug power cord to EMA Step 6: Place pin and hand tighten nut

Connect EMAs to the Housing Step 1: Plug in serial cable to the EMA-1 Step 2: Open up MOOG GUI and select “Use Current Model” (883-045) Reset fault Go to motion tab and change to open loop force Click downward pointing arrow in top left to download setup to the controller Step 3: Plug in serial cable to the EMA-2 Step 4: Open up MOOG GUI and select “Use Current Model” (883-045)