CERN Giovanna Lehmann, Xavier Pons

Slides:



Advertisements
Similar presentations
1 S. Lusin, LV Cabling, CERN 06 Apr 06 LV Cabling 06 Apr 06 S. Lusin Fermilab / CERN Cabling from USC to UXC, Power Distribution.
Advertisements

NetSure™ RDB Series.
André Augustinus 16 June 2003 DCS Workshop Safety.
SGI Confidential Copan 400 Installation. SGI Confidential Installation Overview The approximate minimum time to complete this procedure is.
Power distribution box XD1 top DTTF_Crate XD2 middle DTTF_Crate XD3 bottom DTTF_Crate Connection to DTTF_Crate through cable USE H07 ZZ-F 3G1,5 RACK S1D01.
© 2011 Ericson Manufacturing, Willoughby, Ohio
1 Fiber Optics FIBER OPTIC PATCH PANELS. 2 Fiber Optics Just like our copper cable plant the fiber cable plant incorporates many of the same hardware.
1 Modular DC/DC Converter. 2 PSC W Standard 19“ rack 4U – 6 prewired slots (single DC input/output connection for each unit)
CLIQ power supply Integration. General view: -Schroff rack 19’’ 25U (500mm x 600mm x 1120mm). -2 fixed wheels +2 castor wheels with brake ⦰100mm.
DESIGN OF THE HATCH OF THE INSTRUMENT BOOTH OF EUSO-BALLOON version v1.2 Writer : SYLVIE DAGORET- CAMPAGNE Final tests and Health tests1
A* candidate for the power supply Wiener MPOD-LV crate w/ remote control only (except for local on/off switch) Type “EC LV” Front or rear connections (reverse.
Arctic Control Introduction V 1.0. Arctic Control The Arctic Control is a device with integrated wireless communications for controlling medium-voltage.
System Elements HighPoint Broadband Delivery System Sector 1 Sector 3
DKTCOMEGA EDFA Product Line Jesper Broszka, Product Manager.
POWER PLANT USED IN TELECOM
P. 1Mario Deile – TOTEMino: Infrastructure Status and Schedule Mario Deile Zone 2.Gas system 3.Cabling 4.Cooling water 5.Counting-Room 6.Safety.
Control System and Electrical Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Controls and Electrical Preferred Technologies Steve Pavis PH-DT-DI CERN Advel Power Supplies and ABB Circuit Breakers.
SGI Confidential Power Bay. SGI Confidential Power Bay Front View AC OK LED DC OK LED Alarm LED Release Latch Power Bay 1 Power Bay 0 Power.
Organization of cabling information Creating a Medaustron Cable Database 1 That’s what we don’t want!! MACS 28/06/2011 Sebastien Pelletier Cabling Database.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Goals: - To get experience in assembling MWPC on the Wall and prevent possible problems; - To check functionality and stability of different chambers at.
1/12/2010 R. CIARANFI 1 NEW NINO BOARD FOR RICH OLD AND NEW LOGISTIC NEW BOARD DESCRIPTION NEW MODULARITY 32 CH NEW FORM FACTOR FRONT END AREA AND DAQ.
EeePC – Ubuntu Running pvMon USB cable Phidget I/O Controller Photovoltaic panel Power/System Connections I V PV charger Cont. Phidget I/O Controller +12.
Sageon Power Module Distribution Sageon Rack Trim Pieces.
Ethernet I/O Set-Up This presentation will step through a typical configuration of the CON-DVT-IOE. Intellect 1.5 is used for the software portion. NEXT.
New product introduction:
Ethernet I/O Set-Up This presentation will step through a typical configuration of the DVT CON-IOE. Intellect 1.0 is used for the software portion.
Assumptions: Cockcroft-Walton photomultiplier bases are the same for all ECAL sections Digital to analog converters are installed on the distribution boards.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
1 13 Octobre 2011 Laurent Roy ATCA Crate / Infrastructure in place -Rack in D3: dimension -Electrical power availability -Tell1 racks running in D3 (air.
André Augustinus 13 June 2005 User Requirements, interlocks, cabling, racks, etc. Some remarks.
PROPRIETARY INFORMATION - © 2015 WOODWARD, INC. PAGE 1 HighPROTEC-2 MRI4-2 Feeder Relay Sales presentation 2015/08/10.
HighPROTEC-2 MRA4-2 Directional Feeder Relay Sales presentation
VARITECTOR SPC Signal Pluggable Connection Surge Protection for Control and Instrument.
Door Controller Device. 2 Door Controller Device (DCD) The DCD is the “Remote Brains” of the system. It is the controller device located at each access.
FTK crates, power supplies and cooling issues 13/03/20131FTK-IAPP workshop - A. Lanza  Racks, crates and PS: requirements  Wiener crates  Rittal crates.
MARCO control system Munich Lukasz Zwalinski – PH/DT Maciej Ostrega – PH/DT.
Power Supply. 2 Power Supply w/Line Conditioner The power supply is the heart of the Millenium System. It can support between 15 DCD boards (power for.
Zelio Logic - Communication Extension
S A Griffiths CM42 June 2015 Electrical & Control.
A technical proposal for the consolidation of the LHCA cryogenic elec/control system for the HL-LHC era. 07/10/2017 Simon MARTIN Marco PEZZETTI Simon MARTIN.
HighPROTEC-2 MRMV4-2 Motor protection relay with voltage measurement Sales presentation 2015/08/10.
ProtoDUNE SP – Slow control temperature gradient monitor
HighPROTEC-2 MRM4-2 Motor Protection Relay Sales presentation
SPD II 1 for LV Power (AC/DC)
Status of the CERN ATCA specification and tender
Elevator Control Unit.
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
Site Controller Unit and Trunk Interface Unit
FTK infrastructure in USA15 Status and plans for 2015 A
음향 시스템 사양서 POWER SUPLY WITH 3.5 PHOENIX CONNECTOR AMX: PSN6.5
HighPROTEC-2 MCDTV4-2 Transformer Protection with differential Sales presentation 2015/08/10.
HighPROTEC-2 MCA4-2 Directional Feeder Relay Sales presentation
ProtoDUNE SP – Slow control Status
General aspects: Optical links :
ProtoDUNE SP – Slow control temperature readout setup test
Injectors BLM system: PS Ring installation at EYETS
Christian Veelken last updated 11/09/06
T1 Electronic status Conclusions Electronics Cards:
PMT cabling Gian Luca Raselli INFN Pavia
Electrical and electronic systems projects
Robert Gomez-Reino Garrido
Radiation- and Magnet field- Tolerant Power Supply System
HighPROTEC-2 MRDT4-2 Transformer Protection with differential Sales presentation 2015/08/10.
Engineering Project Cable Management.
PLC Hardware Components.
Hardware integration and interfaces
Detailed information FOR INTERNAL USE ONLY! CUBE20.
Presentation transcript:

CERN Giovanna Lehmann, Xavier Pons Standard 19’ rack: 600 mm width, 800 mm deph, 45U Heigh Supplier: ATOS Company Reference supplier: Rack 19’ EVOLUTION 45UL600P800 catalogue reference 1002409 + accessories references: 1002421, 1902097, 1002399, 1003131, 1002979, 1002478 Commercial data from supplier : http://en.atos-racks.com/19-racks-evolution-rack.html Plans and dimensions can be found: http://en.atos-racks.com/cache/documents/content/atos-evolution-g-13-32.pdf

By standard rule we install on top of the rack a 220Vac power supply distribution 3U crate with mains Vac input protection breaker and dedicated breaker protecion for each output or client. The protection by default will be a 10A breaker (other sizes available) Feedback of the breaker status connected to Slow Controls. The line cords for output circuits, or the connection to the 3U 220Vac distribution crate rear side, can be done by CERN Burndy connector standard (see convention below) for 220Vac distribution otherwise terminal block connecting the wires directly by means of screwdriver. 3U 220Vac distribution crate - front view Out Burndy connector 220Vac CERN standard Connecting directly to Terminal block output 3U 220Vac distribution crate - rear view

Yes YES, We want the high levels of the slow control to be on building ground whenever possible. In additional minimal slow control will also be needed for the DAQ racks. A good location for the SC equipment on building ground is probably the same barrack as the DAQ

To discuss with detector integration the final location and label or rack name. To discuss for the final location, when we’ll have a scope of the final devices to be installed.

INFO NOT AVAILABLE. TO DISCUSS WITH INTEGRATION

VDC in?? ??? How? Device interface? 8 HV SHV cables from power supply? 4 HEATERS 10 W/28VDC – Temperature regulation How many 4?, is ON-FF regulation enough? Analogue?

the first question to answer here is whether the PDS community prefers to have those devices on the flange or on the detector racks. Device? Size? Is 220 Vac enough? If the ethernet switch (1 is enough) is located in the detector racks, it could be one of the standard devices provided by CERN IT, e.g. from the ICX 7450 series (http://www.brocade.com/en/backend-content/pdf-page.html?/content/dam/common/documents/content-types/datasheet/brocade-icx-7450-ds.pdf).

??