EUDET France – 05/04/07 – Rémi CORNAT (LPC) 1 CALICE instrumental chain looking (not so) forward to EUDET Overview Wafer characterization Sensor test In.

Slides:



Advertisements
Similar presentations
Vincent Boudry Franck Gastaldi Antoine Matthieu David Decotigny CALICE meeting 19 feb Kyungpook Nat'l U., Daegu, Korea Status of the Data Concentrator.
Advertisements

PXL RDO System Requirements And meeting goals 11/12/2009BNL_CD-1_SENSOR_RDO - LG1.
SKIROC New generation readout chip for ECAL M. Bouchel, J. Fleury, C. de La Taille, G. Martin-Chassard, L. Raux, IN2P3/LAL Orsay J. Lecoq, G. Bohner S.
J-C. BRIENT (LLR) 1  Introduction with pictures  Prototype design and construction  R&D on the design of the full scale calorimeter CALICE - ECAL silicon-tungsten.
Y. Gao & P. Gay FCPPL FEE for ILC Calorimeter Development 1 Front-End-Electronics for ILC Calorimeter Development G. Blanchard, P. Gay,
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
David Bailey Manchester. Summary of Current Activities UK Involvement DAQ for SiW ECAL (and beyond) “Generic” solution using fast serial links STFC (CALICE-UK)
Upgrade developments in Clermont-Ferrand Romeo Bonnefoy and François Vazeille Tilecal upgrade meeting (CERN, 13 June 2014) ● Handling tools ● Deported.
CALICE – 12/07/07 – Rémi CORNAT (LPC) 1 ASU and standalone test setup for ECAL MAIA BEE project Overview DAQ dedicated Sensor test In situ debug and maintenance.
ECAL silicon- tungsten status
Second generation Front-end chip for H-Cal SiPM readout : SPIROC DESY Hamburg – le 13 février 2007 M. Bouchel, F. Dulucq, J. Fleury, C. de La Taille, G.
Tuesday September Cambridge1 GDCC “next replacement of the LDA” Franck GASTALDI.
David Cussans, AIDA/CALICE DAQ Palaiseau, 10 Nov 2011 Trigger/Timing Logic Unit (TLU) for AIDA Beam-Test.
AHCAL – DIF Interface EUDET annual meeting – Paris Oct M. Reinecke.
Bart Hommels Univeristy of Cambridge EUDET Annual Meeting, Ecole Polytechnique, Paris JRA3: DAQ Overview Objectives System Overview Status of.
Rémi CORNAT (IN2P3/LLR) - CALICE electronics meeting - LAL, June 2 nd ECAL electronics Rémi CORNAT LLR (CNRS/IN2P3) -Roadmap -Mechanics -LV Power.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
08/10/2007Julie Prast, LAPP, Annecy1 The DHCAL DIF and the DIF Task Force Julie Prast, LAPP, Annecy.
J. Prast, G. Vouters, Arlington, March 2010 DHCAL DIF Status Julie Prast, Guillaume Vouters 1. Future CCC Use in DHCAL Setup 2. Calice DAQ Firmware Implementation.
EUDET JRA3 ECAL in 2007 : towards “The EUDET module” C. de La Taille IN2P3/LAL Orsay.
1 07/10/07 Forward Vertex Detector Technical Design – Electronics DAQ Readout electronics split into two parts – Near the detector (ROC) – Compresses and.
L.Royer– Calice LLR – Feb Laurent Royer, J. Bonnard, S. Manen, P. Gay LPC Clermont-Ferrand R&D pole MicRhAu dedicated to High.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
Maurice Goodrick, Bart Hommels EUDET Annual Meeting, Ecole Polytechnique, Paris EUDET DAQ and DIF DAQ overview DIF requirements and functionality.
Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)
SKIROC ADC measurements and cyclic ADC LPC Clermont-Ferrand Laurent ROYER, Samuel MANEN Calice/Eudet electronic meeting Orsay June.
European DHCAL development European DHCAL development CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY Status :
Julie Prast, Calice Electronics Meeting at LAL, June 2008 Status of the DHCAL DIF Detector InterFace Board Sébastien Cap, Julie Prast, Guillaume Vouters.
Front-End electronics for Future Linear Collider calorimeters C. de La Taille IN2P3/LAL Orsay On behalf of the CALICE collaboration
ECFA Workshop, Warsaw, June G. Eckerlin Data Acquisition for the ILD G. Eckerlin ILD Meeting ILC ECFA Workshop, Warsaw, June 11 th 2008 DAQ Concept.
Maurice Goodrick, Bart Hommels CALICE-UK Meeting, Cambridge CALICE DAQ Developments DAQ overview DIF functionality and implementation EUDET.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
12/09/2007Julie Prast, LAPP, Annecy1 The DIF Task Force and a focus on the DHCAL DIF Remi Cornat, Bart Hommels, Mathias Reinecke, Julie Prast.
SKIROC status CERN – CALICE/EUDET electronic & DAQ meeting – 22/03/2007 Presented by Julien Fleury.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
News from the 1m 2 GRPC SDHCAL collection of slides from : Ch.Combaret, I.L, H.Mathez, J.Prast, N.Seguin, W.Tromeur, G.Vouters and many others.
FKPPL, Febuary , Rémi Cornat 1 FKPPL technical activities CALICE Si-W ECAL Rémi CORNAT
1 Status Report on ADC LPC Clermont-Ferrand Laurent ROYER, Samuel MANEN Calice/Eudet electronic meeting London 2008.
SKIROC status Calice meeting – Kobe – 10/05/2007.
SiW Electromagnetic Calorimeter - The EUDET Module Calorimeter R&D for the within the CALICE collaboration SiW Electromagnetic Calorimeter - The EUDET.
CALICE ECAL meeting VFE ASIC Next & next to next version 17 Janvier 2006, LAL Orsay.
DHCAL Acquisition with HaRDROC VFE Vincent Boudry LLR – École polytechnique.
14.4. Readout systems for innovative calorimeters
EUDET Elec/DAQ meeting
ECAL front-end electronic status
CALICE DAQ Developments
CALICE meeting 2007 – Prague
ETD meeting Electronic design for the barrel : Front end chip and TDC
T1 Electronic status Conclusions Electronics Cards:
Comments on the DAQv2 advancement
Status of the DHCAL DIF Detector InterFace Board
Test Slab Status CALICE ECAL test slab: what is it all about?
Status of the Data Concentrator Card and the rest of the DAQ
C. de La Taille IN2P3/LAL Orsay
Hall A Compton Electron detector overview
CALICE/EUDET Electronics in 2007
The DHCAL DIF Board For the M2 Prototype
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
prototype PCB for on detector chip integration
UK ECAL Hardware Status
STATUS OF SKIROC and ECAL FE PCB
SKIROC status Calice meeting – Kobe – 10/05/2007.
HaRDROC status: (Hadronic RPC Detector Read Out Chip for DHCAL)
CALICE meeting 2007 – Prague
Tests Front-end card Status
Stéphane Callier, Dominique Cuisy, Julien Fleury
SKIROC status CERN – CALICE/EUDET electronic & DAQ meeting – 22/03/2007 Presented by Julien Fleury.
State of developments on Readout interface of European DHCAL
Front-end Electronics for the LHCb Preshower Rémi CORNAT, Gérard BOHNER, Olivier DESCHAMPS, Jacques LECOQ, Pascal PERRET LPC Clermont-Ferrand.
First thoughts on DIF functionality
Presentation transcript:

EUDET France – 05/04/07 – Rémi CORNAT (LPC) 1 CALICE instrumental chain looking (not so) forward to EUDET Overview Wafer characterization Sensor test In situ debug and maintenance DAQ LPC LAL LLR

EUDET France – 05/04/07 – Rémi CORNAT (LPC) 2 CALICE instrumental chain History Seoul dec. 06 LLR 9 jan. 07 LLR 24 jan. 07 LAL 9 fev. 07 LLR 13 fev. 07 LLR 20 mar. 07 CERN 23 mar. 07 ANR proposal involves LPC, LLR & LAL Jean Claude Brient Jean-Charles Vanel Akli Karar Marc Anduze Julien Fleury Pascal Gay Francois Morissau Rémi Cornat … Sorry for those forgotten

EUDET France – 05/04/07 – Rémi CORNAT (LPC) 3 ECAL Instrumental chain overview from Wafer to data acquisition Detector VFE Read-out DAQ Test bench Wafer Crosstalk studies Design validation ASUDAQ Sensor validation Cosmic tests ISDDAQ Debug, Monitoring Maintainance Analysis Software SW reconstruction Towards EUDET, Validation & Test of the whole chain R&D test tools for sensor and electronics on beam behavior monitoring SKiROC Wafer ASU

EUDET France – 05/04/07 – Rémi CORNAT (LPC) 4 Wafer Unexpected behavior seen during test beam : SQUARE events ! Unmatched pattern according to physics models… Has to be understood and solved

EUDET France – 05/04/07 – Rémi CORNAT (LPC) 5 Wafer Understand Square events origins Crosstalk studies according to design options Effects of a particle hit on guard ring could be propagated to every bordering pixels Try to reproduce the phemenon Test new designs layout technologic improvements As result, select the best design technique…

EUDET France – 05/04/07 – Rémi CORNAT (LPC) 6 Wafer Setup and tools Simulation capacitive coupling guard ring layout PCB for test electronics Test bench pulse generator micropositioner & probes shaper + scope Characterization Charge injection pixel signal analysis Wafer XYZ table Needles accessible area Supporting PCB I(V) / C(V) ? CAD verified OPEN QUESTION

EUDET France – 05/04/07 – Rémi CORNAT (LPC) 7 Wafer short term actions Simulation –Software know-how & test case (first try on 10th of april) –Need to know what to simulate Mechanical compatibility test –Probe system vs wafer dimensions PCB design –Connector –Charge injector –Shaper Interaction with manufacturer –Layout options –Common wafer floorplan CAD verified OK Proposal J-C. V. OPEN QUESTION

EUDET France – 05/04/07 – Rémi CORNAT (LPC) 8 ASUDAQ Cosmic test of ASU ASUDAQ PC USB Active Sensor Unit Features full slow control including internal probing system control access to analog test points (embedded ADC) read out of 4 SKiROC through USB & PC cosmic bench environment support (triggers) mechanical jaw providing damageless contacts to ASU Cosmic test bench for ASU characterization. First R&D step towards EUDET production tests

EUDET France – 05/04/07 – Rémi CORNAT (LPC) 9 ASUDAQ first attempt of an architecture USB PC slow control ADC data probe Read out interface jaw TRIG Simple design based on FPGA USB interface for PC ADC for VFE internal probing system needs probe signal on ASU connector Trigger and timing signals for cosmic test bench read-out Mechanical interface ? Connectors for 1-4 ASU can be foreseen Software tasks to be specified OPEN QUESTION

EUDET France – 05/04/07 – Rémi CORNAT (LPC) 10 ASUDAQ short term actions Collect informations –ASU I/O connector specs –VFE documentation Understand current design First HDL simulation –Reuse of existing code (SKiROC & HaRDROC) Define cosmic test bench

EUDET France – 05/04/07 – Rémi CORNAT (LPC) 11 USB issue USB is in use at LPC since Q1’04 featuring FTDI245BM chip Prototyping board exists for very first developments (FPGA based) Heavily used on –L0 trigger decision unit of LHCb –Spare slow control of LHCb preshower front end board –ADC test bench at LPC Will further evolve to version 2 (student project since 2004) for both firmware and software USB LVDS I/O VME / TTL I/O SPARE Data throughput limits of FTDI 150 ns cyle time and 2kB FIFO  6 MB during 400 µs  slow software (?)

EUDET France – 05/04/07 – Rémi CORNAT (LPC) 12 InSituDebugDAQ concept Standard DAQ Special link DebugDAQ Dedicated PC On beam simplified DAQ devoted to monitor and debug a few SLABs chip radiation tolerance accurate diagnostic of unexpected behavior monitoring (internal probes) maintenance Can run alone, eventually with no beam compatible with machine interface or specific trigger and timing Dedicated Software aimed to ease debugging Needs DIF (already glued to SLAB) Machine Interface Or Stand alone CCC Simultaneous DAQ operations allowed

EUDET France – 05/04/07 – Rémi CORNAT (LPC) 13 InSituDebugDAQ architecture options ISSD as an interface between DIF and a PC by replacing the standard DAQ system ISSD as an interface between DIF and a PC in parallel to DAQ ISSD connected to the standard concentrator (LDA) But no access to VFE internal probing (analogue) Bypass standard CCC if needed Additional connector and firmware upgrades Flexibility and cabling X

EUDET France – 05/04/07 – Rémi CORNAT (LPC) 14 DAQ vs DIF (idea) TRIG DIF is a light ASUDAQ, ASUDAQ is a DIF with extended features slow control of internal probes ADC for probe output (might be integrated into VFE ?) probe data read-out (additional or separate flow) dedicated software modules ISDDAQ is a DIF with extended features and direct read-out Hard/firm/software developments for ASUDAQ & ISDDAQ are Very similar as for DIF CCC additionnal signals for users defined trigger (cosmic, no beam, …) Alternative Slow control access Mechanical interface to ASU (ASUDAQ)  (e)xtendedDIF concept ASU ISD

EUDET France – 05/04/07 – Rémi CORNAT (LPC) 15 eDIF proposal first attempt architecture eDIF is a DIF including optional ASUDAQ features Unwanted components may not be soldered USB may be deported using the test connector foreseen on DIF or on LDA Additional CCC signal through debug con. The event builder add probe data into data flow as coming from ghost SkiROC (combined data flow mode) Provides two slow control access Basic DAQ through USB (ASUDAQ) Fully compliant with LDA (DebugDAQ) Transparent mode (standard DAQ) LDA interface USB PC slow control ADC data probe Event builder CCC

EUDET France – 05/04/07 – Rémi CORNAT (LPC) 16 InSituDebugDAQ architecture proposal eDIF LDA SLAB ODR TRIG ISDDAQ PC Then it needs (e)xtended LDA… (CCC multiplexing) or custom interface board (serial LVDS to NI DAQ) Carte DAQ NI PCI-7811R ? FPGA based, 160 I/O to PCI buffer flush mode (continuous streaming to PC) ? Direct connection to LDA would avoid risky cabling operations and highest flexibility eDIF is needed for VFE probes and mixed data flow mode (probe+DAQ) Software tools Light LDA for early devlopments OPEN QUESTION

EUDET France – 05/04/07 – Rémi CORNAT (LPC) 17 load_ecs 1 bit error correction 2 bits error detection 30 bits word (for ex.) –24 data bits (2x12) –5 redundancy bits –1 global parity bit On the flow Encoding/decoding (DAQ) Shared among slow control registers Heavily used –Final design of LHCb preshower –CMOS chip HDL ready Hamming coding secure data transfer OPEN QUESTION

EUDET France – 05/04/07 – Rémi CORNAT (LPC) 18 Conclusion ASUDAQ and ISDDAQ need analogue signals of internal probing system to be connected to DIF eDIF concept architecture choice Combined data flow mode Additional features to today SLAB and DAQ Wafer test bench being set up PCB specifications Keithley choice Shaper SILVACO simulation tools Hamming coding of data could secure data transfer and configuration data ASUDAQ first developments on prototyping board ASU connector issue ISDDAQ architecture issue Internal probes Simultaneous DAQ Flexibility Actions on the whole chain to make EUDET a success R&D on wafer Validation, debugging and maintenance tools

EUDET France – 05/04/07 – Rémi CORNAT (LPC) 19 MAIA BEE (Y) M aintenance A pparatus I ncluding (data) A cquisition (on) B eam (for) E UDET E CAL Private joke

EUDET France – 05/04/07 – Rémi CORNAT (LPC) 20 CALICE instrumental chain looking (not so) forward to EUDET Overview Wafer characterization Sensor test In situ debug and maintenance DAQ ILC LPC Clermont-Ferrand