Miscellaneous about Target Spectrometer PANDA Mechanics Meeting, September 2015 J. Lühning, GSI Space around Barrel Target Platform Cable Routing.

Slides:



Advertisements
Similar presentations
PANDA Mechanical Workshop Backward Endcap Calorimeter Geometry David Rodríguez Piñeiro GSI Darmstadt PANDA Mechanical Workshop GSI
Advertisements

HIE-ISOLDE HEBT: characteristics Beamline diameter: 40 mm (REX: 100 mm) Beamline height: 1.75 m Beamline vacuum: low 1e-7- high 1e-8 mbar Connection of.
TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
Computer Integrated Manufacturing CIM
Guenther Rosner FAIR Design Study, PANDA 3, GSI, 19/1/06 1 PANDA3: Magnet design and integration of detectors Tasks & participants Progress Milestones.
Concept for the New Detector Chamber at the ESR Ion beam Internal Target Region  Lab *)  Flange axis Covered  range Flange size in mm A90° – 80°83°95°
DH in Hybrid-A and ILD 2014/9/5 Yasuhiro Sugimoto 1.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
1 E906 Pre-Amplifier Card 2009/10/07. 2 E906 Wire Chambers Station1 MWPC: –build a new E906 MWPC. –4500 channels in total. Station2 DC: –recycle old E866.
Notes After TIG 17/7/08 HF+ Move out of garage: Aug 15* Platform+table+collars+racks+BP support (jack up for platform) = 3 days Controls for motors = 1.
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
4366-ILD-T-Platform-and-environment.ppt A. Hervé Seoul workshop 17 February 2009 Concept of Platform and Environment A. Hervé / ILD-Webex meeting.
18 June 20031Integration Review B. Schmidt Outline: Overview of the support structures Requirements –Some details on electronics, cabling and piping Constraints.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
Routing of Cables and Tubes at the Target Spectrometer PANDA Mechanics Workshop, April 2015 J. Lühning, GSI Routing at the barrel.
Meeting at Chooz PMTs Mechanical support on the Buffer. Updates. Enrique Calvo Alamillo
Vacuum conditions in PANDA pbar-line Alexander Gruber, SMI, Vienna, Austria.
Joint Institute for Nuclear Research Status of the magnet for the PANDA Target Spectrometer Report from Dubna A.Efremov, E.Koshurnikov, Yu.Lobanov, A.Makarov,
12 July 2007IRENG07 WG-A M. Breidenbach1 SiD Concept SiD is relatively modest in scale compared to the LHC detectors, and comparable to SLD: Tracker Radius.
Page 1 GSI, Hydraulic Actuators for PANDA Target Spectrometer Jost Lühning, GSI Darmstadt Functional Specifications for moving the TS: Two synchronous.
Status of the Yoke Interfaces Presented by Evgeny Koshurnikov February 2013.
PANDA Yoke unsolved Interface problems Presented by E. Koshurnikov (Dubna) December 9, 2011, GSI.
Final Concept Lead Filter Movement System Dennis Haasler EN-MEF-EBE.
/ 11 Updates of PANDA 3D Model CM June 2016 at GSI, MEC Session J. Lühning, GSI Updates for: Panda Hall Target Spectrometer Latest version.
Status of the PANDA Magnet Yoke Presented by E. Koshurnikov GSI, June 26, 2013.
SECTION 8 - RACKING (BRACING) AND SHEAR FORCES STUDENT HANDOUT
Octobre LAL Orsay Report from the IRENG07 workshop at SLAC W. Lohmann, DESY from Septembre 17 – 21, ~ 100 participants - plenary and parallel sessions.
G. GIRAUDO - D. ORECCHINI Beam-Target line for PANDA – GSI – 4 February 2013 Beam-Target line for PANDA – GSI – 4 February 2013 Central Trackers assembly.
Kitakami Side AHCAL Assembly or anywhere in any detector.
Miscellaneous MEC Topics Mainz, CM September 2016, MEC Session J
Status of the forward tracker design
Roller/rail - System for PANDA
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
CBM magnet overview of the BINP work
Some Updates on Mechanics CM-MEC Session Dec J. Lühning, GSI
Miscellaneous Topics MEC Session, CM March 2017 at GSI J. Lühning, GSI
STRAW TRACKER SYSTEM CAD STATUS :
Platform for moving and positioning Target Spectrometer on the floor
Schedule CM SPS G.Vandoni.
Platform Design for the Target Spectrometer using Heavy-Weight Rollers J. Lühning, GSI Darmstadt, Three design goals for Platform: Low construction.
Target Spectrometer Updates CM-MEC Session Giessen, March 2015 J
Solenoid Yoke Door-Barrel Connection
Update of MVD services and requests
Beam
Computer Integrated Manufacturing CIM
Experimental hall design in Japanese site
- CT INSTALLATION PROCEDURE OVERVIEW -
Present status of the flux return yoke design
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Dubna/JINR Status & Plans
PANDA Yoke of the Magnet
Physics Support Materials Higher Mechanics and Properties of Matter
Layout of Detectors for CLIC
David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting Turin EMC BW Endcap.
Central Tracker Support Frame MEC Session, CM June 2017 at GSI J
Platform for Target Spectrometer using linear montion drive Rexroth
IHEP group Shashlyk activity towards TDR
Status of the PANDA Magnet
Integration – preliminary ideas on routing and tests
Actual Dimensions in the Forward Spectrometer
EMC BWE PANDA Insertion
ATLAS ITk CO₂ Cooling pipe routing CO₂ Meeting, 28 June 2016
ATLAS ITk CO₂ Cooling pipe routing Common Mechanics meeting
HPL DG d=1.4mm/e= mm.
1. In many reinforced concrete structures and particularly in floor systems, a concrete slab is cast monolithically with and, connected to, rectangular.
Hall C Down Stream Beam Pipe And Dump Interface Design
Volume SWBAT Find the Volume of a Right Rectangular Prism by Applying the Appropriate Formula.
Detector hall in mountain regions
CLEO II Magnet in Hall A for SoLID
Presentation transcript:

Miscellaneous about Target Spectrometer PANDA Mechanics Meeting, September 2015 J. Lühning, GSI Space around Barrel Target Platform Cable Routing and Cable Ducts on Downstream Side Forward Endcap Mounting Platform for Mounting Detectors from Upstream Side 3D-PDF files available here: page 1 of 8

Space around Barrel Space below barrel: target dump and supply festoon (cable chain) Space on eastern and western side of barrel: available height ~4.6 m, sufficient for 1 storey of 42U-racks and 1 storey of 47U-racks Space on top of barrel: target, pumping station, cryo-box, and maybe some racks. space at 45° parts of barrel octagon reserved for muon crates 4.6 m page 2 of 8

Target Platform cryo-box gangway, fixed to upstream door target pumping station floor height above beam 2.8 m available height limited by cave aperture (5.1 m above beam) page 3 of 8

Cable Routing and Cable Ducts on Downstream Side page 4 of 8 denotation of cable duct positions NNE ENE ESE SSE The width of each cable duct is 42 cm. If designed as proposed in the Muon TDR the depth increases from 14 cm to 28 cm (going outwards), so the “bottleneck” cross section of each duct is 42×14 cm². Muon counters require 423 cm² in each duct, thereof 37% (158 cm²) in the “bottleneck” cross section? muon supplies The most critical space is in duct “ENE”. There the FE-EMC needs 477 cm². Expressing this value in duct depth (divided by duct width 42 cm) this is 11.4 cm. This does probably not fit (if the depth needed by muon supplies in the bottleneck is 158 cm² / 42 cm = 3.8 cm) bottleneck depth 14 cm

Forward endcap mounting end of stage at 5.3 m, distance to Fw-Tr-5 when rolled out of cave is 0.8 m 7.2 tons, c-o-g at z= 215 cm ? page 5 of 8 connection of FE-EMC to trolley ? trolley can be moved downstream by 1.6 m, strength was calculated with FEM

Forward endcap mounting 10.3 tons 7.2 tons page 6 of tons The trolley rests on 4 rollers. The z-coordinate of the centre-of-gravity of the FE-EMC is not between the 4 rollers, so two of the rollers have to bear a big pressure while the other two experience a moderate tension.

Forward endcap mounting part of Fw-Tr-5 page 7 of 8 trolley for FE-EMC trestle for barrel-EMC mounting stage can be used both for barrel-EMC and for FE-EMC

Platform for Mounting Detectors from Upstream Side 5.8 m page 8 of m 10 m barrel-EMC STT & MVD BE-EMC