MICE CM34 Wrap-up Alain Blondel 1 CM 34 wrap-up TOWARDS CM35.

Slides:



Advertisements
Similar presentations
The US 5 Year Muon Acceleration R&D Program To Boldly Go… MICE Collaboration Meeting Harbin January, 2009.
Advertisements

Changing the absorbers: how does it fit in the MICE experimental programme? Besides the requirement that the amount of multiple scattering material be.
CHIPP Sept 2005Jean-Sébastien GraulichSlide 1 What is MICE  Muon Ionisation Cooling Experiment  What is Ionisation Cooling ? Cooling = Reduction of Beam.
1Malcolm Ellis - Video Conference - 7th December 2006 Data Challenge Report  Disclaimer  Data Challenge definition(s)  Software status u G4MICE u GRID.
Alain Blondel MICE: Constraints on the solenoids 2.Field Homogeneity: or ? this will be dictated by the detector requirements. TPG will be.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
MICE analysis meeting Alain Blondel 5 August MICE -- what running strategy? disclaimer: of course we will evolve the running strategy as problems.
Alain Blondel MICE VC 9 september 2010 Spokesmouse report o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May.
1Malcolm Ellis - Software Meeting - 31st May 2006 Data Challenge Requirements  First list of requirements, based on Yagmur’s document: u
CMPB Alain Blondel 14 April STATUS OF MICE.
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
MICE magnetic measurements Sequence of events and MICE hall movements Alain Blondel – 10-April 2012 revision from 13 December 2012.
MICE Video meeting Alain Blondel 7 December MICE -- what running strategy? reflections on steps I and II.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
MICE CM Alain Blondel 1   MICE GOALS OF THE MEETING Welcome to MICE CM28.
Physics Program and Runs: Autumn 2011 & Step IV V. Blackmore MICE Project Board, 08/03/12.
CM37 Alain Blondel step IV physics success 1 « STEP IV operations : Physics »
MICE CM15 wrap-up Alain Blondel 11 June MICE News Collaboration meeting 8-11 June 2006 at Fermilab complete review of the project. for those who.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
Project manager report paul drumm CM16 October 2006.
Status of the Muon Ionization Cooling Experiment (MICE) Yagmur Torun Illinois Institute of Technology April 1, 2013.
MICE collaboration meeting Alain Blondel 27 – Welcome to the 10th MICE collaboration meeting. 1.Global neutrino factory situation 2.Possible.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Results from Step I of MICE D Adey 2013 International Workshop on Neutrino Factories, Super-beams and Beta- beams Working Group 3 – Accelerator Topics.
Goals & Status MICE CM 33 Thanks go out to the organizers: Paul Soler, Ryan Bayes and Valerie Flood.
ICHEP 2012 Melbourne, 7 July 2012 Paul Soler on behalf of the MICE Collaboration The MICE Beam Line Instrumentation (Trackers and PID) for precise Emittance.
MICE VC 10-Oct-2013 Alain Blondel 1 MICE NEWS VC 162 LOTS OF THINGS HAPPENED! have arrived at RAL: -- EMR (see report today) -- AFC2 see pictures -- SS2.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
MICE CM35 Status and Goals Alain Blondel 1 WELCOME TO MICE CM35! – Status and Goals - Many thanks to Chris Rogers, Debbie Loader and Rose Hayes for taking.
MICE CM16 Goals Alain Blondel 8 October MICE CM 16 Collaboration meeting 8-11 October 2006 at RAL Goals of the meeting thanks to John Cobb & Marco.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
MICE VC Alain Blondel 1 MICE NEWS MICE VC 161 Agenda Overall schedule Magnetic field mitigation review Status of things.
MICE RF Workshop Alain Blondel MICE = critical R&D for neutrino factory and muon collider 1 neutrino factory: accelerate muons and store to produce.
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
MICE CMPB Alain Blondel 1 Highlights on MICE.
Alain Blondel -- After the ISS -- What did ISS achieve? 1. Established a « baseline » for the accelerator study 2. Rejuvenated simulation and study of.
MICE FAC open session Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
- MICE - The Muon Ionization Cooling Experiment Jean-Sebastien Graulich, Univ. Genève o Introduction: Aims And Concept o Design o Infrastructure: Hall,
MICE VC Alain Blondel 1 1. MOM is now Victoria 2. Linda Coney is new MICE Online Group coordinator (rep Jean-Sebastien) May we held.
Summary of Nufact-03 Alain Blondel NuFact 03 5th International Workshop on Neutrino Factories & Superbeams Columbia University, New York 5-11 June 2003.
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
MICE CM32 Goals of the Meeting Alain Blondel 1 WELCOME TO MICE CM32! – Goals and Status - Many thanks to Victoria Blackmore, Stefania Ricciardi and Mary-Elizabeth.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
ch/~bdl/lepc/lepc.ppt 1 MICE Status and Plans Rikard Sandström Université de Geneve International Scoping Study CERN,
MICE CM30 Goals of the Meeting Alain Blondel 1 MICE CM30 – Goals and Status.
MICE CM33 – system test? Alain Blondel 1 CM 33 wrap-up TOWARDS CM34.
MICE, Uni-Geneva and the transnational access to MICE (MICE-TNA)
1 paul drumm; Date; Title …project report …more comments paul drumm february 2005.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be at Cosener’s14-16 February meeting at Coseners House.
Approval of new results No requests Abstracts IPAC12, New Orleans May 20-25, due Dec 7 Short summary (VP) Enquiry (all) Abstracts to CHEP12, New York,
(one of the) Request from MPB
S TATUS OF THE P HYSICS A NALYSIS V. Blackmore MICE Project Board 29 th April, /30.
The MAP 3-Year Plan Mark Palmer Fermilab September 26, 2014.
K. Long, 28 June, 2016 Introduction to MICE — and the role of the Hydrogen Delivery System.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
MICE CM41 – CB summary Alain Blondel 1 Collaboration Board at CM41 Summary Alain Blondel.
Research and development toward a future Muon Collider Katsuya Yonehara Accelerator Physics Center, Fermilab On behalf of Muon Accelerator Program Draft.
MICE RLSR – 13Nov2013 Alain Blondel 1 MICE Project Board 14 November 2013 Alain Blondel.
Project Managers Report CM38 – Napa Roy Preece 24th February 2014.
UK Neutrino Factory Conceptual Design
Muon Ionisation Cooling Experiment Overview
Status of the MICE Construction Project
response to charge and MPB questions
MICE CM31 Schedule summary
The Muon Ionization Cooling Experiment: Controls and Monitoring
Presentation transcript:

MICE CM34 Wrap-up Alain Blondel 1 CM 34 wrap-up TOWARDS CM35

MICE CM34 Wrap-up Alain Blondel 2 (expected) Highlights of CM34 TOWARDS STEPIV: -- LH2 test completed -- SS1 in the hall and SS2 in training -- AFC working and measured -- magnetic field protection scheme advanced or solved -- We must converge on how to run the experiment. -- magnets, LH2, -- Champions, MOMs and shifters -- need a minimal number of people who will be at MICE (i.e. STFC-RAL, Chilton Didtcot UK) either as long term visitors or locals. --champions decide which online tools they need  discuss with C. Rogers -- progress on software, DAQ, Controls -- progress on EMR TOWARDS PUBLICATIONS -- Emittance paper full draft circulated -- PID paper results/contents final -- step IV apparatus paper TOWARDS STEPVI -- scenario for STEP VI defined and loaded schedule underway -- test of Coupling Coil 1 underway -- progress in planning RF construction and testing – system test, MIUCOOL test -- magnetics! GLASGOW, June 2012

MICE CM34 Wrap-up Alain Blondel 3 (expected) Highlights of CM34 TOWARDS STEPIV: -- LH2 test completed -- SS11 in the hall and SS2 in training -- AFC working and measured -- magnetic field protection scheme advanced or solved -- We must converge on how to run the experiment. -- magnets, LH2, -- Champions, MOMs and shifters -- need a minimal number of people who will be at MICE (i.e. STFC-RAL, Chilton Didtcot UK) either as long term visitors or locals. --champions decide which online tools they need  discuss with C. Rogers -- progress on software, DAQ, Controls -- progress on EMR TOWARDS PUBLICATIONS -- Emittance paper full draft circulated -- PID paper results/contents final -- step IV apparatus paper TOWARDS STEPVI -- scenario for STEP VI defined and loaded schedule underway -- test of Coupling Coil 1 underway -- progress in planning RF construction and testing – system test, MIUCOOL test -- magnetics! RAL, October 2012

MICE CM34 Wrap-up Alain Blondel 4 General picture 1. MICE is progressing a lot on all fronts 2. Magnet delays are really hurting us 3. with realistic schedule this leads to STEPIV start in Q Battle to keep this before the Aug.2014 shut down 4. and step V/VI in 2017/2018 need to identify where extra resources could help All agreed (including MPB) to go directly to step VI as this saves ~18 months on step VI. (running step V and reconfiguration thereafter)

MICE CM34 Wrap-up Alain Blondel  MICE SCHEDULE update: June 2012 STEP I STEP IV Q till Q STEP VI Run date: EMR run Q Under construction: NB: target date 2016

MICE CM34 Wrap-up Alain Blondel  Provisional MICE SCHEDULE update: October 2012 STEP I STEP IV Q till Q STEP VI Run date: EMR run Q Under construction: NB: target date Q Step V run possible Q year + 2 years

MICE CM34 Wrap-up Alain Blondel Step IV starting date = June 2014; (1.5months of running before Aug’14; restart End Feb 2015) difference from CM33-Glasgow: = 4 months for warmups and retrainings +3 months for fool-proofing of controls, monitoring and alarms +2 months for shipping +2.5 = 2x5 weeks for training total = 11.5 months matches ~Q year. some savings possible -- dont train correction magnets E1 E2 beyond need -- perform magnetic measurements at Wang after completion of magnet training -- CERN guys can do that -- save 5 weeks of retraining x 2 -- bevel shipping may save up to 1-2 months but many (im)possible sources of delays as we all know  will keep spring 2014 as step IV date for MPB Will try to come earlier to have sufficient running of MICE step IV before Aug 2014 shut down. Not by rushing but by keeping ‘eyes on the ball’ THIS WILL BE HARD.

MICE CM34 Wrap-up Alain Blondel 8 MICE keeping the eyes on the ball

MICE CM34 Wrap-up Alain Blondel 9 These schedule estimates result from first pass at fully loaded schedule. Congratulations to all involved in preparing them! Question asked is ‘what date can you promise to deliver’ rather than ‘how soon do we think we can achieve’ Challenge is now to beat those dates – not on paper but on the floor.  Milestones tracking  make sure the right people are at the right place

MICE CM34 Wrap-up Alain Blondel 10

MICE CM34 Wrap-up Alain Blondel 11

MICE CM34 Wrap-up Alain Blondel 12 Progress success scope for MICE Facilities based on muon storage rings have been advocated for several physics applications of great interest with discovery potential A. nuSTORM:  /s storage ring: (<1%) e   e   x-sections and sterile search B. neutrino factory:  /s storage ring precision study of CPviolation, unitarity C. Precision muon collider Higgs factory studies of X(125.5), H/A system (if there) ultra-precise measurements of any new particles in GeV range D. High energy muon collider: the most powerful envisaged machine to search the high energy frontier For B C D the high intensity muons beams are generated and prepared in a powerful magnetic bottle, from the target solenoid all the way to the last stages of cooling. This magnetic bottle consists of continuous magnetic field lines generated by a string of axial coils and solenoids. This is the key to high intensity muon beams MICE is such a magnetic bottle, from the diffuser to the end of the experiment. Cooling is the aim of the experiment but the lessons learned extend beyond that. MICE was designed to test the concept in stages with important results at each step

MICE CM34 Wrap-up Alain Blondel 13 Step IV -- Liquid hydrogen absorber realisation and routine safe operation -- complete particle detector system; calibrations of emittance measurement to  understanding of propogation of (imperfect) beam through the magnetic bottle -- correlated precision measurements of multiple scattering and energy loss straggling (this will constitute an important contribution to experimental particle physics!) -- engineering test of beamline made of several magnetically connected components -- measurement of 6D emittance change (observation of normalized emittance cooling) -- validation of simulation code -- limited possibility to test the longitudinal cooling with wedge

MICE CM34 Wrap-up Alain Blondel 14 Step V -- More difficult magnetic situation with one large ‘coupling’ coil -- RF cavity operation in magnetic field -- verification of understanding of energy loss and RF acceleration for particles up to large amplitudes and over all phases -- First measurement of usable ionization cooling

MICE CM34 Wrap-up Alain Blondel 15 STEP VI -- operation of channel with all magnetic couplings in place. -- full cooling cell allowing all optics configurations: flip, non-flip etc… -- exact replenishment of energy possible -- significant and measurable longitudinal heating -- precise measurement of equilibrium emittance of various configurations -- detailed and precise verification of simulation codes The relative risks (and associated expenses) of step VI wrt Step V have been considered minor wrt to the extra time needed (18 months delay to step VI) and we have agreed (with MPB support) that the baseline option is to skip step V

MICE CM34 Wrap-up Alain Blondel 16 MICE will have achieved the first demonstration of ioniztion cooling and tested essential concepts for production of intense muon beams It will have generated experience and know-how, bridging sometimes painfully a significant gap between the neutrino factory and muon collider dreams … and reality. This will set future developments on firmer ground. Once step VI is complete a powerful Cooling Test Facility is in place with -- a quality muon beam -- 8MW of 200 MHz RF power -- 23MV of acceleration -- infrastructure for 70 litres of liquid Hydrogen absorbers -- instrumentation for precision 6D emittance measurements -- a number of available magnets and associated infrastructure -- and… a number of people who have made (most of) the mistakes already a formidable asset that could be used for e.g. a 6D cooling experiment MICE legacy

MICE CM34 Wrap-up Alain Blondel 17 (expected) Highlights of CM35 RAL February TOWARDS STEPIV: -- SS1 ~fully trained at LBNL -- AFC working and measured in R9 -- magnetic field protection scheme well advanced -- use of plant room clarified -- questions regarding tracker shielding solved -- engineering solution for Flux return solution -- EMR complete, running on cosmics at UNIGE and preparing for shipping -- reconstruction, analysis and online software -- elog! TOWARDS PUBLICATIONS -- Emittance paper final -- PID paper final (requires KL reconstructioon included in MAUS) -- step IV apparatus paper started TOWARDS STEPVI -- test of Coupling Coil 1 underway and almost complete -- RF group progress (2MW?)

MICE CM34 Wrap-up Alain Blondel 18 A couple requests -- please advertise progress in the MICE news! (If you cant make text, send pictures!) -- answer rapidly to calls for MOMs and shifters -- continue proposing yourselves to give talks at workshops and conferences and make publicity for MICE and muon machines  Announcement from Vittorio

Abstracts for IPAC 2013 Posters ( Shangai May 2013) Draft abstracts to Speakers Bureau >1 week earlier,pleasehttp:// Up-to-date list always at News from the MICE Speakers Bureau V. Palladino, Univ. & INFN Napoli MICE Talks and Posters Sezione di Napoli Next major deadline: Dec 5, 2012 Traditionally a major event for MICE, several posters every year. Student Grant Request & Poster Session applications soon open (Oct 23).

MICE CM34 Wrap-up Alain Blondel 20 Thanks to Linda, Debbie, Rose for organisation of meeting and agenda THANKS to all MICE for large participation to CM34, excellent and realistic presentations