LCLS MD Downtime William Colocho June 2014 to June 2016.

Slides:



Advertisements
Similar presentations
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
Advertisements

FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
Stephanie Allison Integration with the SLC Control April 7, 2005 Introduction PNET Receiver VME Module SLC-Aware IOC Existing.
Hamid Shoaee Control System Installation 3/16/ Downtime Readiness Review Hamid Shoaee For LCLS Controls Group.
Patrick Krejcik LCLS April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience.
Mike Zelazny FAC April 17 th, 2007 Matlab Applications Image Management Bunch Length Measurement Feedback Software Engineers.
Dayle Kotturi Controls April 29, 2004 Controls Overview LCLS Facility Advisory Committee April 29-30, 2004 Outline Status.
Dayle Kotturi Controls April 29, 2004 Injector Controls LCLS Facility Advisory Committee April 29-30, 2004 Outline Description.
LCLS Control Group FAC - Controls April 7, 2005 Controls Overview April 7, 2005 Outline ES&H Goals FAC Responses.
Availability Performance of LCLS X-Ray FEL at SLAC William Colocho for the LCLS team.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
Henrik Loos High Level 17 June 2008 High Level Physics Applications for LCLS Commissioning Henrik Loos.
Diane Fairley High Level October High Level Applications FAC Review October 12, 2006 High Level Applications.
C.E. Rago Inj/Lin Design & 4_20_06 1 Injector / Linac Design & Fabrication C.E. Rago FAC Review 04_20_06.
Patrick Krejcik LCLS November 11-12, 2008 SLAC National Accelerator Laboratory 1 Post-commissioning Controls Enhancements.
Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
EPICS Insertion Device Control System Pete Owens EPICS Collaboration Meeting June 2003 Control System for a Helical Undulator Pete Owens Daresbury Laboratory.
Pohang Accelerator Laboratory POSTECH EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN The status of PLS EPICS application EPICS collaboration.
CLS Control System Progress Report Elder Matias Canadian Light Source University of Saskatchewan Saskatoon Saskatchewan.
EPICS Control Software Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
LCLS Control Group EPICS Collaboration April 27, 2005 Controls Overview April 27, 2005 Outline Goals Status update.
MTCA use in Linac to replace CAMAC Tom Himel June 4,
The recent history and current state of the linac control system Tom Himel Dec 1,
Hamid Shoaee Control LCLS ARR Oct 31, LCLS Accelerator Readiness Review Control System for Injector Commissioning.
LCLS Control Group FAC – 06 Installation October 27/28, Plans for 2006 Installation October 27, 2005 Installation.
12/06/2006 MFW. 12/06/2006 P-Bar Injection 12/06/2006 MFW Latest problems stem from RFT Module loosing phase lock. Greg Vogel informs us that the “real.
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
Patrick’s Updates - 8/30/11 (one slide for each of the following) 1.XTCAV Project 2.ASTA Gun Test Facility Instrumentation & Controls 3.Fast wire scanner.
Debbie Rogind LCLS Magnet June 15, 2006 LCLS Magnet Control Challenging Design Issues “How to integrate the legacy system.
Debbie Rogind LCLS Magnet June 15, 2006 LCLS Magnet Control Challenging Design Issues Subsystem architecture, or… “How.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
LCLS Commissioning & Operations High Level Software
MicroTCA Development and Status
SLC-Aware IOC LCLS Collaboration Jan 26, 2005
Introduction Functional Requirements (Stephanie) SLC Executive (Diane)
ATF/ATF2 Control System
Timing and Event System S. Allison, M. Browne, B. Dalesio, J
LLRF Controls Outline Requirements External Interfaces Schedule Design
Michael Sullivan and John Seeman SLAC National Accelerator Laboratory
Beam-Based Feedback in LCLS-II
LCLS Commissioning & Operations High Level Software
Maintain a single control room for all accelerator programs
EPICS Controls Steve Lewis 13 December 2007
LLRF and Beam-based Longitudinal Feedback Readiness
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
What am I working on… H. Loos 08/02/2010.
LCLS Longitudinal Feedback and Stability Requirements
Timing and Event System for the LCLS Electron Accelerator
LTU/Undulator Installation Status
Machine Studies/Software Update
Linac/BC1 Commissioning P
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Injector / Linac Installation Current Status
Magnet Controls K. Luchini
High Level Physics Applications for LCLS Commissioning
EPICS at SLAC EPICS/SLC Controls Co-existence LCLS Injector Support
Breakout Session SC5 – Control Systems
Operational Experience with LCLS RF systems
2007 Downtime Controls Installation
Control System Overview Hamid Shoaee LCLS Control System Manager
Injector/Linac Design Status C. E
LCLS e- Beams System Overview
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Timing and Event System Status DOE Review of the LCLS Project SC5 - Controls Systems Breakout Session S. Allison, M. Browne, B. Dalesio, J. Dusatko,
LCLS Control System Personnel Linac & BC2 Controls progress
Physics Update P. Emma FAC Meeting October 27, 2005 LCLS.
LCLS e- Beams Systems Manager
Control System Overview Hamid Shoaee LCLS Control System Manager
Presentation transcript:

LCLS MD Downtime William Colocho June 2014 to June 2016

2 LCLS MD Downtime Controls Power Supplies Utilities Vacuum Guns and Lasers

3 Controls - LCLS MD Downtime hours NameSum Lost Time Controls Software25 Electronics Hardware22 Micros & crates12 MPS10 PPS7 Timing5 BCS4 Motion Control3 IOCs & VME crates3 Profile Monitors incl. bunch length 3 Vacuum I&C2 Wire monitors1 Workstations & CUDs1 BPMs1 Servers1 SubsystemControls Software DC MAGNETS9 BPM4 OTHER2 COMPUTER2 AIDA2 COMPUTING INFRASTRUCTURE 1 KLYSTRON / MODULATOR 1 EDM1 WIRES1 VME1 MAGNET1 MOTION CONTROL1 MPS0 FAST FEEDBACK0 MATLAB APPS0

4 Controls - LCLS MD Downtime hours NameSum Lost Time Controls Software25 Electronics Hardware22 Micros & crates12 MPS10 PPS7 Timing5 BCS4 Motion Control3 IOCs & VME crates3 Profile Monitors incl. bunch length 3 Vacuum I&C2 Wire monitors1 Workstations & CUDs1 BPMs1 Servers1 SubsystemElectronics Hardware LASER15 MPS12 KLYSTRON / MODULATOR6 MOVERS6 SUBBOOSTER4 CAMAC4 PROF3 RF3 UNDULATOR2 TIMING2 WATER2 COMPUTER1 OTHER1 BPM1 DC MAGNETS1

5 Power Supplies Code Name Sum Lost Time Linac Modulators 29 Power Supplies 2 Cables2 Controllers1 Sub-booster supplies 1 AreaSum Lost Time LINAC EAST18 LCLS-INJ8 DMP (EBD)4