Blanco & ETS ACTR, 15 March 2010. Blanco Glycol cooling system upgrade – Enrique Figueroa report – ACTR DocDB #266 – “A quotation for a 40ton unit has.

Slides:



Advertisements
Similar presentations
TEKTON INTERNATIONAL INC. ADT DEVELOPMENT PROJECT PRESENTS:
Advertisements

Let’s watch a DVD… DVD Instructor Notes
ROOM DATA SHEETS For Medical Projects using the data available from the NHS Activity Database (ADB) © Workface Solutions 2004.
Or... What happens when Sponge Bob meets Bob the Builder??? 1.
CD Operations Part of Division Office Gerry Bellendir, Assoc. Head for Operations David Ritchie, Assistant Head for Operations Amy Pavnica, Senior Safety.
Measure G Overview March 9, Measure G School Facility Improvement East Side Union High School District To provide greater security and safety, relieve.
Electrical Fire Safety Fire Prevention Week 2012 Electrical Safety Foundation International.
Equipment and Facilities. 154 Plan Review The local health department must assess your facility and equipment before: –Beginning construction of a food.
Air-Conditioning Control Systems
Room Data Sheets – The Concept © Steve Foott 2004.
1 Infrastructure issues Andy Nichols, STFC – RAL MICE Collaboration Meeting, Harbin, 13-17th January 2009.
AIR CONDITIONING (COOLING)
Gas Turbine Power Plant
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
1 MICE-Video Conference Status of MICE Hall Contents: General status Electrical Mechanical Preparing for Steps II & III Risks and worries Andy Nichols,
Magellan Telescopes Observatory Report Accomplishments Problems Work in Progress Network f5 mirror coating.
1. 1 3/14/11 Church Conference 14-Mar-11 Welcome and Introduction Opening Prayer Presentation of Building Project Motion to Approve Project Vote on Proceeding.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
Infrastructure Improvements 2010 – November 4 th – Hepix – Ithaca (NY)
Keeps heat indoors in winter and outdoors in summer – means lower heating and cooling bills Rated by it’s R-value. The greater the R- value the better.
1 MICE Hall construction status Richard Apsimon MICE VC meeting 29th Nov 2007.
Commodity Node Procurement Process Task Force: Status Stephen Wolbers Run 2 Computing Review September 13, 2005.
Food Safety Training Course Co-financiado:. Work facilities and Equipments.
C H A P T E R Facility Layout and Scheduling.
1 Progress for July 16, 2011 We woke up to 9+ inches of new heavy snow.
Blanco Glycol System, utilities Brooke Gregory DECam I&I meeting, April 2011.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
Phase III – SHDH Air Handler Upgrade Project Town Hall Meeting – July 21, 2015.
By: Mr. Brock.  Electricity- Source of energy that can be easily converted into light, heat or power  Ampere (Amp)- Unit of measure of the rate of flow.
PHENIX UPGRADE Stony Brook Project Hadron Blind Detector Facilities 31Aug05.
Electricity Calculating Electric Power This lesson is from Virginia Tech and has not been edited by the Georgia Curriculum Office.
Mike Andrews May 10, Week 54 NuMI Activities Initial test controls on the MI65 RAW exchange skid Complete hydrostatic test of the MI65 exchange.
Pg 1 15 September 2015 ACTR Meeting SOAR: Resources & Priorities Jay Elias.
DECam in Overview Alistair Walker Version 3 December Ver 4 Updates Jan
Pg 1 21 April 2016 ACTR Meeting SOAR Priorities Jay Elias.
S A Griffiths CM42 June 2015 Electrical & Control.
Updates on projects 472, 470, 443, 462, 442, 471, 480, 483, 484 Tim Abbott Changes since 9 July are in blue.
POPS-B Project Update 07 June 2016 POPS-B: Project update and Feedback from POPS Experience LIU-PSB Meeting June 2016 Fulvio Boattini TE/EPC 2.
The Blanco Environmental Control System Alistair R. Walker November
Components of Construction part 2
H. Hayano(KEK), B. Petersen(DESY), T. Peterson(FNAL),
Blanco Telescope and DECam Alistair Walker ACTR meeting 22 March 2013
Data Center Stabilization
The Next Generation of a Gamma Irradiation Facility GIF++
Technical resources schedule
SNS COLLEGE OF ENGINEERING Coimbatore-107 Subject: Thermal Engineering
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
SNS COLLEGE OF ENGINEERING Coimbatore-107 Subject: Thermal Engineering
Machine operation and daily maintenance management in SOLEIL
Objective 6.02 part 2: Recognize components of construction
Blanco Environmental Control System
HVAC Building & Floor Cooling System
Alistair Walker Version 3 December
Southern Lehigh School District
News and brief overview of Beamline plans for the next few months
ETS For ACTR 9the April 2015 R.Tighe april 2011 april /04/2015
Construction (Design and Management) Regulations (CDM) 2015
Experimental Facilities Planning
AIR CONDITIONING AND HEATING REFRIGERATION SERVICES AIR CONDITIONING AND HEATING REFRIGERATION SERVICES Karalis Mechanical Expert local air conditioning.
Enter a new career in as few as 16 weeks
ISA Prime Developments
IBBelle: Status Commissioning at MPP Transport to KEK
St. Clair County Community College, Port Huron, Michigan
User Facilities 2016 Users Group Board of Directors Update
Chapter 19 Electrical Plans.
ACTR meeting 9 / 9 / 9.
Construction Management Option
Mount Vernon Community School
Master Facilities Committee Evaluation and Identification
Mount Vernon Community School
Presentation transcript:

Blanco & ETS ACTR, 15 March 2010

Blanco Glycol cooling system upgrade – Enrique Figueroa report – ACTR DocDB #266 – “A quotation for a 40ton unit has been received; however due to the piping limitations we recommend the purchase and installation of a no larger than 30ton unit.”, seeking quotes. Instrument Maintenance Facility – Brooke to report Repair/upgrade 4m Mirror Coating Chamber – parts being purchased, target for realuminization in 2010B – Now also dependent on circuit breaker repair

Burned out 480A circuit breaker – Sat 13 March Now cannot exceed 225A – no aluminizing chamber, no power for NEWFIRM compressors. Gale is exploring options for a new circuit breaker.

Blanco cont. Upgrade Tololo UPS system: ordered Blanco Computing/Console Room upgrade New first floor for Blanco 4m: design done, purchases starting Blanco entrance protection (safety) Linked to Computing/Console upgrade

New console room

New console/computer room Quotes for (re) construction being obtained – Move walls, move entrance, raise ceiling Parts being & to be ordered – Flooring, electrical components, lighting, ceiling – Air conditioners Schedule: – June – Sept 2010 – Prepare new console room – ~Sept 2010 – Move console room – Then – convert old console room to new computer room. – Finish by end 2010.

ETS Nice quite summer “Noisy” March so far Communications Maintenance - CMMS Tight schedule ahead…

High Priority Projects DECam NEWFIRM TCS Upgrade SAM

ETS ETS Jefes are under instructions to complain if high priority projects are interrupted or delayed by “small” work packages which are slipped into the queue while no-one’s looking. – It’s one thing to ask for help for an hour or two, another thing entirely to distract workers for days at a time. We are going to be under considerable pressure for the next few months and it is important that everyone cooperate and not try to make shortcuts or “end runs”.

ACTR Steve says we can close Project #445 “Arcview II” – Yay!