Test Tube Activities at Ohio State (7/29/03) Amphenol/Spectra Strip will send two 10 m long samples of signal cable –With a (round) jacket, shielding –20.

Slides:



Advertisements
Similar presentations
LST Mechanical Design Review Utility Routing, Cableways & Crate Locations Peter Kim October 21, 2003.
Advertisements

B.Satyanarayana, TIFR, Mumbai INO Collaboration. B.Satyanarayana BARC-TIFR INO meeting, TIFR, Mumbai November 9,
The group is developing readout electronics for initial use with the prototype test-stand at Fermilab. This work will contribute towards the design and.
Ecal Connection board and Motherboard design. Connection Board Motherboard.
IFR-LST status report G. Cibinetto INFN Ferrara Babar Collaboration Meeting, Feb. 21, 2004 Milestones LST production status 1 st module assembled Princeton.
RACKS AND CABLES Peter Kim SLAC LST Install Readiness Review May 5, 2004.
LarTPC Electronics Meeting Current Work at MSU Fermilab Dan Edmunds 23-February-2010.
1 RPC HV cable pick-up noise issue C. Lu, Princeton University (10/26/2008) I pulled out some slides from my old DocDB files (DocDB#2209 and #406), and.
BaBar/LST Meeting Dec 8, 2003K. Honscheid, Ohio State University Module Assembly Quality Control High Voltage Ohio State Status Report.
Large Cell Scope Pictures, Part II HV Gnd 1nF Large Cell Tube Anode signal Phi Cathode signal scope S1 S2 S1 S2 This is a follow-up on Richard’s measurement.
Saverio Minutoli INFN Genova 1 T1 Electronic status Electronic items involved: Anode Front End Card Cathode Front End Card Read-Out Control card Slow Control.
Readout of DC coupled double sided sensors with CBMXYTER: Some first thoughts Peter Fischer, Heidelberg University.
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
ISUAL Spectrophotometer Electronics C. Ingraham. 2NCKU UCB Tohoku CDR 9 July, 2001 Spectrophotometer Electronics C. Ingraham SP Electronics Functions.
Modems Problem –Computer is digital –Telephone line is analog –Need translation device called a modem Digital Signal Modem Analog Signal.
1 Hall D Drift Chamber ElectronicsFJ Barbosa Drift Chamber Review6-8 March 2007 Electronics for CDC and FDC Hall D 1.Motivation 2.ASIC Development 3.Preamp.
Gif++ CR tracker setup G. Aielli for the RPC collaboration.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
S. Lusin, T1 ESR, CERN 17 Sep 101 Totem T1 ESR 17 Sep 10 S. Lusin Observations from Electrical Inspection of T1.
CaRIBOu Hardware Design and Status
RPC (Barrel) Cabling summary. Signal cable specifications Signal Cables (two possibilities): –Loose pair round and twisted pairs (with flat zone for crimping.
January 22, 1999SciFi L1 Trigger Review 1 Analog Hardware Front-end Board (CTT_FE) –Transmit (and split) the VLPC signal to the Multi-chip Modules –Discriminate.
The LST High Voltage System LST Readiness Review May 5, 2004 Klaus Honscheid Ohio State University.
IFR barrel upgrade: status of LST option Roberto Calabrese Ferrara University 10/18/2002.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
Photos of Rig. The FRB Stack The FRBs The SiPMs The PotentiometersDry Air Tube Cooling Pad Fixel Trigger Board FRB to BBB Ribbon Cables.
LST Upgrade LST Upgrade Readiness Review William Sands, Princeton University,
Itzhak Tserruya, BNL, Aug. 11, Itzhak Tserruya Weizmann Institute, Israel BNL, Upgrades Meeting, Aug. 11, 2004 HBD: Infrastructure and Integration.
11 SSD Power and Cooling on the Cone STAR Integration Workshop Howard Matis May 16, 2008 STAR Integration Workshop Howard Matis May 16, 2008.
Questions on IFPAC_SCHEMATIC. Signal Chain Preamplifier Compensation Capacitor should go to –Vs, not GND Where is resistor For compensation Network? Does.
By: Uriel Barron Matan Schlanger Supervisor: Mony Orbach Final Review March 2015.
29-Jun-09H. Henschel DESY (Zeuthen) 1 Frontend Interface Summarize.
A Study of Proton-Proton Collisions at the LHC The Ohio State University - Task A.2 B.G. Bylsma, L.S. Durkin, D. Fisher, J Gilmore, J.H. Gu, D. Larson,
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
AHCAL Physics Prototype. The Electronics Part Mathias Reinecke for the AHCAL developers DESY, March 2nd, 2010.
Front End Board (16 channels) Superlayer Cross Section Frontend Enclosure HV cap board HV cap Board Signals from chamber wires go to HV cap board to be.
P. Aspell CERN April 2011 CMS MPGD Upgrade …. Electronics 2 1.
DCS meeting27.Sep.2002 Serguei Zelepoukine (IHEP, Protvino) Contents: 1. Front-end electronics: problems & solutions. 2. DCS cabling outside the ECAL detector.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
Connector Differential Receiver 8 Channels 65 MHz 12 bits ADC FPGA Receive/buffer ADC data Format triggered Events Generate L1 Primitives Receive timing.
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
0-10V Ballast Dimmer HDL-MRDA HDL-MRDA channel 10A DC0 - 10V output module is a multifunction control module. It has 6 channel relay.
Quality Control QC is taken very serious QC Document for Tube Production QC Document for Module Assembly QC Document for Installation.
Nov 1, 2007 IEEE NSS & MIC 2007 by C. Y. Chi 1 A Faster Digitizer System for the Hadron Blind Detector in the PHENIX Experiment Cheng-Yi Chi Nevis Lab.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Annecy, Carleton/CRPP, Colorado, Colorado State, LBNL, Maryland, McGill, MIT, Montreal, INFN Padova, INFN Pisa, Princeton, INFN Rome, UC San Diego, UC.
LSTs in the IFR gaps Workshop on IFR replacement SLAC November 14, 2002 L. Piemontese INFN Ferrara.
MQXFS01 instrumentation, Projecting towards MQXFA D. Cheng, S. Myers, H. Pan, X. Wang 10/14/20151.
FEE for Muon System (Range System) Status & Plans G.Alexeev on behalf of Dubna group Turin, 16 June, 2009.
TIMING DETECTOR ELECTRONICS FRONT END ELECTRONICS - NINO JOSE DA SILVA –CT-PPS TIMING ENGINEERING REVIEW /
Relay Controller Device. 2 Relay Controller Device (RCD) If additional relays are needed beyond the two that are available on the DCD, then a RCD can.
DAQ ACQUISITION FOR THE dE/dX DETECTOR
Figure 4.1 Computerized data-acquisition system.
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
Analog FE circuitry simulation
Structure and etc Shoji Uno (KEK) at B2GM
Mini-drawers, FE-ASIC , Integrator
Summer 2000 HF Beam Test. DAQ proposal.
FMC adapter status Luis Miguel Jara Casas 5/09/2017.
EMC Electronics and Trigger Review and Trigger Plan
The digital read-out for the CSC system of the TOTEM experiment at LHC
Component Tracking Use computer based tracking system
Overview of T1 detector T1 is composed by 2 arms
The digital read-out for the CSC system of the TOTEM experiment at LHC
Seyoung Han / Ewha Woman’s Univeristy
Limited Streamer Tube Project Summary
Characterization of Wired-OR prototype board
Presentation transcript:

Test Tube Activities at Ohio State (7/29/03) Amphenol/Spectra Strip will send two 10 m long samples of signal cable –With a (round) jacket, shielding –20 pairs (more than we need. Can we crimp this to the connectors?) –Who will make the signal cables? (I won’t be at SLAC before Aug. 26) Kerpen HV cable is not available. –No stock at CERN or Kerpen (in 10, 20 or 25 wire configuration) –37-wire cable available at Kerpen (not recommended)

HV Connection(s) HV capacitors Cable Connector Anode signal readout What HV connector? Do we have room for 8? “Pigtail” for anode signals/short? Short wires to endcaps Build at OSU, send to Princeton 1 MOhm 1 nF Anode Signal HV 4x Large Cell LST

Differential Driver and Preamp Based on Angelo’s design (from Princeton workshop) On chamber preamp with differential output (4 channel PC board) Differential receiver and preamp with analog output. No discriminator or digital output (needs to be added for DAQ readout) Both modules have been built and are currently being tested. Will send driver circuit to Princeton for installation in module/Al box.

Integration Questions How do we connect the signal cables to the strips? Does everything have to be in the Al box? Can we have 6’’ pigtails that connect to the signal cable and/or the preamp circuit? We need to know, how much space is available in Al box (also for HV) We would like to be able to test several combinations: –Baseline design (no diff. driver/preamp, Standard FE receiver/preamp) –Differential design (with differential preamp, receiver) –Pseudo differential (no diff. driver/preamp, differential receiver) Tube 1 Tube 2 Al box Baseline Receiver Differential Receiver* Jumper board Differential Driver or jumper board * Can go on either tube