Marc Anduze first drawings of Ecal eudet module COPIED FROM : Marc Anduze PICTURES FROM : CALICE/EUDET electronic meeting – CERN – 12 July 07.

Slides:



Advertisements
Similar presentations
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Advertisements

J-C Brient LLR Progress report on the ECAL prototype 2 - New informations on the cost of the W-Si ECAL 3 - A proposal for a new design of the.
CALICE Dave Bailey. Aims and Objectives Develop the technology to build a high- resolution tracking calorimeter for ILC experiments Main thrusts: –Testbeam.
Manchester 09/sept/2008 A.Falou & P.Cornebise {LAL-Orsay} 1 SLAB Integration & Thermal Measurements Slides Overview Thermal Measurements (Demonstrator)
J-C. BRIENT (LLR) 1  Introduction with pictures  Prototype design and construction  R&D on the design of the full scale calorimeter CALICE - ECAL silicon-tungsten.
Vertex Detector Cable Considerations Bill Cooper Fermilab VXD.
CALICE Thermal Simulations Steve Snow 6/3/06 Aim to predict the temperature values and gradients within the CALICE structure. Use spreadsheet estimates.
Victoria04 R. Frey1 Silicon/Tungsten ECal Status and Progress Ray Frey University of Oregon Victoria ALCPG Workshop July 29, 2004 Overview Current R&D.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
David Bailey Manchester. Summary of Current Activities UK Involvement DAQ for SiW ECAL (and beyond) “Generic” solution using fast serial links STFC (CALICE-UK)
November Vertex 2002 Kazu Hanagaki1 Layer 0 in D0 Silicon Tracker for run2b Kazu Hanagaki / Fermilab for D0 run2b Silicon Tracker group Motivation.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
Marc Anduze – 09/09/2008 News on moulds and structures CALICE meeting - Manchester.
1 Denis Grondin – Sept.23 TH, 2010 Cooling & mechanics status CALICE Collaboration Casablanca at LPSC ECAL.
1 Status of ECAL Mechanical and thermal R&D in Grenoble FJPPL’08 Denis Grondin Julien Giraud
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
Mickael Frotin– 07/06/2009 Demonstrator - Assembly ECAL meeting - London.
Anduze – 03/09/ Alveolar Structure - Towards ordering of pieces.
ECAL silicon- tungsten status
Mickael Frotin– 15/01/2010 ECAL MACHANICAL R&D ECAL meeting - PARIS 1.
CALICE Collaboration Meeting March 2014 Roman Pöschl LAL Orsay On behalf of: D. Grondin, J. Giraud J. Bonis, P. Cornebise, A. Thiebault, C. Bourgeois,
FEV Boards status N. Seguin-Moreau on behalf of
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
ECAL EUDET MODULE progress & perspective EUDET annual meeting, oct, 18 st, Munich.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
Cristina Lo Bianco - LLR Cosmics test for the W-Si prototype (CALICE) Why the test in cosmics? The cosmics test-bench DAQ for the cosmics test-bench All.
Montpellier, November 12, 2003Vaclav Vrba, Institute of Physics, AS CR 1 Vaclav Vrba Institute of Physics, AS CR, Prague CALICE ECal Status Report.
Ray Thompson Manchester Xmas Meeting 20/21 Dec 06 Ray Thompson, Julian Freeston, Andy Elvin WP4 aims: look at Mechanical/Thermal/ Assembly issues Utilise.
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
EUDET JRA3 ECAL in 2007 : towards “The EUDET module” C. de La Taille IN2P3/LAL Orsay.
SPD CFSS screening/Harness RB24-RB26 /ALICE Week A. Pepato – INFN PD 1 CFSS and ES electrical screening for SPD Harness RB24-RB26 Electrical.
TPC Integration P. Colas (thanks to D. Attié, M. Carty, M. Riallot, LC-TPC…) TPC layout(s) Services Power dissipation Endplate thickness and cost Mechanical.
CALICE SiW EcalAboud Falou/ LAL-Orsay Detector SLAB Integration EUDET Prototype Slab cross section, thickness budget Space Frame Ladder {Step.
CALICE collaboration CALICE collaboration J-C BRIENT LCWS02 – Jeju Island The CALICE –ECAL Silicon - V. Vrba Very FE - S. Manen Readout/DAQ - P. Dauncey.
– EUDET module – Report from Mechanics Brainstorming Marc Anduze – 30/06/2009 Laboratoire Leprince Ringuet Ecole polytechnique - Palaiseau.
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
Monday June 8, 2009CALICE SiW ECAL Meeting ULC London EUDET prototype Thermal drain and plans for module assembly Julien Bonis CAD model.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
Front-End electronics for Future Linear Collider calorimeters C. de La Taille IN2P3/LAL Orsay On behalf of the CALICE collaboration
ILC/EUDET developments at LAL Scientific council 23/9/05 B. Bouquet, J. Fleury, C. de La Taille, G. Martin-Chassard LAL Orsay.
FGT Magnet C Assembly metric tons (59 US tons) -100mm thick steel plates -6.6m high x 3.1m wide x 1m deep (outer dimensions) -5m high x 2.25m wide.
Front-end Electronic for the CALICE ECAL Physic Prototype Christophe de La Taille Julien Fleury Gisèle Martin-Chassard Front-end Electronic for the CALICE.
SiW ECAL Marcel Reinhard LLR – École polytechnique LCWS ‘08, Chicago.
FKPPL, Febuary , Rémi Cornat 1 FKPPL technical activities CALICE Si-W ECAL Rémi CORNAT
Third LPSC – 02 Nov 2014 Denis Grondin, Julien Giraud Si/W ECAL Endcap structures and cooling LPSC - Grenoble –nov Design of the.
High Granularity Calorimeters LLR – Feb 2-3 Denis Grondin, Julien Giraud Si/W ECAL Endcap structures and cooling 1.Design of the EM end-caps.
Durham TB R. Frey1 ECal R&D in N. America -- Test Beam Readiness/Plans Silicon-tungsten SLAC, Oregon, Brookhaven (SOB) Scintillator tiles – tungsten U.
SiW Electromagnetic Calorimeter - The EUDET Module Calorimeter R&D for the within the CALICE collaboration SiW Electromagnetic Calorimeter - The EUDET.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
EUDET Extended SC SiW Ecal 1 SiW Ecal EUDET Module - General Schedule - Development of Different Components - (Towards) a working prototype Roman.
EUDET Annual Meeting SiW Ecal 1 SiW Ecal EUDET Module - General Schedule - Development of Different Components - (Towards) a working prototype Roman.
Mickael Frotin– 19/10/2009 ECAL MACHANICAL R&D CALICE meeting - Genève 1.
ECAL front-end electronic status
ECAL EUDET MODULE Summary talk
CALICE: Thermal, Mechanical and Assembly issues
Mechanics for front-end Electronics Of T2K-II TPCs – A Few Conceptual Ideas D. Calvet, Irfu, CEA Saclay, Gif sur Yvette Cedex, FRANCE.
Test Slab Status CALICE ECAL test slab: what is it all about?
C. de La Taille IN2P3/LAL Orsay
Electronics for Si-W calorimeter
CALICE Collaboration Meeting at UT Arlington
CALICE/EUDET Electronics in 2007
Joint Research Activity 3: Calorimetry
prototype PCB for on detector chip integration
STATUS OF SKIROC and ECAL FE PCB
Ecal Front End Electronics
Limited Streamer Tube Project Summary
Possible types of Si-sensor: SILICON CALORIMETRY FOR A LINEAR COLLIDER G.Bashindzhagyan, Il Park August Silicon sensor.
Presentation transcript:

Marc Anduze first drawings of Ecal eudet module COPIED FROM : Marc Anduze PICTURES FROM : CALICE/EUDET electronic meeting – CERN – 12 July 07

Julien Fleury – EUDET/CALICE Electronic Meeting – 12 Jul 07 Why this prototype ?  Next step after the physics prototype and before the module 0  To study “full scale” technological solutions which will be used for the final detector (moulding process, thermal cooling, inlet/outlet, integration tools …)  To take account of the industrial point of view  To estimate the cost of the future Si/W ECAL “Final” Detector ECAL HCAL Tech. prototype 1 st ECAL Module (module 0) ECAL Prototype From M. Anduze

Julien Fleury – EUDET/CALICE Electronic Meeting – 12 Jul 07 Global Presentation Concept : to be the most representative of the final detector module :  An alveolar composite/tungsten structure with : - same W sampling : 20×2.1 mm and 9×4.2 mm thick - 3 columns of cells to have representative cells in the middle of the structure (with thin composite sheets ) width : 124 mm 180 mm - Identical global dimensions (1.5m long) and shape (trapezoidal) - fastening system ECAL/HCAL (include in the design of composite structure)  15 Detector slabs with FE chips integrated - 1 long and complete slab ? (L=1.3m) - 14 short slabs to obtain a complete tower of detection (typ. L=40 cm) - design of compact outlet (support system) Complete Tower of 4 wafers Long detector slab (1) Short detector slabs (14) 3×15 cells Alveolar Structure C/W Fastening system From M. Anduze

Julien Fleury – EUDET/CALICE Electronic Meeting – 12 Jul 07 Assuming that the chip power is 25 µW/channel total power to dissipate will be : 2055 W  external cooling OK for the “full scale ECAL” inside each slab : necessity of cooling system but active or passive ? Ex: Pessimist s imulation of heat conduction just by the heat shield : λ = 400 W/m/K (copper) ;S = 124*0,4 mm 2 L = 1,55 m ;  = 50*  chip = 0,18 W We can estimate the temperature difference along the slab layer around 7°C and without contribution of all material from slab (PCB, tungsten, carbon fibers…)  passive cooling OK : Thermal conductors (heat shield) can be added in the slab to carry heat more efficiently along the slab direction. Design of the module … Thermal sources: … while taking account of Slab Thermal analysis CALICE ECAL: ~ 82.2 M of channels 21.8 M From M. Anduze

Julien Fleury – EUDET/CALICE Electronic Meeting – 12 Jul 07 The expected alveolar thickness is 6.5 mm if :  Gaps (slab integration) : 500 µm - OK  Heat shield : 400 µm ? but real thermal dissipation ? (active cooling ?)  PCB : 800 µm but chips embedded in PCB ?  Thickness of glue : 100 µm ? study of the size of dots ?  Thickness of wafer : 300 µm ?  Ground or isolate foil : 100 µm ? AC vs DC ?  Thickness of W : 2100 µm - OK Heat shield: µm (copper) Design EUDET Slab PCB: 800 µm glue: 100 µm (needs tests) wafer: 300 µm Chip without packaging ground foil: 100 µm 6000 µm Design of the module… … based on the definition of the detector slab : Chips and bonded wires inside the PCB Several technological issues have to be studied and validated From M. Anduze

Julien Fleury – EUDET/CALICE Electronic Meeting – 12 Jul 07 The Design of alveolar structure 545 mm Composite part with metal inserts (15 mm thick) Composite part (2 mm thick) 180×6,5 mm 180×8,6 mm Composite part (1 mm thick) Thickness : 1 mm Weight ~ 650 Kg From M. Anduze

Julien Fleury – EUDET/CALICE Electronic Meeting – 12 Jul 07 Detector slab - principle Connection between 2 PCB 7 “unit” PCB “end” PCB Short sample Long slab is made by several short PCBs :  Design of one interconnection (glue ?)  Development easier : study, integration and tests of short PCB (with chips and wafers) before assembly  The length of each long slab will be obtained by the size of one “end PCB” (tools) From M. Anduze

Julien Fleury – EUDET/CALICE Electronic Meeting – 12 Jul 07 Chip on board design ILC_PHY4 Last prototype EUDET prototype

Julien Fleury – EUDET/CALICE Electronic Meeting – 12 Jul 07 High voltage distribution -200V Amp AC coupling : Wafer 1 Channel DC coupling : V Amp 1 Channel 200V 1 Wafer

Julien Fleury – EUDET/CALICE Electronic Meeting – 12 Jul 07 Slab issues No room for external components Not possible (and too expensive) to embed decoupling capacitance and high voltage resistor on the wafer  Only DC coupling possible

Julien Fleury – EUDET/CALICE Electronic Meeting – 12 Jul 07 Solution for HV decoupling N high-voltage lines, suppliing 1/N of the total number of wafer + decoupling Ground return through PCB Amp Decoupling with parasitic capacitance of other channels FEE : DC coupled Nb of channel/HV line > 1000  Crosstalk < 1/1000