ISOE-Europe 3/25/04 1 San Onofre Unit 1 Decommissioning Eric M. Goldin Eric M. Goldin Southern California Edison Company.

Slides:



Advertisements
Similar presentations
DSHS Radiation Control. Radiation Control Who We Are Radiation Control serves all the residents of the State of Texas by protecting them and their environment.
Advertisements

Clear Thinking on Nuclear: Transportation issues Experience, planning, and preparedness Well designed and thoroughly tested containers Coordinated efforts.
Adam H. Levin AHL Consulting May 14, BWR – Boiling Water Reactor DOE – Department of Energy DSC – Dry Storage Canister ISF – Interim Storage Facility.
1 KRB-A (Grundremmingen, Germany). 2 Type:Boiling Water Reactor Power: 250 MW(e) Started in 1966, shut down in 1977 First commercial power reactor in.
Copyright [insert date set by system] by [CH2M HILL Entity] Company Confidential Update on Fukushima Daiichi NPP 1 – Preparations for Core Debris Removal.
N O L UTI O NS OI ZS LLC An EnergySolutions Company Zion Status Update for Zion Community Advisory Panel November 25, 2013 Patrick Daly.
Independent Spent Fuel Storage Installation (ISFSI) Dry Cask Storage NUCP
Interim Storage of Used Nuclear Fuel February 2008.
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
1 Successful decommissioning of a nuclear plant Evelyn Hooft Bart Thieren 20 june 2008.
Decommissioning Nuclear Reactors. Background Before a company decides to close it’s power reactors the facility must be put in to a state that no longer.
Decommissioning Nuclear Reactors. Background Before a company decides to close it’s power reactors the facility must be put in to a state that it no longer.
MODULE “STRATEGY DEVELOPMENT”
NRC Decommissioning Activities for the San Onofre Nuclear Generating Station Bruce A. Watson, CHP Chief, Reactor Decommissioning Branch Division of Decommissioning,
Setting the Stage: Review of 2013 IEPR Nuclear Recommendations Danielle Osborn Mills Former Senior Nuclear Policy Advisor to the California Energy Commission.
Spent Nuclear Fuel Timothy Pairitz. Nuclear Power 101 Uranium-235 is enriched from 0.7% to 3-5%. Enriched fuel is converted to a uranium oxide powder.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/2 Design Geoff Vaughan University of Central Lancashire,
MPMP Power Supply 1 Nuclear Power Update for The Society of American Military Engineers September 15, 2010.
Capabilities & Competencies An Introduction to EnergySolutions September 19, 2007 Scott Baskett Erik Vogeley.
N O L UTI O NS OI ZS LLC An EnergySolutions Company Zion Status Update for Zion Community Advisory Panel. Gerard van Noordennen September 29, 2014.
Authorization and Inspection of Cyclotron Facilities Authorization for the Decommissioning of the Facility.
Radiation Safety Management KHNP Lee Eung-Il HANUL Unit4 Steam Generator Replacement.
California Energy Commission James Madigan April 27, 2015.
NEI Presentation on Nuclear Decommissioning Trust (NDT) Use Concerns.
VERMONT YANKEE Transitioning into SAFSTOR ​SEPTEMBER 2, 2015 Paul Paradis Director Decommissioning.
Transportation of Radioactive Material in the United States Earl P. Easton.
August 4,  Vermont Yankee Nuclear Power Station (VYNPS) ceased power operations on December 29, 2014 after 633 days of continuous power operation.
MODULE “PROJECT MANAGEMENT AND CONTROL” ORGANIZATION AND ADMINISTRATIVE CONTROL SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
MODULE “COST ESTIMATION, CALCULATION AND COST CONTROL” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da.
1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
N O L UTI O NS OI ZS LLC An EnergySolutions Company Zion Status Update for Zion Community Advisory Panel. John Sauger – General Manager June 8, 2015.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
1 ESTABLISHMENT OF REQUIREMENTS Module “DECOMMISSIONING PROCESS” Project BG/04/B/F/PP , Program “Leonardo da Vinci”
IAEA International Atomic Energy Agency. IAEA Dr. Abraham Gregorio de Rosa,Sp.Rad Radiologist in HNGV Dili, Timor Leste 2 Perspectives on regulatory models.
IAEA International Atomic Energy Agency IAEA Safety Standards for Research Reactors W. Kennedy Research Reactor Safety Section Division of Nuclear Installation.
November 4,  Vermont Yankee Nuclear Power Station (VYNPS) ceased power operations on December 29, 2014 after 633 days of continuous power operation.
Calder Hall Sellafield Decommissioning Martin Adam Heriot-Watt Edinburgh 2008.
 Before a company decides to close it’s power reactors the facility must be put in to a state that no longer has a residual radioactive level, clean.
DECOMMISSIONING FROM THE FRONT LINES HISTORY, EXPERIENCE, AND THE PATH FORWARD Deb Katz Executive Director Citizens Awareness Network Contact: (413)
Rail Shipments July 2004.Page number1 Rail Shipments of Radioactive Waste from Rocky Flats to Envirocare in Utah August 2004.
DECOMMISSIONING OF NUCLEAR POWER PLANTS IN THE CZECH REPUBLIC Peter Lietava Division of Radioactive Waste and Spent Fuel Management State Office for Nuclear.
San Onofre Nuclear Generating Station (SONGS) By Brittany Quon.
Vermont Yankee. Boiling Water Reactor Reactor Building Carbon steel 370 Ci/m3 Concrete 3.8 Ci/m3 Spent fuel pool.
N O L UTI O NS OI ZS LLC An EnergySolutions Company Zion Status Update for Zion Community Advisory Panel. John Sauger – General Manager February 22, 2016.
Control of occupational exposure when working within a reactor containment building at power Matthew Lunn British Energy Generation Ltd. Sizewell B Power.
Decommissioning San Onofre
Analysis of Low Activity Waste Streams and Volumes in Decommissioning NPPs  Lisa Edwards Sr. Program Manager, EPRI LLW Forum April 13-14, 2016.
Decommissioning Issues
John Christian President, Logistics, Processing and Disposal
John Christian President, Logistics, Processing and Disposal
02:21 Full System Decontamination at the Obrigheim Nuclear Power Plant Prior to Decommissioning Wilhelm Kukla, EnBW Kernkraft GmbH, Obrigheim NPP Christian.
Transportation of Radioactive Material in the United States
Radiation Safety Management
Clive 2017 Disposal Update presented by Dan Shrum
Vermont Yankee Decommissioning Update
Janet R. Schlueter Senior Director, Radiation and Materials Safety
CR3 and Crystal River Energy Complex
Pressurized Water Reactor
Nuclear Power Update for The Society of American Military Engineers
Nuclear Waste Storage Current Status and Plans
Clive 2018 Disposal Update presented by Dan Shrum
PRESENTATION OUTLINE Introduction and Background
SONGS Past, Current, and Future State May 4, 2016
Possible Transition from Operating to Decommissioning
Research and Test Reactor Decommissioning Inspections
LL Forum Meeting Richland Washington
November , 2018 State Roundtable Reports Pennsylvania
Research and Test Reactor Decommissioning Inspections
Presentation transcript:

ISOE-Europe 3/25/04 1 San Onofre Unit 1 Decommissioning Eric M. Goldin Eric M. Goldin Southern California Edison Company

ISOE-Europe 3/25/04 2 San Onofre Nuclear Generating Station (SONGS)

ISOE-Europe 3/25/04 3 SONGS 1 History First Generation Westinghouse 3-loop PWR 450 MWeFirst Generation Westinghouse 3-loop PWR 450 MWe Operated January 1968 – November 1992Operated January 1968 – November 1992 ContainmentContainment –1” thick steel sphere –3’ steel-reinforced concrete Sphere Enclosure Building Collocated with SONGS 2 and 3, 1100 MWe eachCollocated with SONGS 2 and 3, 1100 MWe each –CE PWRs, commercial 1983 and 1984

ISOE-Europe 3/25/04 4 SONGS 1 Decommissioning Strategy/Evolution After shutdown (11/92), Operating License converted to Possession Only LicenseAfter shutdown (11/92), Operating License converted to Possession Only License Systems categorized: Required for Operation (RO) or Not Required for Operation (NRO)Systems categorized: Required for Operation (RO) or Not Required for Operation (NRO) Unit placed in SAFSTOR with intention to wait for SONGS Units 2 & 3Unit placed in SAFSTOR with intention to wait for SONGS Units 2 & 3 Early industry experience demonstrated acceptable decommissioning methodsEarly industry experience demonstrated acceptable decommissioning methods 1996 SCE Team investigates Options/Costs/Benefits of commencing D&D in near term1996 SCE Team investigates Options/Costs/Benefits of commencing D&D in near term 1997 Decision to move forward with SONGS 1 D&D planning1997 Decision to move forward with SONGS 1 D&D planning

ISOE-Europe 3/25/04 5 Reduce customer costsReduce customer costs –Lower fuel storage costs –Known LLRW burial costs Reduce an uncertain customer liabilityReduce an uncertain customer liability Decommissioning can be accomplished safely using proven technologiesDecommissioning can be accomplished safely using proven technologies Availability of skilled workforce knowledgeable of SONGS Unit 1Availability of skilled workforce knowledgeable of SONGS Unit 1 Adequacy of Decommissioning Trust FundAdequacy of Decommissioning Trust Fund Basis for Decision to Begin Decommissioning

ISOE-Europe 3/25/04 6 Protection of the spent fuel throughout the decommissioning period until DOE acceptanceProtection of the spent fuel throughout the decommissioning period until DOE acceptance Industrial health and safetyIndustrial health and safety Disposal of radioactive and hazardous waste to the highest standards practical to ensure long term public health and safetyDisposal of radioactive and hazardous waste to the highest standards practical to ensure long term public health and safety Insure compliance (and the public perception of compliance) with all state and federal requirementsInsure compliance (and the public perception of compliance) with all state and federal requirements Perform work in a reasonable and prudent mannerPerform work in a reasonable and prudent manner Project Priorities

ISOE-Europe 3/25/04 7 Major Activities Initial PlanningInitial Planning Separation, Cold and DarkSeparation, Cold and Dark Building DemolitionBuilding Demolition Reactor Internals SegmentationReactor Internals Segmentation Large Component RemovalLarge Component Removal ISFSI Construction, Spent Fuel MonitoringISFSI Construction, Spent Fuel Monitoring License TerminationLicense Termination

ISOE-Europe 3/25/04 8 Limited Real Estate

ISOE-Europe 3/25/04 9

10 SONGS 1 ISFSI Location

ISOE-Europe 3/25/04 11 Control Building Demolition

ISOE-Europe 3/25/04 12 Control Room Panels, Final View

ISOE-Europe 3/25/04 13 Cutting up the Turbine Rotor

ISOE-Europe 3/25/04 14 Reactor Vessel Internals Segmentation

ISOE-Europe 3/25/04 15 ALARA Program Elements Sitewide: Applies to Operating Units and U1Sitewide: Applies to Operating Units and U1 –Job Planning –Dose Controls, Administrative Limits –Temporary Shielding –Pre-job Briefings –Dose Estimates Goal-setting and job performanceGoal-setting and job performance –Mockups and Training

ISOE-Europe 3/25/04 16 Unit 1 ALARA Issues Removed high dose components firstRemoved high dose components first Temporary shieldingTemporary shielding –Greater loading than operating units –Simpler approval process Airborne contaminationAirborne contamination –Reduced beta/gamma component, relative increase in alpha emitters

ISOE-Europe 3/25/04 17 Major Projects and Exposure Totals

ISOE-Europe 3/25/04 18 Radiation Exposure Summary

ISOE-Europe 3/25/04 19 Typical materials for a decommissioning project:

ISOE-Europe 3/25/04 20 LLRW Shipments to date

ISOE-Europe 3/25/04 21 Large Component Removal Reactor Pressure VesselReactor Pressure Vessel –Reactor Pressure Vessel Head Three Steam GeneratorsThree Steam Generators PressurizerPressurizer –S/G and PZR by rail –RPV Head by truck –RPV shipment delayed indefinitely

ISOE-Europe 3/25/04 22 RPV out of Sphere

ISOE-Europe 3/25/04 23 Steam Generator Removal

ISOE-Europe 3/25/04 24 Reactor Vessel Head Lift

ISOE-Europe 3/25/04 25 Disposal of Large Components

ISOE-Europe 3/25/04 26   We know what to do with the Class A and Class B/C waste. None of the waste is unique to decommissioning.   We know how to handle GTCC and Spent Fuel, and what to do with large components.   The new issue is dispositioning the very large volume of potentially clean material.   High cost of surveying, decontaminating materials   No standards for the clearance of potentially contaminated volumetric materials   Routine ALARA programs are adequate for decommissioning, with minor modifications

ISOE-Europe 3/25/04 27 Return to “Forward to the Past”