02:21 Full System Decontamination at the Obrigheim Nuclear Power Plant Prior to Decommissioning Wilhelm Kukla, EnBW Kernkraft GmbH, Obrigheim NPP Christian.

Similar presentations


Presentation on theme: "02:21 Full System Decontamination at the Obrigheim Nuclear Power Plant Prior to Decommissioning Wilhelm Kukla, EnBW Kernkraft GmbH, Obrigheim NPP Christian."— Presentation transcript:

1 02:21 Full System Decontamination at the Obrigheim Nuclear Power Plant Prior to Decommissioning Wilhelm Kukla, EnBW Kernkraft GmbH, Obrigheim NPP Christian Topf, AREVA NP GmbH, Erlangen History of NPP Obrigheim Considerations Decontamination Targets Systems included in decontamination Technical description of the decontamination Results

2 Full System Decontamination at the Obrigheim Nuclear Power Plant
time of construction: – 1968 design two loops 1. criticality: Oktober 1968 thermal reactor power: 1,050 MWth exchange steam generators: operating time: – total gross production: 90,828 TWh capacity factor: %

3 Full System Decontamination at the Obrigheim Nuclear Power Plant
Considerations After final shut down of the NPP - decontamination of primary coolant system - wait until activity is reduced by decay Decision Carrying out decontamination - activity is reduced faster as by natural decay - ensures that the experienced plant personal with intimate system and operating knowledge is still available - functionality and usability of all NPP systems is already given

4 Full System Decontamination at the Obrigheim Nuclear Power Plant
Decontamination Targets: • Reduction of the activity inventory in all systems included in the decontamination • Reduction of the ambient dose rate in working areas • No significant shift of the gamma/alpha ratio • Minimum waste generation • Average decontamination factor of more than 10

5 Full System Decontamination at the Obrigheim Nuclear Power Plant
Systems and components included in decontamination: • Reactor pressure vessel with internals, no fuel • Pressurizer • Primary circuit (two loops) including steam generators as well as part of: • Residuel heat removal system • Volume control system • Emergency injection system • Mechanical filters of the chemical purification system

6 Full System Decontamination at the Obrigheim Nuclear Power Plant
Total volume: m³ Surface total: ,100 m² Is composed of: Incaloy 800 (SG) ,200 m² austenitic weld cladding (primary circiut) ,100 m² austenitic CrNi steel (auxilary systems) m²

7 Full System Decontamination at the Obrigheim Nuclear Power Plant
Additional supporting systems: chemical injection system component cooling system coolant storage building drains spent resin tanks

8 Full System Decontamination at the Obrigheim Nuclear Power Plant
Technical description of the decontamination: AREVA NP GmbH obtained the contract, performance: first quarter 2007 AREVA NP used HP/Cord UV decontamination technology in combination with the AMDA equipment. HP: Permanganic acid (the chemical used for preoxidation). CORD: Chemial Oxidation Reduction Decontamination; represents the chemical decontamination process. UV: Represents the in-situ decomposition of the decontamination chemical with an ultraviolet light source. AMDA: Automated Mobile Decontamination Appliance, is the synonym for the external decontamination equipment of AREVA NP.

9 Full System Decontamination at the Obrigheim Nuclear Power Plant
HP/CORD UV process is a multi-cycle process including following steps: Step 1: Pre-oxidation with HP Step 2: HP reduction with the decontamination chemical Step 3: Decontamination Step 4: UV decomposition of the decontamination chemical and solvent clean-up

10 Full System Decontamination at the Obrigheim Nuclear Power Plant
Results: A total of four HP/CORD UV cycles were performed cation removal kg activity removal E12 Bq (151 Ci) with > 95 % Co60 ion exchange resins m³

11 Full System Decontamination at the Obrigheim Nuclear Power Plant
before: SG 2100 µSv/h; channel head 72 mSv/h after: ,6 µSv/h; ,2 mSv/h

12 Full System Decontamination at the Obrigheim Nuclear Power Plant
Results: Average decontamination factors (DF) DF auxilary systems DF primary system DF steam generators tubing DF overall average Gamma/alpha nuclide ratio: increased about factor 10 Total man dosis mSv Estimated mSv

13 Full System Decontamination at the Obrigheim Nuclear Power Plant
RESULTS - Reduction of the ambient dose rate in the different areas: steam generators residuel heat removal heat exchangers chemical volume control system recuperative heat exchanger - Easy handling for dismantling and disposal of these components, especially for the steam generators

14 Full System Decontamination at the Obrigheim Nuclear Power Plant
RESULTS - No controlled rooms more in this area, the single hot spots were shielded and will be decontaminated in a special prozess - Man-Sv savings for upcoming dismantling acitivities (1 - 1,5 Sv)

15 Full System Decontamination at the Obrigheim Nuclear Power Plant
Thank you for your attention!