H2LC The Hitchhiker's guide to LSA Core Rule #1 Don’t panic.

Slides:



Advertisements
Similar presentations
A Producer’s Guide to Chubb’s SMART Application Platform
Advertisements

Using EU-fin Interactive user manual for coordinators (Using EU-fin to the fullest)
Five Steps in 5 Minutes Close deals faster, more easily, more often! 1.Start a Quote: Input deal amounts and review the available lease options 2.Create.
SAM 2007 v3.0 The Student Experience Including SAM Projects and Course Assess assignments.
Introduction to Online Data Collection (OLDC) Community Based Abstinence Education September, 2009.
HOW TO USE THE SYSTEM Specialty Crop Block Grant Program Online System.
MP IP Strategy Stateye-GUI Provided by Edotronik Munich, May 05, 2006.
Software Summary Database Data Flow G4MICE Status & Plans Detector Reconstruction 1M.Ellis - CM24 - 3rd June 2009.
Health and Wellness for all Arizonans Bureau of EMS and Trauma System Secure, Encrypted, On-Line EMS Services System 2015 Training Programs System Instruction.
GMetrix SMS Testing Center Guide.
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
Defining the Activities. Documents  Goal Statement defines why helps manage expectations  Statement of Work what gets delivered defines scope  Software.
Moving Your Paperwork Online Western Washington University E-Sign Web Forms Copyright Western Washington University, This work is the intellectual.
JVM Tehnologic Company profile & core business Founded: February 1992; –Core business: design and implementation of large software applications mainly.
Quick Reference Guide Welcome TEST USER Version_NSU_ HELP RETIREMENT MANAGER DEMO FEEDBACK.
Intel ® Server Configurator Tool Training Guide. Intel® Server Configurator Tool Enhancements New Website look consistent with Intel style for ease of.
Web Self Service Take Home Message Web Self Service gives CRM information access to assigned non-CRM users.
What is Sure BDCs? BDC stands for Batch Data Communication and is also known as Batch Input. It is a technique for mass input of data into SAP by simulating.
The Trimble Store and Passcodes. Introduction to Trimble Store  This presentation will: –Explain what the Trimble Store offers you –Why you need to be.
W. Sliwinski – eLTC – 7March08 1 LSA & Safety – Integration of RBAC and MCS in the LHC control system.
Event Management & ITIL V3
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
WWWWhat timing services UUUUsage summary HHHHow to access the timing services ›I›I›I›Interface ›N›N›N›Non-functional requirements EEEExamples.
Operational tools Laurette Ponce BE-OP 1. 2 Powering tests and Safety 23 July 2009  After the 19 th September, a re-enforcement of access control during.
RAILINC I ACACSO
Procedures for BARNI. Website Home Page Features BARNI is password protected. BARNI assigns a due date and generates a confirmation with this information.
0 eCPIC Admin Training: OMB Submission Packages and Annual Submissions These training materials are owned by the Federal Government. They can be used or.
Status Report – Injection Working Group Working group to find strategy for more efficient start-up of injectors and associated facilities after long stops.
SIMO SIMulation and Optimization ”New generation forest planning system” Antti Mäkinen & Jussi Rasinmäki Dept. of Forest Resource Management.
Processing Exempt Submissions 1-page Reference Guides.
Mtivity Client Support System Quick start guide. Mtivity Client Support System We are very pleased to announce the launch of a new Client Support System.
LHC BLM Software revue June BLM Software components Handled by BI Software section –Expert GUIs  Not discussed today –Real-Time software  Topic.
Session 1 Introduction  What is RADE  Technology  Palette  Tools  Template  Combined Example  How to get RADE  Questions? RADE Applications EN-ICE-MTA.
Wojciech Sliwinski BE/CO for the RBAC team 25/04/2013.
FGC Upgrades in the SPS V. Kain, S. Cettour Cave, S. Page, J.C. Bau, OP/SPS April
The DIAMON Project Monitoring and Diagnostics for the CERN Controls Infrastructure Pierre Charrue, Mark Buttner, Joel Lauener, Katarina Sigerud, Maciej.
Architectural issues M.Jonker. Things to do MD was a success. Basic architecture is satisfactory. This is not the end: Understanding of actual technical.
Nominal Workflow = Outline of my Talk Monitor Installation HWC Procedure Documentation Manufacturing & Test Folder Instantiation – NC Handling Getting.
VLSC December 2009 Release Release Date: December 7th, 2009.
Avalanche Motorsports
DIAMON Project Project Definition and Specifications Based on input from the AB/CO Section leaders.
V. Kain – eLTC – 7March08 1 V.Kain, S. Gysin, G. Kruk, M. Lamont, J. Netzel, A. Rey, W. Sliwinski, M. Sobczak, J. Wenninger LSA & Safety - RBAC, MCS Roled.
Final Report – Injector Re- Commissioning Working Group (IRWG) Working group to find strategy for more efficient start-up of injectors and associated facilities.
LHC Section Meeting 1.eLogbook 2.LHC Controls Security Panel.
Systems, their relations & information. Concepts and Status of the new central service for tracking relations between CERN accelerator systems TE/MPE TM.
CO Timing Review: The OP Requirements R. Steerenberg on behalf of AB/OP Prepared with the help of: M. Albert, R. Alemany-Fernandez, T. Eriksson, G. Metral,
TE/TM 30 th March - 0v1 CERN MPP SMP 3v0 - Introduction 3 *fast *safe *reliable *available generates flags & values.
PC Current Interlocking for the SPS Fast Extractions. 1 J. Wenninger July 2009.
3M Partners and Suppliers Click to edit Master title style USER GUIDE Supplier eInvoicing USER GUIDE The 3M beX environment: Day-to-day use.
Industrial Control Engineering Session 1 Introduction  What is RADE  Technology  Palette  Tools  Template  Combined Example  How to get RADE 
Text2PTO: Modernizing Patent Application Filing A Proposal for Submitting Text Applications to the USPTO.
E. Hatziangeli – LHC Beam Commissioning meeting - 3 rd March 2009.
Software tools for digital LLRF system integration at CERN 04/11/2015 LLRF15, Software tools2 Andy Butterworth Tom Levens, Andrey Pashnin, Anthony Rey.
How to complete and submit a Final Report through Mobility Tool+ Technical guidelines Authentication, Completion and Submission 1 Antonia Gogaki IT Officer.
LSA Core overview 6 / 11 / 2007 Wojciech Śliwiński (AB-CO-AP) on behalf of LSA team.
How to complete and submit a Final Report through
Fabio Follin Delphine Jacquet For the LHC operation team
Annual Performance Management Cycle Management Training Tutorial
What’s Changing in Research Administration?
Sourcing Event Tool Kit Multiline Sourcing, Market Baskets and Bundles
Control system network security issues and recommendations
Computing infrastructure for accelerator controls and security-related aspects BE/CO Day – 22.June.2010 The first part of this talk gives an overview of.
WorkIT SQA Work Placement Units & Pupil Questionnaires.
Server Concepts Dr. Charles W. Kann.
INTRODUCTION.
Electronic Products Workshop Division of Air Resource Management -DEP
BLM settings management in LSA
LHC BLM Software audit June 2008.
Geant4 Documentation Geant4 Workshop 4 October 2002 Dennis Wright
Presentation transcript:

H2LC The Hitchhiker's guide to LSA Core Rule #1 Don’t panic

Nov. 9th 2007LHC Machine Checkout - LSA Core2 Introduction LSA control system helps OP managing accelerators settings. But it is also providing advanced features and interfaces to ease operation Some features are included from the beginning, others are still being developed.

Nov. 9th 2007LHC Machine Checkout - LSA Core3 References LSA Project Homepage LSA work in progress for LHC LSA Wiki page FESA Home page JAPC Wiki page MCS page RBA Wiki page RBAC Wiki page

Nov. 9th 2007LHC Machine Checkout - LSA Core4 Overview LSA Core infrastructure New features for LHC Settings User groups RBAC MCS Pending issues

Nov. 9th 2007LHC Machine Checkout - LSA Core5 Overview LSA Core infrastructure New features for LHC Settings User groups RBAC MCS Pending issues

Nov. 9th 2007LHC Machine Checkout - LSA Core6 LSA Core Infrastructure LSA Core within Control System LSA DB User Interfaces (Trim, Equip state…) You are here LSA Core RBAC JAPC CMW LHC FESA SISETC… JAPC RDA MCS

Nov. 9th 2007LHC Machine Checkout - LSA Core7 LSA Core Infrastructure Detailed Schema

Nov. 9th 2007LHC Machine Checkout - LSA Core8 LSA Infrastructure “Rules” Simple Example: SPS/Momentum On SFTPRO cycle Parameter type 0 ms 9000 ms Momentum IREF Make rule Incorporation rule Link rule 0 ms 9000 ms ms Definitions : Make rule : Algorithms to convert a source parameter setting into its dependent parameter settings. E.g. conversion of Momentum (P) into current sent in the main bending magnets. Incorporation Rule : When we trim end points of a function, we have to ensure the continuity between point of the same settings. Incorporation rules are here to ensure this role. (NB: in case of PDOT or BDOT functions, they also ensure that the integrated sum remains at 0 value) Link rule : Generate link settings on the lower level (most often current level) between one cycle and its following. As high level parameters have settings only when beam is in the machine, link rules complete missing part of the functions between cycles.

Nov. 9th 2007LHC Machine Checkout - LSA Core9 LSA Core Infrastructure Summary LSA Core is well integrated within control system… Use of CMW tools (FESA, JAPC) Manages transactions with database but also with hardware. Provides access to settings via JAPC … And is a good base to develop interface on top of it (you just need to depend on lsa-app- selection package and you get all Core functionalities)

Nov. 9th 2007LHC Machine Checkout - LSA Core10 Overview LSA Core infrastructure New features for LHC Settings User groups RBAC MCS Pending issues

Nov. 9th 2007LHC Machine Checkout - LSA Core11 New features for LHC Settings For more details, report to Lasse’s talk LSA Settings infrastructure is already quite known from SPS experience (generation, trim, makerules…) However due to LHC being a collider and not a cycling machine, new functionalities have been added Actual settings Fidel (reproduce the logic of auto-trim but correction is done automatically) Management of non-multiplexed settings (  non-PPM) Remaining tasks : Implementation is ongoing well, many tests have been performed. Tests by OP should follow ASAP.

Nov. 9th 2007LHC Machine Checkout - LSA Core12 New Features for LHC Users groups Another layer for parameters tree Requested by equipment specialists  to help them retrieving easily their own parameters. Has already been transparently implemented in SPS. Parameters are now filtered per user group, system, type and, finally, per name. Interesting idea but : This could reduce machine status visibility (by applying this kind of filter, operator could miss important information) It could get confusing to retrieve one selves between User groups, RBAC, MCS… Remaining tasks : OP should validate this new functionality and provide feedback about its use.

Nov. 9th 2007LHC Machine Checkout - LSA Core13 New features for LHC Role Based Access Control (RBAC) Another way of filtering rights, parameters and settings For applications integrating RBAC, a login window should appear (using NICE accounts) Depending on the rights granted to your account, you shall be authorized to perform certain types of actions (view, edit a setting…) Remaining tasks Development is achieved and ready to be used No user application using RBAC so far Need to be tested in operational conditions

Nov. 9th 2007LHC Machine Checkout - LSA Core14 New features for LHC Management of Critical Settings (MCS) Purpose : Only identified specialist can change a critical setting from a dedicated application Need authentication checking Should forbid changes coming from other CO interface (like FESA Navigator) Each setting has its own signature attached The signature is encrypted via an algorithm taking into account setting’s value and a public key. On the front end level, a change of setting can only be accepted if the new value and its signature matches Remaining tasks On LSA Core side, implementation is complete Is Critical Systems list complete yet? On User Interface side, everything has to be done User identification using RBAC? Same interface than for other settings? If yes how do we manage parameters space?

Nov. 9th 2007LHC Machine Checkout - LSA Core15 Overview LSA Core infrastructure New features for LHC Settings User groups RBAC MCS Pending issues

Nov. 9th 2007LHC Machine Checkout - LSA Core16 Pending Issues BLM Threshold implementation (see Laurette and Fabio’s talk) Parameter space within LSA not defined yet OP Use cases to be defined User interface to be written Settings Copy Should it take into account user groups? Should we automatically copy Critical Settings? How to handle non-multiplexed parameters? Actual settings integration. User interface to be developed. Integration with timing?

Nov. 9th 2007LHC Machine Checkout - LSA Core17 Conclusions LSA Core is meant to meet OP requirements A large pool of LSA developers is in OP We can already take benefit from SPS experience LSA Core is flexible enough to include new functionalities and improve the existing ones Building new interfaces using LSA requires some investment but, as you know, “good operation software is made by operation” Most of the new features is almost complete and can be tested Core functionalities are implemented We could either try and use existing GUIs or develop our owns We should also stay in contact with new functionalities BLM Thresholds edition (do we agree with what we’ve been proposed?) Settings copy for LHC, specifications would be welcome A review of “access to settings, who do what and what can we see?” would be interesting.