GIF++ implementation Adrian Fabich, Sylvain Girod, EN-MEF-LE Technical meeting with Supplier of Irradiator, 3 rd October 2013.

Slides:



Advertisements
Similar presentations
EDMS November th LHC Radiation Day RAMSES Induced Activity Monitors 5 th LHC Radiation Day CERN - 29 November 2005 RAMSES Induced Activity.
Advertisements

13 Oct 2005 ICALEPCS RAMSES: The LHC RAdiation Monitoring System for the Environment and Safety G. Segura CERN on behalf of the RAMSES team.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
16.Feb.2005MC meeting, LBNL1 CERN infrastructure A.Fabich, CERN AB-ATB All information available at
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
RD51 Common Test Beam: Status RD51 collaboration week Kolymbari, June 2009 Yorgos Tsipolitis NTUA.
Gas systems for GIF++ 14/02/2015 Ernesto Regaño 1.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
Patrick Thornton, SNS/FPE June 9, 2008
GIF++ ACCESS SYSTEM Dorothea Pfeiffer GIF++ Project Meeting Thanks to: V. Martins De Sousa Dos Rios, D. Vaxelaire, D. Haasler.
May Exp-Area meeting1 Safety Systems Installation status Flammable Gas Detection System Fire Detection System in SG8 ODH Detection System CO2 Detection.
REPORT VISIT SAPHYMO Dorothea Pfeiffer GIF++ Project Meeting
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
GIF++ gas systems 21/01/2014Ernesto, Roberto PH-DT-DI gas service1.
FUNCTIONAL SPECIFICATION Dorothea Pfeiffer Dennis Haasler GIF++ User Meeting
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
CMS Muon Chambers Long term studies at GIF++ Andrey Marinov On Behalf of Long Term Studies of the CMS Muon Detectors 1.
First AWAKE dump calculations Helmut Vincke. Beam on dump Muon axis inside and outside CERN Distances: Beam impact point to end of West hall: ~300 m Beam.
Eric Thomas - Safety systems for LHC experiments 1 Safety Systems for LHC experiments Baseline specifications – Additional needs – Actions taken.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
ST/MAforLHC April 2003Sixth ST workshop1 Summary of ST/MA deliverables for LHC Luigi Scibile for the ST/MA group.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
Test beam setup: status report 31/03/2009 M. Alfonsi (CERN)
East Area, M2, K12 Lau Gatignon / EN-MEF, EATM
CMS Muon detectors for the GIF++ DRAFT Needs discussion within CMS Muon community A. Sharma.
GIF++ gas systems 11/07/2014Ernesto, Roberto PH-DT-DI gas service1.
K.Gadow CALICE technical review 1 Move to FNL ECAL/HCAL-Movable Table Setup test beam integration to Fermilab MT6-B3/B4.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
GIF++ The new Gamma Irradiation Facility at CERN Physics Department Detector Technology Group 29/06/12R. Fortin PH-DT-DI1 Procurement of the 10TBq 137.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
Horst Breuker ADUC Jan Safety and Radio Protection, Consequences for the Experiments ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive,
Radiation Protection studies for the Linac4 / Linac2 interface Joachim Vollaire, DGS-RP 28/09/2015 Linac4 Coordination Meeting.
Overview on the Proposal for a new Gamma Irradiation Facility at CERN GIF++ Mar CAPEANS April 29 th, 2009 April 29, 091M.C.
8/4/2015R. Guida PH-DT-DI1 Info 1)Air conditioning system Status: Adrian Fabich contacted CV and he is waiting for info. Today I’m going to meet experts.
Radiation Protection Considerations for the CDR Helmut Vincke DGS-RP.
Status of n_TOF Facility
Mixed field irradiation -- Who answered ?  In total 36 forms filled / 34 persons answered: 38% 62% CERN: mainly LHC related topics CERF: beside LHC topics.
Overview on the Proposal for a new GIF, August Page 1 Overview on the Proposal for a new GIF Summary of the document distributed to the users and.
External Data and DIP Oliver Holme 18 th January 2008.
Status of GIF++ Adrian Fabich, Dorothea Pfeiffer, EN-MEF-LE EATM, 27th August 2013.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
GIF++ The new Gamma Irradiation Facility at CERN Physics Department Detector Technology Group 22/08/12 Project #5R. Fortin PH-DT-DI1 Status of procurement:
GIF++ The new Gamma Irradiation Facility at CERN Physics Department Detector Technology Group 25/07/12 Project #4R. Fortin PH-DT-DI1 Status of procurement:
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
GIF++ implementation Adrian Fabich, Sylvain Girod, Dorothea Pfeiffer, EN-MEF-LE GIF++ 3rd users’ meeting, 11th July 2013.
GIF in EHN1 - Vision 112/02/2014A. Fabich, EN-MEF-LE.
GIF completion status Adrian Fabich, EN-MEF-LE on behalf of the GIF project team GIF users meeting, 14 th January 2015.
… getting there … 112/02/2014A. Fabich, EN-MEF-LE.
Test beam check list Michael JECKEL EN-EA-EC. Content: Safety & Radiation Protection Arrival Access Installation Departure Michael JECKEL EN-EA-EC.
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
US CMS Phase 2 R&D Discussion 30-July-2013 “Phase 2 muon R&D” J. Hauser, UCLA  Expected wire accumulated charge at 3000 fb-1 for various chamber types.
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
H4 beam line for GIF Adrian Fabich, EN-EA-LE GIF users meeting, 17 th February 2016.
The Next Generation of a Gamma Irradiation Facility GIF++
EHN1 Cryogenics Integration
PERSONAL SAFETY INTERLOCKS External EHS Expert Panel Workshop
EHN1 Extension North Side wall (Removal of Existing services & platforms) Michael Jeckel & Bastien Rae.
CENF – Personnel Protection System Preliminary Study
CENF – Personnel Protection System Preliminary Study
News from Integration WG
RD51-WG X June test beam experience: useful information for October
Radiation protection of Linac4 M. Silari Radiation Protection Group
Collimator Control (SEUs & R2E Outlook)
MERIT Review Meeting Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug
Experimental Areas – LS2 planning
Access Control for CERN Experimental Areas
Presentation transcript:

GIF++ implementation Adrian Fabich, Sylvain Girod, EN-MEF-LE Technical meeting with Supplier of Irradiator, 3 rd October 2013

Contents 2 Gamma Irradiation Facility GIF++  Layout  Technical infrastructure  Operation  Radiation protection  Safety 03/10/2013A. Fabich, EN-MEF-LE

The present GIF in the West Area 3  Present GIF installed in former West Area  Since 2004 secondary (muon) beam de-commissioned  Since then only of limited use for physics  Limited photon yield (137Cs, 650 GBq installed in `90s)  Limited space for increasing number of users  GIF will be decommissioned with the new GIF++ being operational. 03/10/2013A. Fabich, EN-MEF-LE West Area

H6 beam line H2 beam line H4 beam line H8 beam line GIF++ GIF++ location in EHN1 (North Area) 403/10/2013A. Fabich, EN-MEF-LE West Area EHN 1

503/10/2013A. Fabich, EN-MEF-LE

GIF++ layout (1) 603/10/2013A. Fabich, EN-MEF-LE dump secondary beam PPE (entrance) MAD PPG PPX (only emergency) dump gas mixing zone Preparation zone cable trays to control room Irradiation area

GIF++ layout (2) 703/10/2013A. Fabich, EN-MEF-LE secondary beam  -field 2  -field 1 shielding preparation zone gas mixing zone shielding ±37° cut view at 2m height PPE PPG PPX

Large material access 03/10/2013A. Fabich, EN-MEF-LE8

Irradiation field (1) 03/10/2013A. Fabich, EN-MEF-LE9

Irradiation field (2) 03/10/2013A. Fabich, EN-MEF-LE10

Secondary muon beam 11 From T2 target 99% of beam are within 10 cm x 10 cm, remainder spread over 1 m 2  Main user mode: couple of periods per year with each about two weeks duration  Parasitic mode with muons: as much as possible (based on experience from previous years, one can expect parasitic muon beams for about 30-50% of the beam time, equivalent to about 2-4 months/year).  Few periods per year of approximately two weeks duration in which a beam pipe is installed within the facility and electron beam is taken by CMS ECAL downstream from GIF++ 03/10/2013A. Fabich, EN-MEF-LE

General infrastructure 12  Electricity: 50 kW  light (+emergency)  Ethernet  cabling, cable trays  demineralised water  NO cryogenics  Beam equipment  Beam instrumentation  Gases  Neutral and mixtures (containing flammable gases)  15 gas supplies from the gas hut (build. 909)  10 patch panels in bunker/preparation zone  Each for 4 neutral and 4 hazardous gases  Cooling and ventilation  Optional  Supply lines should mainly be installed in the raised floor. 03/10/2013A. Fabich, EN-MEF-LE Measurements: autumn 2012 – spring 2013 (courtesy: R. Guida)

Source Ground - Trigger Cable Trays False Floor: permanent supplies 1303/10/2013A. Fabich, EN-MEF-LE Dennis Haasler Same concept in preparation area 40 cm free height Reducing the source height to 2 meter

1403/10/2013A. Fabich, EN-MEF-LE

Personnel and Material Access  PPG, Roof: If opened, patrol lost  PPE & Turnstile: Access rights of people checked, key released and people counted  PPE2: Key that was taken at turnstile has to be used in key access mode (patrol not lost)  MAD: access for material up to PC size 03/10/201315A. Fabich, EN-MEF-LE Personal Protection Exit Personal Protection Gate Personal Protection Entry PPE & Turnstile Pre Zone Small material access

GIF++ control room  HNA /10/2013A. Fabich, EN-MEF-LE16 GIF++

Cables irradiator – using PPE and gallery 03/10/ m Irradiator HNA 487 Cable tray height 2.5 m Roof height 4.8 m Under floor height 0 m A. Fabich, EN-MEF-LE17 D. Pfeiffer

Cable routing – shortest to control room 03/10/2013 ca. 70 m HNA 487 Cable tray height 2.5 m Roof height 4.8 m Under floor height 0 m A. Fabich, EN-MEF-LE18 D. Pfeiffer

Photon yields to muon detectors 1903/10/2013A. Fabich, EN-MEF-LE roof chamber Average flux 1.0 e5 s^-1 cm^ -2 floor chamber Average flux 1.2 e3 s^-1 cm^ -2 Downstream beam trigger: average flux 1.8 e4 s^-1 cm^ -2 Upstream beam trigger: average flux 5.9 e4 s^-1 cm^ -2 fine tracker Average flux 5.1 e5 s^-1 cm^ -2 D. Pfeiffer

Trapezoid shaped collimator yz 2003/10/2013A. Fabich, EN-MEF-LE Point source Cylindrical source No difference between point and cylindrical source D. Pfeiffer

Safety responsibility for implementation 21 with SBA (together with CERN expert groups)  Radiation shielding  Flammable gas detection and ODH (in bunker)  Fire detection  Access system/personnel protection  Interlock(s), also with irradiator  Gas zone: ATEX conform (PH) 03/10/2013A. Fabich, EN-MEF-LE

GIF++ irradiation zone 22 The irradiation zone hosting the irradiator  is a controlled area (PPE154).  inside a supervised area (EHN1).  No risk of activation due to low intensities of secondary beam  Presence of high intensity photon source requires additional precautions due to the prompt radiation levels:  Extended shielding  Access system  Entrance chicanes 03/10/2013A. Fabich, EN-MEF-LE

Radiation levels 23  Keeping lateral exterior limit well below 3  Sv/h  At least 80 cm concrete  Accordingly adapted chicanes  Roof (no stay area) shielding adjusted for < 15  Sv/h  Final design based on these conceptual shielding studies 03/10/2013A. Fabich, EN-MEF-LE horizontal cut at source height ( 2m) 160 cm

Radiation shielding 24  Shielding blocks  Double layer closing the block joints  Roof gaps closed with dedicated iron beams  Chicanes for entrances 03/10/2013A. Fabich, EN-MEF-LE  -field 2  -field 1 Vertical cut view Top cut view 160 cm max. 3  Sv/h max. 15  Sv/h max. 3  Sv/h

Radiation protection 25  RP monitoring  Inside the irradiation area  Monitoring of the source operation  Dedicated RP monitoring  2 redundant ionization chambers connected to RAMSES  Veto to the source operation  In the surrounding EHN1 area  Monitoring by existing beam monitoring (EHN1 standard) Access system  EHN1 standard  Access safety elements compliant with SIL3  Single Access System (SAS) for counting persons in the area. 03/10/2013A. Fabich, EN-MEF-LE

Operational controls 26  Users’ interface: CESAR  For personnel access and beam control Standard HW/SW integration into SBA controls environment  Access controls  Beam controls  Safety elements  Irradiator provided with its own console. Only link to SBA controls via veto line and status logging. 03/10/2013A. Fabich, EN-MEF-LE

Safety conditions for active irradiator 27  Exclude direct exposure to  -source  Source out of parking position only possible if  GIF++ access chain is CLOSED  AND (protecting in upstream zone)  Upstream beam dump is IN-BEAM  OR  PPE144 is CLOSED (no access)  AND (protecting in downstream zone)  Downstream beam dump is IN-BEAM  OR  PPE164 is CLOSED (no access)  AND (no alarms)  No fire  No power failure  No emergency stop button  Irradiator controls included in industrial delivery.  Veto from CERN safety chain will force source into parking position. 03/10/2013A. Fabich, EN-MEF-LE upstream dump downstream dump

Conclusions 28  3D model of GIFF++ is available  Require design documents of irradiator+filter system  Approved status  CERN will study the mechanical integration 03/10/2013A. Fabich, EN-MEF-LE