16 Point Action Plan for Maintenence of AC COACHES.

Slides:



Advertisements
Similar presentations
Safety Absolutes Green Lake
Advertisements

STRATEGY ON THE MANAGEMENT OF THE BIOMEDICAL WASTE Health Care Waste Management (HCWM) Regional Approach Ohrid, Ana Petrovska.
Cash Collection and Deposit Training Financial Services.
MECHANICAL DEPARTMENT
SE429 Maintenance Planning and Control.
National Committee for the Certification of Radiation Protection Officer SAFETY AND WORK PROCEDURE IN SALES OF RADIOACTIVE MATERIAL AND IRRADIATING APPARATUS.
Condensation Piping and Installation Drain Pans
QUALITY ASSURANCE Work Load. Workload is the sum of the work achieved or to be achieved, obtained by multiplying the raw count of each individual procedure.
PowerCare Customer Support Agreement LP Products and Systems 2013 PM.
THE SUBSTITUTE TEACHER. Your Role is Critical On any given day 10% of American classrooms have substitute teachers. 5-10% of a students educational career.
Obligations of the Company
BUS DRIVER RESPONSIBILITIES: Inform parents of bus number, bus schedule, bus rules and emergency procedures. Inform parents of your name and phone number.
CBER Irradiated Blood Components Jennifer Jones Consumer Safety Officer CBER, OBRR, DBA September 16, 2009.
ESSENTIAL SAFETY MEARURES IN BUILDINGS PRESENTED BY: BRUCE HOWIE.
The Sports Medicine Team & Defining Their Roles
Charging system PT 1 LSy_w.
Managing a computerised PO Operating environment 1.
Eastern States Student Exchange, Inc. (ESSEX) ESSEX 7/06 Dept of State 22 CFR Part 62 Revisions April 4, 2006.
Cold Chain Surveillance Coordinator Provincial EPI cell.
Chapter 14: Inspection and Maintenance
DMV Chapter 1. 6 Point Verification There are four requirements for 6 Point ID Verification: At least one Primary ID At least one Secondary ID Verifiable.
WELCOME TO TRAINING PROGRAMME FOR CONSULTANTS’ SERVICES FOR 3 rd PARTY QUALITY CONTROL AND QUALITY ASSURANCE G. PRABHAKAR.
Managing Computerised Offices Operating environment
GWS SMS INTRODUCTION EMS Manual. 3. PROCEDURES FOR BILGE AND WASTE OIL MANAGEMENT OF MACHINERY SPACES As far as possible, the OWS must not be used.
Operating and maintenance of generator. Operating Generator If it is manually operated generator, whenever power goes off, before starting the generator,
Using the Logical Framework to Develop Activity and Resource Schedules.
Best Practices for Banking MSBs
Emergency Management & Business Continuity Plan Odyssey House of Utah Last Update: March 2010
Mobile Audio/Video Recording Equipment Policy and Procedure Number PP
Green Initiative on Rail Coaches – A case study of Northern Railway.
1 Canadian Quality Milk Program. 2 DFO Perspective on CQM  HACCP resonates well with consumers  CQM implementation to ensure consumers’ opinion of farmers.
MODU Safety Committee Objective The objective of this Procedure is to establish the terms of reference for the Safety Committee on board the MODU.
Project Tracking and Monitoring QMS Training. 2 Objective To track and monitor the progress of the project and take appropriate corrective actions to.
E8 / PPA Solar PV Design Implementation O&M Marshall Islands March 31-April 11, Preventive Maintenance.
Crime Scene Investigation. Basic Premise The actions taken at the onset of an investigation are vitally important to the successful resolution of the.
Cctv Management Solution - CMS From – Intelitech Solutions Pvt. Limited. [ ITSPL Group ]
1 Book Cover Here Copyright © 2015, Elsevier Inc. All rights Reserved Chapter #16 Orientation for Security Officers Security Supervision and Management.
Coaching stock.
Unit 304 Preparing the Patient for Retinopathy Screening By Jenny Gaffney & Jean Macpherson.
Sr.Panchavarnam.  The theatre manager is responsible for the effective day to day running of the theatre, and maintaining high standards.  Responsibilities.
1. 1.History Of Indian Railway 2.Types of Traction System 3.Non Electric traction system coaches 4.System Of Track Electrification 5.Power Supply For.
A Training Presentation On TRAIN LIGHTING
Test Programme for AC coaches
Joe Stapinski Senior UST Inspector (317)
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
Science Safety: Elementary Teacher Legal Considerations.
A Health and safety law training programme for employers This programme has been set up to guide employers on some of the basic H&S legislation in the.
Logo Here 1 This slide deck has been designed for the Rhode Island Department of Health as apart of the Senior Resiliency Project. The intent of this training.
Table 1. The Five Medical Laboratory Case Studies Jan Martin et al. Transnational Evaluation of a New Continuing Professional Development Activity for.
RSA Marshals NSW Office Of Liquor Gaming and Racing NSW Police Force.
Health and Safety at Work. Health and Safety at Work Act 1974  Employers have a duty to ensure the health, safety and welfare of the employees as far.
POWER SUPPLY IN A/C COACHES The power supply technology used in train interiors have indirect coupling with axle. This makes system lesser efficient and.
Using a Digital Data Logger North Carolina Immunization Program (NCIP)
A Guide to the Establishment Control Process Last update – 25/06/14 (Kate Toone)
Emergency Preparedness. Proposed Emergency Preparedness Rules NFR/LMC §19.326(a) deleted and moved to § for Emergency Preparedness Rules Places.
Cooling Tower Audit Nathan Maple City of Marion. Why do we undertake an audit and sampling? Regulation 15 South Australian Public Health (Legionella)
VEHICLE SAFETY. INTRODUCTION VEHICLE MEANS ANY MOTORIZED EQUIPMENT USED FOR THE TRANSPORTATION OF A PERSON / PEOPLE OR CARGO. INCLUDES CARS, TRUCKS, BUSES,
Radiation Symbol Radiography.
DUTIES OF AC COACH ESCORTING STAFF (AC Coach Attendants)
LOLER in Residential Care Homes 27 September 2017
EPO′s QMS Piotr Wierzejewski Quality Management February 2018.
Emergency Electrical Power Supply for Buildings
Confined Space (Permit-required)
OHS–Occupational Health & Safety
Science Safety: Elementary Teacher Legal Considerations
Cash Collection and Deposit Training
SAFE WORK INSTRUCTIONS
Process Safety Management
Presentation transcript:

16 Point Action Plan for Maintenence of AC COACHES

16 POINT ACTION PLAN ON MAINTENANCE OF AC COACHES 1.CESEs of the Railways to interact with their counterparts in other Railways to advise the unusual occurrences and obtain feed back. 2.All the AC coaches to be pre-cooled before placement of rakes on platform. This is the time when passengers require maximum and immediate comfort level. Pre- cooling cum emergency leads should be provided in all SG AC coaches (1 in each coach) and power cars (2 in each power car).

16 POINT ACTION PLAN ON MAINTENANCE OF AC COACHES 3No train to leave the Primary Depot with EFTs or equipments in isolated condition. 4Defects in the coaches to be noticed immediately after arrival of train and remedial action taken accordingly. Escorting staff should report at secondary maintenance depot and advise the status of coach and should sign the register with Depot and Depot staff to sign the Log Book with Escorting Staff.

16 POINT ACTION PLAN ON MAINTENANCE OF AC COACHES 5All AC coaches from Primary depot should go with both Alternators working. If an Alternator cannot be replaced/repaired at the secondary maintenance depot, decision to send coach with one Alternator to be taken at officer's level. Second Alternator to be fully functional with full generation and the coach/ rake to be properly pre-cooled. 6AC coaches should go from Primary Depot with 6+6 belts on the Alternators and minimum 5+5 from Secondary Depot. Adequate facilities to be built up for changing the belt on rake itself.

16 POINT ACTION PLAN ON MAINTENANCE OF AC COACHES 7The knowledge of all the ACCIs & ACCAs should be checked regularly regarding operation of the AC coach equipment as well as handling of the situation in case of failure of the equipment. ACCIs/ACCAs MUST maintain the log book and enter all the unusual occurrences. Training of AC staff of one week duration to be standardised by the Railways. 8Drive system for generation testing and Regulator setting to be introduced for alternators at all Primary Depots.

16 POINT ACTION PLAN ON MAINTENANCE OF AC COACHES 9Unit Exchange Spares (UES) should be available in all depots. Each depot should have authorised holding of UES. Register should be available for each major UES at all the depots. 10 All the major depots should carry out failure analysis of major equipments and the information should be sent to RDSO periodically.

16 POINT ACTION PLAN ON MAINTENANCE OF AC COACHES 11 The power supply system for pre-cooling to be augmented in view the increasing number of AC coaches in the depots. Railways to examine and take corrective action. 12 Railways to revise their EACs (Estimated Annual Consumption) of the material because of increasing AC Coach holding.

16 POINT ACTION PLAN ON MAINTENANCE OF AC COACHES 13 Cleating of alternator field and phase wires to be properly checked at primary depot. 14 Full load and no load voltage of each cell of SMF batteries to be recorded (weeded out weak cell) every month for subsequent 3 months and if there is no abnormal variation in voltage, it should thereafter be recorded once in 3 months.

16 POINT ACTION PLAN ON MAINTENANCE OF AC COACHES 15 Working of thermostat should be monitored and recorded in log book. If thermostat is not found in working condition, the same should be attended/replaced by primary depot. 16 Working of WRA should be checked on arrival of train at primary/secondary depot and its working should be ensured before placement of rake at the platform.