B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 1 PXD Ladder Assembly - Conceptual design of jigs -

Slides:



Advertisements
Similar presentations
Liverpool LHCb Planning. April (2001) –Clean room (production facility) handover and qualification (April 19) (delayed to May 10) –Thermal model Results.
Advertisements

Clean Room Plans Monday, August 23, Hybrids--- Frames--- SensorsModules.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
ATLAS Module building at Glasgow
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Construction and Status of the Origami Module Prototype C. Irmler HEPHY Vienna.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
Status and outlook of the Medipix3 TSV project
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
Hybrid Integrated Circuit
Receive processed un-thinned wafers from E2V. Processed for bump bonding (dice, bump and attach read out chip)
Slide 1Susanne KyreTracker week, October 2005 TEC/TOB bias bonds Susanne Kyre University of California, Santa Barbara.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
M. Gilchriese Module Assembly and Attachment at LBNL M. Gilchriese for F. Goozen April 2000.
Silicon /pcb assembly R Thompson, J Freestone LAL 3 June 08.
Construction and Test of the First Belle II SVD Ladder Implementing the Origami Chip-on-Sensor Design 29 Sept TWEPP 2015, C. Irmler (HEPHY Vienna)
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
11/05/2000Wire Chamber Working Group Visit to Fermilab Participants: –Giulio Auriemma, Thomas Schneider, Burkhard Schmidt General Remarks: –Visit was organized.
Hybrid Mechanical/Thermal Design Ray Thompson / Manchester FP420 meeting Torino 11/12 July 06.
FVTX Wedge Assembly WBS , , , , , David Winter Columbia University FVTX Wedge Manager.
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
David Bailey Gluing. Silicon /pcb assembly Previously Using Sony Robot and precision dispenser Have established acceptable glue dot parameters Dot electrical.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
CERN SPD meeting, 4/06/2002V. Manzari for Bari SPD-Group1 Half-stave assembly Gluing procedure & glue characteristics Status of dummy components.
Dec
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
1. Take HV harnesses with label (IHV2) and transfer on the Stacking table. 1.1 Inspect HV harnesses visually. 2.1 Insulate HV Flex with 3M™ VHB™ Tape.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
DEPFET Workhop, Ringberg, June Ladislav Andricek, MPG Halbleiterlabor Lessons learned from EMCMs assembly status - next steps.
Thinning and Interconnection DEPFET Meeting, Valencia, Sept Ladislav Andricek, MPI für Physik, HLL  update on thinning  samples for thermal mock-ups.
July 19, 2012 Anna Peisert1 CERN/Taiwan/Helsinki production center Work share Institutes/people Status of preparations.
7th PXD/SVD Workshop, Prague, January 2015 Rainer Richter, MPG Halbleiterlabor 1 Pilot Run - Status and Plans PXD9-6 Rainer Richter for the MPG Halbleiterlabor.
Next chance for Service test. In the next B2GM Use of old VXD KEK The screw connection may not work. -> double scotch tape for PXD PP mock 1/4.
News on Mechanical Design Dirk Wiedner July /4/20121Dirk Wiedner Mu3e meeting Zurich.
HGC Cassettes Jim Freeman September 17, Director's Review -- Calorimetry – HGC Cassettes Jim Freeman, 2015 Sept 17.
VXD Workshop, Valencia, Jan Ladislav Andricek, MPG Halbleiterlabor 1 pilot module assembly - lessons learned -
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
L5 Assembly Plans in Vienna 5 February 2013 Christian Irmler (HEPHY Vienna) 3 rd PXD/SVD Workshop Wetzlar, Germany.
Hans-Günther Moser, PXD PXD Summary 1 PXD Sessions: Highlights 1)Sensor production 2) EMCM (& bump bonding) 3)System Simulations 4)Power Supplies and Services.
B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 1 PXD Module Assembly - Overview and SWB bumping -
On-Module Interconnection and CNM Projects DEPFET Meeting, Bonn, February Ladislav Andricek, MPI für Physik, HLL  update on thinning  samples.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
PXD ASIC Review, July 2015 Ladislav Andricek, MPG Halbleiterlabor Belle II PXD ASIC Review, the 2 nd …….. 1.
Thoughts about PS module assembly Ulrich Heintz, Meenakshi Narain, Bill Patterson, Eric Spencer, Juan Trenado Brown University, Providence 4/16/2015Heintz,
DEPFET workshop, Kloster Seeon, May 2014 Summary 1 Highlights Technical Coordination TB report schedule remarks.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
DEPFET Workshop, May 2016 Ladislav Andricek, MPG Halbleiterlabor 1 o Documentation o Transition to “Production Mode” o Please update docu and place it.
BM&N STS ladders assembly in VLHEP
Switcher (SWB) bumping
ATLAS pixel module assembly flow
Thinning and Plans for SuperBelle
Service channels between Tracker and PP1
Ladder Assembly All tools and jigs produced Glue dispensing works
The CSOI approach for integrated micro channels
Katsuro Nakamura Sep. 10, 2015 VXD meeting
Ladder Assembly All tools and jigs produced Glue dispensing works
Carbon wire sensor based in semiconductor strain gauges
Mechanics: (Tim).
PXD Summary Tests PXD9 Pilot Production ASICs Components Plans:
Gluing jigs for Demonstrator
Equipment for Assembly – UK Experiences
Module Production and Testing at Duke
Module/Ladder Assembly
Presentation transcript:

B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 1 PXD Ladder Assembly - Conceptual design of jigs -

The Mission B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 2 Join two modules to one ladder Modules:  fully assembled half-ladder  electrically fully functional  Interconnect to rest of world through kapton  fully tested Ladders:  Ready to be installed in PXD support structure

1 st trials 2010 B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 3 :- thinned silicon dummies, 50 µm “sensitive” :- fully manual, just to test feasibility

Conclusions then: in principle okay.. B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 4 :- joint between two modules very stable! :- alignment and procedure need improvement :- still, can do it better … :- but need dedicated jigs for this job!

Requirements B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 5 The jigs should allow: :- safe storage and transport of modules and ladders :- support for SMD mounting :- module testing on the probe stations :- support for kapton attachment (soldering) :- support for wire bonding :- support for module testing :- glue dispensing for butt-joint and for ceramic inserts :- alignment of two half-modules :- support during room temperature curing of the joint After some discussions and meetings at MPP and HLL:  Ladder Assembly Sequence  Concept of the “Ladder Universal Jig”, drawn by Tscharlie

Step 0: preparation B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 6 :- Wafers are cut, modules go through final clean at HLL :- pack modules into 4’ gel-paks, send to IZM for FC :- FC on Si support jigs (designed and made by IZM) :- FC and X-ray at IZM :- in gel-paks back to HLL  inspect, X-ray on sub-sample :- place into transport jig, label..  From this point, the module stays in the jig! Base module jig base module jig transport base cover

Step 1: SMD B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 7 :- modules in transport box shipped to NTC for SMD :- disassemble, remove base module jig transport box :- Vacuum channels in base module jig fit to vacuum channels at NTC equip.

Step 2: Probe station B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 8 :- cooling plate :- optional cooling during test, sensor held by vacuum :- cover over sens. area

Step 3: Kapton attachment B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 9 :- attach light weight kapton jig to base module jig :- all necessary features for kapton vapour phase soldering and wire bonding

Step 4: testing and storage B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 10

Step 5: the tricky part – turn it around.. B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 11

Step 5: the tricky part – turn it around.. B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 12

Step 5: the tricky part – turn it around.. B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 13

Step 5: the tricky part – turn it around.. B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 14

Step 5: the tricky part – turn it around.. B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 15

Step 6: screen printing of the adhesive – opt. 1 B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 16

Step 6: screen printing of the adhesive – opt. 2 B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 17

Step 7: alignment and gluing B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 18

Step 8: turn back B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 19

Step 8: turn back B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 20

Step 8: turn back B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 21

Step 9: test B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 22

Step 10: pack and store B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 23

In Summary B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 24 :- please allow me not to summarize … puuuuuu :- this is a concept, a very elaborated one, but still a concept :- we have start with prototypes, practice (screen printing, handling..), and optimize