Technical Kick off meeting Grosuplje September 22-23 2008 Integration Preparation António Cunha – Pedro Nunes Institute Networking.

Slides:



Advertisements
Similar presentations
Technical Kick off meeting Grosuplje September Title Author(s) - Organisation author address organization web site Networking for Communications.
Advertisements

Virtual Collaborative Social Living Community for Elderly Kick Off Event WP2 Plan 1 st Period Instituto Pedro Nunes Co-Living.
Craig Union, Ph.D.  Aims  Content  Course Structure  Modules 1-9  Summary.
Mozambique Workplan Eduardo Baixo May 2005 Akosombo, Ghana.
Virtual Collaborative Social Living Community for Elderly Kick Off Event Partner Instituto Pedro Nunes Paulo Freitas – António.
Internationalization through Consortia and Cooperation Friday, November 8, 2013 Anthony C. Ogden, Ph.D. University of Kentucky Melanie McCallon Murray.
8.
Technical kick-off meeting Grosuplje, Sept Karl Johan Grøttum Northern Research Institute, Tromsø, Norway
Lecture 13 Revision IMS Systems Analysis and Design.
Phase Difference = Phase Difference = 0.05.
Project Management Methodology (PMM)
Prepared by: Harvard University, Office of the UCIO Harvard University IT Services Integration Initiative Program Management Planning Meeting January 10,
Work Plan Presentation Template CONFIDENTIAL The use or disclosure of information presented in this document is strictly prohibited.
Viking Project Team Assignment 5 K15T2 - Team 21 1/17/2012.
Professor Linda A Macaulay Programme Director Manchester Business School BSc IT Management for Business.
WiMAX Technology Jokkmokk May Pablo Vila R&D Manager Albentia Systems Networking for Communications Challenged Communities:
Module 2: Concepts and Principles Supporting change through Capacity Development.
 Copyright 2001 Perot Systems Europe. All rights reserved Architecture Model Introduction Tim Taylor.
K-12 Web Content Development Process
Information & Communication TECHNOLOGY. International General Certificate of Secondary Education.
IAPO Round Table 18 th May 2013 Nittita Prasopa-Plaizier Technical Officer, Advocacy and Civil Society Engagement Programme Manager and Technical Lead,
DOCUMENT #:GSC15-PLEN-63 FOR:Presentation SOURCE:ITU-T AGENDA ITEM:Plenary 6.14 CONTACT(S):Reinhard Scholl Activities of Focus Group on Cloud Computing.
Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances Grant Agreement: What TCD and.
From collaborative action to collective impact Katherine Skinner, Educopia Institute FORCE 2015, January 13, 2015.
EDA385 Project Presentation The Sound Disguiser. Overview Sample input audio Read input from the rotary encoder Process the audio due to choosen mode.
What Makes a Computing Device? A Computing Device Has Four Parts –Input –Output –Storage –CPU.
1 © EURIDICE Consortium 2008 Kick Off Meeting Island of San Servolo - Venice, Italy 11th to 13th February 2008 P1 Intelligent Cargo Integration Framework.
Research Information in The Netherlands Marc Dupuis, eResearch Programme Manager, SURFfoundation EUROCRIS, 12 September 2011, Brussels.
Client-Server Processing, Parallel Database Processing and Distributed Database Systems. KEVIN ROBERTS ANIKET MURLIDHARAN.
The research leading to these results has received funding from the European Community's Seventh Framework Programme (FP7/ ) under grant agreement.
Protected Areas Thematic Network IABIN Vision Meeting October 28 th – 29 th, 2008, Washington, DC Presented by Helena Pavese Protected Areas Programme.
September Technical Meeting Slovenia September Session: Application 2. Animal Tracking Santiago Zazo – Universidad Politécnica de Madrid
ICOM 5047 – Proposal – The Smart Health Station August 31, 2009 ICOM 5047 – Proposal – The Smart Health Station1 Axel Vigo Josué Acevedo Pedro J. Franceschi.
9 Systems Analysis and Design in a Changing World, Fourth Edition.
Chapter 3 Strategic Information Systems Planning.
Technical Kick off meeting Grosuplje September Integration Preparation António Cunha – Pedro Nunes Institute Networking.
1:1 Learning Scott Drossos :1 Learning2.
Certification Learning Network February 2,
Antonella Fresa Roma, 12 December 2005 kick off meeting.
The Global Forum on Technology and Innovation in Teaching and Leading 14 th -17 th April 2010.
Family Engagement Framework A Tool for California School Districts September 2011
S3 INNOVATION ELECTRONICS. LESSON TITLE: ELECTRONICS Learning Intention: To understand when to use different types of logic gates Activity: Building own.
AND Gate Inputs Output Input A (Switch) Input B (Switch) Output Y (Lamp) 0 (Open) 0 (OFF) A B Lamp.
Kick off meeting Luleå May Jokkmokk May N4C Follow up WP1 and WP9 Power Lake AB
For Presentation at 28 th APEC Transportation Working Group Meeting Vancouver, Canada Walter Kulyk Director, Office of Mobility Innovation Federal Transit.
Ch. 2 Protocol Architecture. 2.1 The Need for a Protocol Architecture Same set of layered functions need to exist in the two communicating systems. Key.
Virtual Collaborative Social Living Community for Elderly Kick Off Event WP2 Overview Instituto Pedro Nunes Co-Living 12/3/ Paulo Freitas - Instituto.
Massachusetts Community Colleges & Workforce Development m Transformation Agenda Transformation Agenda Summer Gathering August 20, 2014 Using & Sharing.
COmanage working group Internet2 Fall Member Meeting 2010.
PROJECT TITLE <Times New Roman, Size : 28>
Inputs Outputs Tools and Techniques.
INTRODUCTION TO PLC.
Azure Stack Foundation
Project Title Presented By Student1 name - Roll no
Engagement Close-Out Workshop
<Name of Product>Pilot Closeout Meeting <Customer Name>
Reduced Costs Service & Support Innovative Technology Performance Quality.
Reduced Costs Service & Support Innovative Technology Performance Quality.
Partnership for education preparation (PEP)
אביבה אלקלעי, ראש היחידה לכניסה להוראה, המכללה האקדמית אחווה
מהו הסטאז'? המכללה האקדמית תלפיות.
ECHO signal amplification and source of the noise
Terms of Reference – Project Design Authority
Transp Course 2014 Overview.
ITDG meeting of of October 2011
IT323 Project Phase#2.
A new Leaving Certificate Subject for 2nd Level Schools
Presented By Student1 name - Roll no Student2 name - Roll no
Innovative WASH Management Models for the Urban Poor in Ghana
Presentation transcript:

Technical Kick off meeting Grosuplje September Integration Preparation António Cunha – Pedro Nunes Institute Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances Grant Agreement:

14 May 2008www.n4c.eu2 Agenda Phase 1 (10 minutes): Sysml overview (idb block) Phase 2 (15 minutes): Identify the system main modules and the communication protocols. – Phase deliverable: N4C global diagram (Sysml) Phase 3 (15 minutes): Identify the main functions and the inputs and outputs of each module – Phase deliverable: “n” Sysml diagrams (one per module), with inputs and outputs Phase 4 (15 minutes): Identify the expected time for each module development and the dependences between each other – Phase deliverable: Integration workplan Phase 5 (45 minutes, optional): Identify the system requirements – Phase deliverable: System requirements Checklist

Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances Grant Agreement: Phase 1: Sysml overview (idb block) 14 May 2008www.n4c.eu3 Time: 10 minutes

Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances Grant Agreement: Phase 2: Identify the system main modules and the communication protocols. 14 May 2008www.n4c.eu4 Time: 15 minutes Deliverable: N4C global diagram (Sysml)

Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances Grant Agreement: Phase 3: Identify the main functions and the inputs and outputs of each module 14 May 2008www.n4c.eu5 Time: 15 minutes Deliverable: “n” Sysml diagrams (one per module), with inputs and outputs

Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances Grant Agreement: Phase 4: Identify the expected time for each module development and the dependences between each other 14 May 2008www.n4c.eu6 Time: 15 minutes Deliverable: Integration workplan

Networking for Communications Challenged Communities: Architecture, Test Beds and Innovative Alliances Grant Agreement: Phase 5 (optional): Identify the system requirements 14 May 2008www.n4c.eu7 Time: 45 minutes Deliverable: System requirements Checklist