INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT – 4142/EN Supply, Installation, Testing and Commissioning of the HVAC System for the.

Slides:



Advertisements
Similar presentations
ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
Advertisements

EUDET Transnational Access : some administrative aspects Who is eligible? To be eligible to benefit from access to the EUDET infrastructures, a user group.
Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
STANDARD BIDDING DOCUMENT PROCUREMENT OF GOODS (FOR VALUE UP TO NU.0.25 MILLION) Presentation by: Tshewang Gyeltshen.
Chapter 12 Estimate Summaries and Bids. Bid Summaries The format of the summary depends for what the estimate is to be used. –Ordering materials –Calculating.
1 Use and content of the RFP  Request for Proposals (RFP) is similar to bidding documents and include all information of the assignment, selection of.
11-12 June 2009 Survey of the data sources and compilation practices of EU Member States Item 4.1 International Technical Meeting on Measuring Remittances.
FIDIC/ MDB Harmonised Construction Contract Conference S8: Social issues in contracts – labour and health RA Ulrich Paetzold Director General F I E C European.
Financial Management and Auditing First Level Controls 3 rd round operations Rostock, Elise Oukka.
Anglia Ruskin University European Preparatory Visits Grants Scheme.
REPLACEMENT AND MAINTENANCE OF LIFTS GIVING ACCESS TO LHC UNDERGROUND AREAS TENDERING PROCEDURE IT-4056/EN 105 December 2014 Floris Bonthond.
Accelerating Science and Innovation. Science for Peace CERN was founded in 1954 as a Science for Peace Initiative by 12 European States Member States:
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT – 3972/EN PROVISION OF MAINTENANCE SERVICES ON INDUSTRIAL TRUCKS ON THE CERN SITE Insert.
Invitation To Tender Procedure IT – 4005/en Provision of engineering studies and drawings, the supply and installation of piping and its accessories.
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
ESPON 2013 Programme 3 rd Financial Managers Seminar Brussels 19 May 2010.
TENDERING PROCEDURE IT- 3927/EN
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT – 4123/EN Supply, Replacement and Repair of Crane Rails.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4103/EN/LHCb Design, Supply, Installation and Commissioning of an HVAC system, a Smoke.
Doing business with CERN Anders Unnervik 3 November 2014.
Financial Management MW-Sonet 16 th – 19 th of March 2011, Turkey.
2008LIFE presentation LIFE+ call for proposals.
DESIGN, SUPPLY, INSTALLATION AND COMMISSIONING OF HEATING, VENTILATION AND AIR-CONDITIONING (HVAC) SYSTEMS FOR THE PS ACCELERATOR INFRASTRUCTURE TENDERING.
CERN as a World Laboratory: From a European Organization to a global facility CERN openlab Board of Sponsors July 2, 2010 Rüdiger Voss CERN Physics Department.
© Enterprise Europe Network South West 2009 The Eurostars Programme Kenny Legg R&D Funding for the Environmental Sector – 29 June 2010 European Commission.
State of play of OP negotiations and OP implementation ESF Technical Working Group Luxembourg, 2 December
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
SFT News 16 th June CERN/FC/5806/RA2 Return Coefficient Industrial return Austria Belgium Bulgaria Switzerland.
Information Security Systems Cost Effective Authenticity & Integrity in CEN/FISCALIS eInvoicing Good Practice Guidelines Nick Pope – Principal Consultant,
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4134/EN/LHC Supply and Commissioning of HVAC Systems for Five LHC Surface Buildings B.
EIE- Surveyor 1 Financial aspects ► 40 % amount 45 days after initial contract (about December2005) ► 40 % 45 days after approval of the progress report.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4082/EN Design, Supply, Installation and Commissioning of the ventilation of the BAF3.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT – 3976/EN PROVISION OF SPECIALIZED EOT CRANE MAINTENANCE SERVICES ON THE CERN SITE Insert.
The Mission of CERN  Push back  Push back the frontiers of knowledge E.g. the secrets of the Big Bang …what was the matter like within the first moments.
Doing business with CERN Anders Unnervik 20 May 2014.
Purchasing supplies at CERN Procurement Rules Someone FP-PI.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4144/SMB/HL-LHC (Point 1) IT-4155/SMB/HL-LHC (Point 5)
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4154/EN Supply Centrifugal Water Pumps B. Jenssen
PROCUREMENT RULES FOR EXPERIMENTS AT CERN Dante Gregorio CERN Procurement Service.
Best Sustainable Development Practices for Food Security UV-B radiation: A Specific Regulator of Plant Growth and Food Quality in a Changing Climate The.
MEDIA Distribution 26 August 2009 Maud Rouxel - MEDIA Programme-EACEA.
CERN Procurement Procedures for the HL-LHC project Civil Engineering work London, 24 June 2016 Lisa Bellini-Devictor, CERN/IPT-PI.
CERN Procurement Procedures Rome, 28 th June 2016 Adam Horridge.
EUDET Transnational Access: some administrative aspects
NATIONAL MEDIA VISITS Visits for print, radio, agency media during LS1 April April 2014 Hello, In order to reply to the huge amount of visit requests.
Agenda Procurement organization and budget What does CERN buy?
Doing business with CERN Dante Gregorio (dante.
Options for association and collaboration with CERN
Content of Tender Dossier - Instructions to Tenderers - Tenders
INVITATION TO TENDER PROCEDURE IT-4344/EP Design, Supply, Installation, Testing and Commissioning of a Cleanroom extension for the integration of ATLAS.
Purchasing supplies at CERN
Content of Tender Dossier Instructions to Tenderers
Invitation To Tender Procedure
Contract Award Procedures
Invitation To Tender Procedure IT – 4327/SMB Technical specification for the civil Engineering works for the construction of the new building.
PRAG PRACTICAL GUIDE TO CONTRACT PROCEDURES FOR EXTERNAL ACTIONS
IT-4130/EN Bidders conference
PRAG PRACTICAL GUIDE FOR CONTRACT PROCEDURES
Cooperation between CERN and Ukrainian Industries 2017
TENDERING PROCEDURE IT-3981/EN
ALIGNMENT RULE PROCEDURE
IT-4328/EN Bidders conference
History Dec 2015, FC Discussion about contract splitting
Low temperature chiller Market Survey
State of play of OP negotiations and OP implementation
Fasset Briefing Session
ALIGNMENT RULE PROCEDURE
Financial and Administrative presentation on PARTICULATES project
IT-4464/EN Bidders conference
PRE-BID CONFERENCE Health Insurance Provider for UNOPS Indonesia
Presentation transcript:

INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT – 4142/EN Supply, Installation, Testing and Commissioning of the HVAC System for the New Building 107

Key dates  Invitation to Tender issued: 21/04/2016  Compulsory bidders’ conference: 29/04/2016  Bids to be returned to CERN by 16/06/2016  Finance Committee: mid-September 2016 Please do not request information concerning the outcome before FC approval  Start of the Contract: mid-September 2016  Take-over of the supply by CERN: February 2018  Completion of all testing and acceptance: August 2018

IT documents  Tender form  Detailed Quantitative Estimate (DQE) for Work Lots WL1-WL11 inclusive  Technical specification + all annexes  Selection and Adjudication criteria for supply contracts (April 2016)  General Conditions for Invitations to Tender (CERN/FC/5312-I/Rev.)  General Conditions of CERN Contracts (CERN.FC II.Rev.)  Working on the CERN Site

Clarification Process All questions shall be addressed in writing to Requests for clarification should be received no later than 2 June 2016*

Clarification Process  CERN’s response will be sent to all bidders, including the request for clarification but without identifying its source  Bidders shall acknowledge receipt of the  Cover letter with bid shall acknowledge each individual CERN clarification correspondence received

Basis of Award The contract shall be awarded on a «Lowest compliant bid » basis

Selection & Adjudication Criteria With a view to improving the distribution of its purchases among its Member States, CERN has applied, for the selection of bidders to be invited to tender, and will apply for the award of the contract to a technically and financially qualified bidder the criteria set out in the document entitled Selection and Adjudication Criteria for Supply Contracts (April 2016)

Country of Origin The country(ies) in which the bidder is established The countries of origin of all supplies and services shall be CERN Member States, the Candidate States for Accession and the Associate Member States Austria, Belgium, Bulgaria, Cyprus*, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Israel, Italy, Netherlands, Norway, Pakistan*, Poland, Portugal, Romania**, Serbia*, Slovakia, Spain, Sweden, Switzerland, Turkey* and United Kingdom. * Associate Member State in the pre-stage to Membership ** Candidate for accession

Country of Origin of bids For all site activities from civil engineering work to finishing work: - It is the country in which the firm in charge of the corresponding activity is located - In case any activity includes a significant part of goods and materials (e.g. steel frame), the country of origin of such goods and materials is defined as the country where these goods and materials, including their components and subassemblies, are manufactured or undergo their last major transformation In case the work includes the supply and installation of equipment: - It is the country where the equipment (e.g. air handling units), including their components and subassemblies, are manufactured or undergo their last major transformation

Return Coefficient

Well balanced Member States For this invitation to tender, the following CERN Member States are WB MS for supply contracts: Bulgaria Czech Republic France Hungary Italy Switzerland

Return Coefficient

Bids originating from several Member States or submitted by a combination of firms  In the case of a supply contract (which includes civil engineering contracts), a bid is considered to come from a PB MS if at least 60% of the total amount of the bid originates from a PB MS  If this is not the case, the bid shall be treated as that of a firm offering goods from a WB MS

Realignment Rule (Scenario 1) Lowest bid from a PB MS contract placed with it Poorly balanced MS Well balanced MS Bid (CHF) Contract

Realignment Rule (Scenario 2) Lowest bid from a WB MS realignment rule applies if bid difference <20% Poorly balanced MS Well balanced MS Bid (CHF) <20%

Realignment Rule (Scenario 2) Lowest bid from a WB MS (a) 1st bidder from PB MS aligns contract placed Contract Poorly balanced MS Well balanced MS Bid (CHF) <20%

Realignment Rule (Scenario 2) Lowest bid from a WB MS (b) if not, 2nd lowest bidder from PB MS aligns contract placed Contract Poorly balanced MS Well balanced MS Bid (CHF) <20%

Realignment Rule (Scenario 2) Lowest bid from a WB MS (c) if no alignment, contract placed with lowest bidder from WB MS Contract Poorly balanced MS Well balanced MS Bid (CHF) <20%

Price Basis (1/2) The total price for the adjudication (indicated in Table 1, in section 2.4 of the tender form) shall be established on the basis of the total lump sum prices indicated by the bidder in the Detailed Quantitative Estimate (DQE) for each Work Lot (WL1-WL11 inclusive). All unit prices shall be quoted in the currency stipulated in section 2.2 of the tender form, free of taxes, not subject to revision The DQE for each Work Lot shall be completed in its entirety with no changes to the headings. Any modifications or reservations concerning the specified construction methods, the materials, the deadlines, the quantities and the cost breakdowns shall be addressed during the clarification period and explicitly stated in section 12 of the tender form.

Price Basis (2/2) Section 2.3 It should be noted that the quantities provided in the DQE are provided for guidance only. The bidder shall inform himself fully of all aspects of the technical specification and project requirements. It is the contractor’s responsibility to verify all necessary quantities, based on the tender documents provided.

Remuneration (1/2) The first two invoices shall be accompanied by a Bank Guarantee from a bank approved by CERN (BBB+ at least) each for 10 % of the total lump sum fixed price. The BG for the first payment (§5.2) shall be valid until expiry of the warranty of the supply delivered. The BG for the second payment (§5.3) shall be valid until the end of all on site activities, including installation test.

Remuneration (2/2) 10% of the total amount of the contract becomes due thirty days after signature of the contract + BG (§5.2) 10% of the total amount of the contract shall be paid by CERN thirty days following written approval by CERN of the documentation +BG (§5.3) 20% of the total amount of the contract shall be paid by CERN thirty days following delivery on the CERN site of main equipment (§5.4) 40% of the total amount of the contract shall be paid by CERN thirty days following the end of all on site activities, including installation test (§5.5) 10% of the total amount of the contract shall be paid by CERN thirty days following written approval by CERN of the final documentation (§5.6) 5% of the total amount of the contract shall be paid by CERN thirty days following successful overall winter performance test (§5.7) 5% of the total amount of the contract shall be paid by CERN thirty days following successful overall summer performance test (§5.8)

VAT  Prices shall take into account CERN’s exoneration from VAT and import duties (this exoneration does not apply to the Contractor’s tools and equipment, which remain the contractor’s property)  VAT shall be subject to the rules and invoicing instructions as defined under the following link: OR

Instructions for submission (1/2)  Cover letter:  List of each clarification correspondance received  Tender form: duly completed, initialled and signed  Description and Quantity Estimate (DQE): duly completed, initialled and signed for each Work Lot WL1-WL11 inclusive (the DQEs shall be submitted both in PDF and in excel format)  Technical specification: initialed and signed

Instructions for submission (2/2)  A description of the work site organization and logistics  Sketch plan and description of the proposed site installation  A brief but complete description of the installation methods envisaged  Details with regard to:  the activities which will be subcontracted;  any alternative bid proposed by the bidder (both to be detailed in the tender form)

e-tendering instructions  Bids shall in no event be sent by post, or fax  All documents comprising the bid have to be uploaded on the CERN e- tendering application by using the button [Submit Bid] in the CERN e- tendering application  The uploading may take time so we advise you to start at least one hour before the time limit  In case you do not intend to submit a bid, please inform us, by using the button [Decline] in the CERN e-tendering application  If you have any problems or enquiries regarding the registration of your firm, the upload of your bid please consult the [FAQ] in the CERN e-tendering application or contact

Return Date Bids shall be RECEIVED by CERN on 16 th June 2016, 4 P.M at the latest

Information Contact Adam Horridge Tel: