2 3 There are two basic areas where there is a need to have resources available. Internal:  Financial  Personnel  Assets  Time External  Consultants.
OHSAS
Workplace Safety and Health Program
Responsible CarE® Employee health and Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
Health and Safety.
OHSAS 18001: Occupational health and safety management systems - Specification Karen Lawrence.
CHAPTER 2 – ROLES OF CONSTRUCTION PERSONNEL IN SAFETY AND HEALTH
Safety and Health Programs
OH&S Management System
Risk Assessment – An Essential Standard
1 CHCOHS312A Follow safety procedures for direct care work.
Occupational Health, Safety & Environment Training OHS Responsibilities and Duty of Care.
Occupational health and safety
The Management of Health & Safety at Work Regulations 1999
VETiS Moderation meetings – November 2012 Welcome to the Australian Institute of Education and Training.
Occupational Health & Safety Management at IREL Units A.K.DAS G.M. (Safety & Env.) Corporate Office, Mumbai.
Ship Recycling Facility Management System IMO Guideline A.962
Health, Safety and Environment Policy. We are a SafeProduction organization At Vale, we are committed to sustainable development. Meeting the needs of.
Safety & Health Programs.
Occupational Health and Safety
Basics of OHSAS Occupational Health & Safety Management System
What is it? Why it is so important?
Roles and Responsibilities
Introduction to Workplace Safety
Health and Safety Policy
Hazards Identification and Risk Assessment
Two of the most important pieces of the health and safety legislation affecting educational establishments across the UK are the Health and Safety at.
SMS Planning.  Safety management addresses all of the operational activities of the entire organization.  The four (4) components of an SMS are: 1)
Responsible Care® Health & Safety Task Force – 06 H&S.
ISO DOCUMENTATION. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Name.
Program Implementation MM.DD.YY. To comply with the OHSA and regulations To demonstrate management's commitment to health and safety To show employees.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Inspection Part III.
National Corporate Training Pty Ltd0. Topics Follow safe work practices Maintain personal safety standards Assess risks Follow emergency procedures National.
Roles and Responsibilities Explain the roles and responsibilities for health and safety of key personnel in selected workplace.
Contractor Health & Safety Requirements Project :GSU Transformer System Date: 16 May 2014 A Stuart SHEQ Manager – Gx Coal 2.
CLARIFICATION MEETING FOR PPE ACCESSORIES CORP 2902R THE SUPPLY & DELIVERY OF PPE ACCESSORIES ON AN “AS AND WHEN REQUIRED” BASIS TO ESKOM SOC LTD NATIONWIDE.
13/01/2015 ANKERLIG & GOURIKWA POWER STATION STATION OCGT Tender Presented by Obert Mgwenya.
OHSAS Occupational health and safety management system.
1 SHE Requirements Presented by : Diane Maunatlala SS: COHS.
SHEQ presentation Date 9 July SCOPE This applies to all contractors acquiring to conduct meter reading, disconnecting and reconnection work throughout.
PRE-QUALIFICATION TENDER FOR THE PROVISION OF ENVIRONMENTAL SERVICES 11 JULY 2014.
PRE-QUALIFICATION TENDER FOR THE PROVISION OF LAND VALUATION SERVICES CORP March 2015.
Environmental Requirements for BENBURG SUBSTATION 3RD 250MVA 275/132KV TRANSFORMER - CIVIL WORKS.
POWER DELIVERY PROJECTS Central Grids Simmerpan - Civil works. 10 July 2015 Vusi Mthimunye.
Step 1 in the evaluation process No Returnable Document/ Schedule File AFile BFile C Basic Compliance Tenderer’s tick box √ All mandatory requirements.
Environmental Requirements for North West Grid Floodlight Project Compiled by: Silindile Mbhele.
PRE-QUALIFICATION TENDER FOR THE PROVISION OF LAND NEGOTIATORS SERVICES CORP March 2015.
SHE Requirements for the Eskom Procurement and Supply Chain Management Process ( ) Nomusa Leburu.
GROUP CAPITAL DIVISION Majuba Rail Project Clarification Meeting Boreholes Health and Safety Insert image here Lebo Ramoleko Date: 05 May 2016 Time: 10h00.
CAR WASH SHE PRESENTATION 19 September SHE Document for Evaluation SHE Policy signed by CEO SHE Plan aligned to Kusile SHE Specification and mostly.
Instructions The Town of Sylvan Lake’s computer based health and safety orientation is simple process. Read each slide carefully To navigate through slides.

OH&S Management System
Maintaining Safety Standards
Health and Safety Policy
CHAPTER 2 – ROLES OF CONSTRUCTION PERSONNEL IN SAFETY AND HEALTH
Maintaining Safety Standards
Safety Accountabilities
OH&S Management System
NSW Construction Induction Green Card
Instructions The Town of Sylvan Lake’s computer based health and safety orientation is simple process. Read each slide carefully To navigate through slides.
QUALITY, HEALTH, SAFETY & ENVIRONMENTAL POLICY
Safety & Health Programs
Safety & Health Programs
How to conduct Effective Stage-1 Audit
Safety & Health Programs
ISO 45001:2018 The importance of a Safety Management System
Presentation transcript:

SHE Requirements Clarification Meeting Date:17 November 2014 Compiled: Nompumelelo Kaule

Zero Harm Value Eskom will strive to ensure that zero harm befalls for the employees, contractors, the public and the natural environment. 2

Tenderer SHE Returnables Non- negotiable minimum requirements that tenderers have to address and respond to when submitting tender returnable are: Acknowledgement Form for Eskom’s Rules and Requirements (in Annexure B) signed & submitted by the Tenderer Health and Safety Plan Baseline Risk Assessment Valid Letter of Good Standing SHE Policy NOTE: Objective criteria applies but All SHE returnable documents are non-negotiable therefore contract cannot be awarded if some documents are outstanding. 3

Acknowledgement Form for Eskom’s Rules and Requirements (in Annexure B) This is the acknowledgement form issued to the tenderer for his or her own acknowledgement of a clear understanding of all the SHE requirements at Eskom. Signing the Annexure B form will be deemed as your acceptance to conform to the following documentation and application of such within your scope of work. The following Policies/Procedures are in support of Eskom SHE requirements: Eskom Safety, Health, Environmental and Quality Policy: Eskom Life Saving Rules, Directive: Eskom Environmental, Occupational Health and Safety Incident Management procedure Eskom contractor Health and Safety requirements standards SHE specification provided Employees’ right of refusal to work in an unsafe situation Eskom Waste Management Standard The above Policies & Procedures are not tender returnables but for guidance and reference purposes. 4

SHE Plan A detailed SHE plan must address but not limited to the following : Implementation of a SHE system, how it will be monitored and controlled Training and competency for employees Access and monitoring and control of visitors Fire and Emergency preparedness SHE risk management How the culture of Zero harm will be entrenched into the company’s operations The induction program for all employees and visitors Incident management Personal protective equipment and safeguarding of employees Safety initiatives, SHE awareness and communication Housekeeping Medical surveillance programme / certificates Vehicle and Driver safety 5

Baseline Risk Assessment The purpose of conducting a Baseline Risk Assessment is to establish a risk profile or a set of risk profiles. It is used to priorities action programs for issue-based risk assessments. The output of a Baseline Risk Assessment - is a risk profile or set of risk profiles; and It is a clear description of the methodology, system, terminology etc. used in the scoping exercise, and what may be required for the improvement of the Baseline Risk Assessment in the future 6 List activity (When applicable) Hazard Identification Associated risk (Risk identification ) Risk typeRisk Owner Existing Controls First determine Consequence and then the Likelihood of that Consequence. Risk Priority Rating Additional Controls or Tasks Aimed at improving Existing Controls First determine Consequence and then the Likelihood of that Consequence. Risk Priority Rating Monitoring Mechanisms Control Owner List specific activities to be performed taking into consideration the equipment to be used, the personnel involved in the task. A hazard is anything that is likely to lead to an event that will have an adverse impact on achieving an objective. A hazard can pose more than one risk. A physical event occurs or could occur in relation to the hazard Safety or health Who is accountable for making sure the controls and monitors are: - in place, - implemented, - regularly reviewed for effectiveness. Include: - Preventative Controls (controls implemented to eliminate hazards or reduce the likelihood of the risk occurring), and - Reactive Controls (controls implemented to reduce the immediate impact of the risk occurring) Consequence Likelihood Include: - Preventative Controls (controls implemented to eliminate hazards or reduce the likelihood of the risk occurring), and - Reactive Controls (controls implemented to reduce the immediate impact of the risk occurring) Consequence Likelihood How we know if we are succeeding. Include comments on effectiveness. This may include i.e. measurement s, inspections, supervision where necessary. Person allocated the responsibility for implementing the agreed controls

Valid Letter of Good Standing It is essential to ensure that all suppliers which perform work for Eskom / at Eskom premises be registered with the Compensation Fund in terms of the Compensation for Occupational Injuries and Diseases Act (COID Act). In order to ensure that the above mentioned is adhered to, the tenderer needs to submit a valid letter of good standing from the Compensation Commissioner, based on Legislation in section 89, of the Compensation for Occupational Injuries and Diseases Act. 7

SHE Policy A SHE policy is a written statement of principles and goals embodying the company's commitment to workplace health and safety signed by the CEO. There are no hard and fast rules about what to include in a policy. The tenderer should create a policy that is suitable and sufficient in order to address the health and safety needs of the company. The Occupational Health and Safety Act, Act 85 of 1993, requires the employer to provide and maintain as far as reasonable and practical a work environment that is safe and without risk to the health of employees. Section 7 of the Act provides direction to employers concerning the health and safety policy of the organisation. 8

9