Mechanical design of the Pre-Production Detector Unit Model of KM3NeT Mario MUSUMECI and Riccardo PAPALEO KM3NeT PP DU subgroup coordinators.

Slides:



Advertisements
Similar presentations
Deep Ocean Materials Lavinio Gualdesi Saclant Undersea Research Centre La Spezia Italy.
Advertisements

CDR Feb 2006Mar 2008Dec 2009 Mar Design Study Preparatory Phase TDR tendering construction data taking governance legal entity pre-production.
Introduction to Structural Design
Trigger issues for KM3NeT the large scale underwater neutrino telescope the project objectives design aspects from the KM3NeT TDR trigger issues outlook.
WP F/L Development of the Dom support and rope- and cable management for KM3-Net. KM3Net General meeting 2012 Catania - Edward Berbee - Nikhef Edward Berbee.
Rope & Cable management A vertical electro-optical backbone cable for KM3NeT Gertjan Mul On behalf of the km3net collaboration Nikhef.
Jan 2009 U. Katz: Astroparticle Physics 1 What is KM3NeT – the Vision  Future cubic-kilometre sized neutrino telescope in the Mediterranean Sea  Exceeds.
The Multi-PMT Optical Module P.Kooijman, University of Amsterdam University of Utrecht Nikhef.
LRFD-Steel Design Dr. Ali Tayeh Second Semester
Kay Graf Physics Institute 1 University of Erlangen ARENA 2006 University of Northumbria June 28 – 30, 2006 Integration of Acoustic Neutrino Detection.
C.Sollima INFN - University of Pisa for the KM3NeT Consortium “Quality Assurance and Risk Assessment in the KM3NeT Neutrino Telescope Design Study” Technical.
Kay Graf Physics Institute University of Erlangen TeV Particle Astrophysics II Madison, WI, USA August 28 – 31, 2006 Towards Acoustic Detection of UHE.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
Mario MUSUMECI VLV T workshop Mechanics parallel session Critique Of ANTARES MECHANICS, S.CUNEO Analisys of mechanics ideas or NEMO, M.MUSUMECI R. OCCHIPINTI.
 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Chapter 7 Quality and Innovation in Product and Process Design.
Paolo Piattelli - KM3NeTIAPS - Golden, 6-8 may 2008 KM3NeT: a deep-sea neutrino telescope in the Mediterranean Sea Paolo Piattelli - INFN/LNS Catania (Italy)
Hanoi, Aug. 6-12, 2006 Pascal Vernin 1 Antares Status report P.Vernin CEA Saclay, Dapnia On behalf of the Antares collaboration P.Vernin
C.DistefanoCRIS 2008 – Salina, September The KM3Net Consortium Istituto Nazionale di Fisica Nucleare Laboratori Nazionali del Sud Towards a km3-scale.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
Introduction to Structural Design © 2010 Project Lead The Way, Inc.Civil Engineering and Architecture Architecture has recorded the great ideas of the.
WP F/L A mechanical design for a detection unit for a deep- sea neutrino telescope VLVnT11 - Edward Berbee - Nikhef.
Anti-Tsunami Systems Research 1/28 Automatic Anti-Tsunami Systems.
Structures and Mechanisms Subsystems AERSP 401A. Introduction to Structural Estimation Primary Structure: load-bearing structure of the spacecraft Secondary.
A sensor architecture for neutrino telescopes on behalf of the KM3NeT consortium Els de Wolf Thank you, Claudio!
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
Maintenance of the ANTARES deep-sea neutrino telescope 1 Marco Circella --- INFN Bari on behalf of the ANTARES Collaboration.
CLIC Permanent Magnet Quadrupole update 1 st December 2010 Mechanical Engineering status N. Collomb1.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
F Booster Long Straight Corrector Upgrade Technical Status and Schedule for Installation Craig Drennan DOE Tevatron Operations Review March 27, 2007.
M. Circella, Technical and Planning issues, KM3NeT SC meeting, 29 July In this talk Preparation of mass construction (including DOM and DU integration)
KM3NeT Pylos meeting, April, 2007 Some preliminary studies for the positioning calibration of KM3NeT Miguel Ardid Universitat Politècnica de València.
Acoustic Calibration for the KM3NeT Pre-Production Module Alexander Enzenhöfer on behalf of the KM3NeT consortium VLV T 2011 Erlangen, –
Presented by E.G. Anassontzis University of Athens on behalf of NESTOR COLLABORATION 5-8 October 2003 NIKHEF - Amsterdam Title Mechanics for “km 3 ” neutrino.
CEA DSM Dapnia DIRAC-Phase-1 Annual Report meeting Status of the R3B-GLAD Magnet DIRAC-Phase-1 Annual Report Meeting 26 September 2006 Bernard Gastineau.
VLVnT11 - Erlangen 12-14/10/ Giorgio Cacopardo NEMO Phase2 mechanical design G. Cacopardo on behalf of NEMO collaboration.
BI.DIS10: Magnets & generators R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November
SEPTEMBER 2002 Pixel Support Tube A. Smith LBNL 1 ATLAS Pixel Detector Heater Panel Testing Alexis Smith September 17, 2002.
Mechanical design of the Pre-Production Detector Unit Model of KM3NeT Mario MUSUMECI and Riccardo PAPALEO KM3NeT PP DU subgroup coordinators on behalf.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
Steering committee Mechanics 29/07/ KM3NeT steering committee Edward Berbee - nikhef 2 DU-1 pictures at CPPM.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
Wire and Cathode Planes - Current Concept (work in progress) PPD Internal Review – 2 nd Part April 19 th, 2005 Rafael Silva FLARE Fermilab Liquid Argon.
PPM DU Sea Qualification Tests 1.General constraints & requirements 2.Preliminary tests 3.Full mechanical test.
1 Motivations KM3Net VEOC Based on developments on solid cable at NEMO and Antares project and proto cable of Seacon. Optimizing properties like; flexibility.
STATUS AND PHYSICS GOALS OF KM3NET Paolo Piattelli P. Piattelli, ICHEP14 Valencia INFN – LNS, Catania (Italy)
Seafloor Network KM3NeT Italia Strategy, Milestones and Cost R. Papaleo 22 june 2012.
Progress on the Vertical Electro- Optical Cable P.Kooijman UU/UVA/Nikhef.
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
WP F/L Dom production. KM3Net meeting 2012 Erlangen - Edward Berbee - Nikhef22/06/20121.
Report from the Erlangen Meeting Uli Katz ECAP, Univ. Erlangen ANTARES collaboration meeting - KM3NeT day Bologna, 5. October 2012.
KM3NeT WPF/L NIKHEF- MECABAR 1 A.Cosquer on behalf of the KM3NeT consortium MECABAR PROJECT PLAN 1- Context 2- 3D views and responsibilities 3-
S.BEURTHEY CPPM/IN2P3 anémone ανεμώνη anemone Preliminary Development plan A ntares NEMO NE stor CATANIA 12 of March 2008.
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
WP F/L Detection Unit Mechanical Structure and Deployment R. Papaleo 130/03/2011.
The PPM project. The PPM PPM-DOM in Antares (already presented) Tests of the Vertical Electro-Optical cable Deployment of a small scale production model.
NA 62 – straw detector Content Detector Specifications Chamber design Straw design and specifications Calculations and measurements Prototyping Plans Straw.
The electro-optical cabling system for the NEMO Phase-2 tower Antonio D’Amico INFN - LNS.
Pre-Production Models for KM3NeT
Introduction to Structural Design
KM3Net General meeting 2012 Catania - Edward Berbee - Nikhef
P.Kooijman, UVA-GRAPPA, UU, Nikhef
Concluding remarks E. Migneco
Status of the Mechanics at Ciemat.
OFFSHORE CONSTRUCTION
Junction Boxes for KM3NeT
Introduction to Structural Design
A.I. and the Automation of Oil Clean Up
Introduction to Structural Design
Presentation transcript:

Mechanical design of the Pre-Production Detector Unit Model of KM3NeT Mario MUSUMECI and Riccardo PAPALEO KM3NeT PP DU subgroup coordinators

Mario MUSUMECI and Riccardo PAPALEO on behalf of DU subgroup mechanical specifications of the preproduction model - mooring line, anchored to the sea bed and tensioned by means of a top buoy, made by a vertical sequence of storey, able to host the scientific instrumentation necessary to perform the deep sea water neutrino detection and tracking -storey design compliant (shadowing, lightweight,...) with the Digital Optical Modules, hosting one DOM on each end - DOM’s horizontal spacing (storey’s length), 6 m - 20 storey, vertically spaced of 40 meters and twisted of 90°, around the vertical axis, one respect to the other, first from the seabed -DU deployable in a compact (stake) configuration, unfurl able once arrived on the sea bed 6m 40m

Mario MUSUMECI and Riccardo PAPALEO on behalf of DU subgroup to design an effective bracket to support the Digital Optical Module, due to its large active area, is a non trivial job. the system has, at the same time: to respect the specifications in terms of maximum shadowing (less than 2%), to follow the glass sphere’s squeezing due to the environmental pressure, to stand to the stresses due to the use in sea water DOM’s brackets preliminary design current design see E. Berbee Talk

Mario MUSUMECI and Riccardo PAPALEO on behalf of DU subgroup once decided to design an unfurl able mooring line, to find out a way to store the ropes in a safe and efficient manner is fundamental for the reliability of the system both during the unfurling and the entire lifespan of the Detection Unit at the same time, also the backbone has to be stored and maintained in position during the DU’s life ropes management system at the moment, the concept under testing is: to wind the 4 ropes of each storey around reels (2 on each storey’s side) and to arrange the 2 curled backbones around 2 of them

Mario MUSUMECI and Riccardo PAPALEO on behalf of DU subgroup the storey the storey design fits with the following specifications: maintain the DOMs at the assigned horizontal spacing host the ropes management system and the backbone keep the ropes system in the correct configuration minimize the drag stand to the stresses imposed by the surrounding environment and by the deployment minimize the shadowing on the DOMs (less than 2%) the storey are made by slender tubes (40mm OD) welded to made a lattice girder a sea water resistant aluminium alloy (5000 series, peralluman) is the material chose for the tubes 6m two further simplified and non instrumented beams, called “separator”, will be installed between the anchor and the first storey to guarantee to the DU stiffness against torsion around the vertical axis 6m the tapered shape of the beam aims to: minimize the shadowing on the PMTs maximize the strength of the girder maintain the centre of buoyancy above the centre of gravity the red bricks, made of syntactic foam, arranged in the middle of the storey are used to distribute the buoyancy over the DU, in according with the KM3NeT TDR, in order to avoid that a top buoy’s failure could have destructive effects.

Mario MUSUMECI and Riccardo PAPALEO on behalf of DU subgroup the storey Storeys at CPPM

Mario MUSUMECI and Riccardo PAPALEO on behalf of DU subgroup the anchor design fits with the following specifications: maintain the storeys in the packaging configuration during the assembly and deployment phase host the tool necessary to unfurl the DU after the connection with the secondary JB permit the safe unfurling of the storey (protection of the DOM) host the top buoys maintain the DU in stable position on the seabed after the unfurling phase First prototype built at CPPM the anchor

Mario MUSUMECI and Riccardo PAPALEO on behalf of DU subgroup fence the anchor

Mario MUSUMECI and Riccardo PAPALEO on behalf of DU subgroup status of the project, Feb by the middle of September the first so called “assembly meeting” has been organized. The meeting aimed to verify the interfaces between the single sub components, by using some real scale prototype. a mock-up of the anchor has been used to assembly to storeys, the ropes management system, the backbone and the DOM’s brackets. 2.all the components for the PPM-DU prototype (anchor + 5 storeys + 2 separators + 1 base + 2 dummy Dom + DOM support system and rope management system + buoy) are ready. The FAT of the buoy will be performed this week. 3.by the first weeks of march the second assembly meeting will be held at CPPM. first assembly meeting images

Mario MUSUMECI and Riccardo PAPALEO on behalf of DU subgroup sea qualification test the sea qualification test of the mechanical structure (with the oil filled backbone) will be performed thought different steps. the program of work is to qualify each sub item (the most critical) in a dedicated deployment test. in such way the complexity of the system under testing will be eased, in order to simplify the fault finding process. the qualification test will be focused on: - anchor’s - DU bottom item’s (anchor + base + separators) -unfurling trough 2 columns (4 storeys, 1 full column, + 1 storey in the second column) at the end of these three phases, if the concept idea shall be qualified, the group will setup a full mechanical tests with a complete DU made by - anchor - base + 2 separators - 20 storeys fully equipped with dummy DOMs, dummy backbones and storey buoyancy - top buoy See S. Henry Talk

Mario MUSUMECI and Riccardo PAPALEO on behalf of DU subgroup Conclusions The mechanical project of the Tower has been completed The manufacturing of the components for the PPM-DU prototype has been completed (some items have been built for the full DU, i.e. the buoy) within the middle of march will be completed the assembly of the PPM-DU prototype between March and April the DU group should be able to perform the first see qualification test of the PPM-DU prototype (See S. Henry Talk) Soon after the sea qualification test, a review meeting will be organized within a couple of weeks the program for the full qualification test of the mechanical items to be performed in the next months will be completed