ColumbiaGrid EIM Analysis Work Group (AWG) Meeting July 5, 2011 Methodology, Results and Benefits.

Slides:



Advertisements
Similar presentations
NTTG Report to TEPPC BiennialTransmission Plan.
Advertisements

1. SCG Members AESO Alberta Electric System Operator BCTC British Columbia Transmission Corporation.
1. SCG Members AESO Alberta Electric System Operator BCTC British Columbia Transmission Corporation.
Order 2004 Sensitive 1 WECC Phase 1 Rating Process Coordinated Planning and Technical Studies: PCC Presentation on the Avista Interconnection to the PG&E.
Study Results Southwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Southwest Firmed Resource.
TransWest Express and Gateway South WECC Planning Coordination Committee David Smith, National Grid October 25-26, 2007 Vancouver, B.C.
Study Results California In-State Net-Short California Out-State Net-Short California Out-State Net-Short w SWIP N This slide deck contains results from.
Rocky Mountain Area Transmission Study RMATS Economics Economic Comparisons Preliminary: Distribution of Gains and Losses RMATS Steering Committee July.
ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
Western Interconnection Subregions for PSA Layne Brown Manager, Reliability Assessments.
CREPC Meeting November 5-6, 2007 Snapshot of Major Transmission Proposals and Status of Transmission Planning Presenters: Paul Arnold and Jeff Miller.
NORTHWEST POWER POOL Reliability Update
NTTG Economic Study and Biennial Study Update NTTG Economic Study and Biennial Study Update NTTG Study Cycle.
Department of Water and Power City of Los Angeles Renewables Portfolio Standard (RPS) Master Plan Building Out Opportunities October.
Arizona Transmission System Overview November 18, 2014 Tribal Solar Working Group 1.
Gene Henneberg, Chair Remedial Action Scheme Reliability Subcommittee
WECC PCC Meeting Salt Lake City, UT July 16, 2014.
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014.
WGG Coal Retirement Case Transmission Repurposed for Renewables.
Montana Ambassadors Helena, Montana February 25, 2011.
Rocky Mountain Area Transmission Study RMATS Economics Reference Cases Economic Comparisons Distribution of Economic Gains and Losses RMATS Steering Committee.
Energy Gateway Gateway West Project Gateway South Project
Study Results Drought Scenario Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the impact in the interconection.
Transmission Expansion in the Western U.S. Transmission Policy, Incentives, and Expansions in the Western States Marcus Wood Stoel Rives LLP 900 SW Fifth.
Approach to the Wind Resource Assessment for the Sixth Power Plan Northwest Power & Conservation Council Generating Resources Advisory Committee August.
5/23/08ACC 5 th BTA Workshop – Phoenix - SWAT – RE Kondziolka 1 SWAT Subregional Planning Group Update Arizona Corporation Commission Fifth Biennial Transmission.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
Past Studies and Resource Diversity Western Renewable Energy Zones, a joint initiative of the Western Governor’s Association and the U.S. Department.
Successful Transmission Planning & Development in the West Kelly Barr Manager, Regulatory Affairs & Contracts Salt River Project Phoenix, Arizona June.
1 Wind Integration Study Team (WIST) Report to the Northwest Wind Integration Forum Steering Committee January 6, 2010 Jeff Miller - ColumbiaGrid Rich.
WestConnect Activities Charles Reinhold WestConnect Project Manager 2008 ACC BTA Workshop Phoenix, AZ May 22, 2008.
Energy Gateway Update for Wyoming Infrastructure Authority January 27, 2009 Darrell Gerrard Vice President Transmission System Planning.
Study Goal:  Perform a “bottom-up” assessment of the sustained peaking capacity of the Pacific Northwest Hydro System over the highest 18 hours in a 3.
HMTF Understanding PLF August 31, 2015 Kevin Harris, ColumbiaGrid TEPPC\Hydro Modeling Work Group - Chair.
Study Results High EE/DG/DR Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the results of an increase of EE/DG/DR.
Modeling Working Group Progress Report to TAS TEPPC Quarterly Meeting November 2-5, 2015 Tom Miller- MWG Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Rocky Mountain Area Transmission Study Steering Committee Meeting 2013 Case Alt 1 & 2 - Iteration 2 – Test Transmission Solutions Alt 3 & 4 – Iteration.
HMTF Update TAS Nov 3-4, 2015 Kevin Harris, ColumbiaGrid TEPPC\Hydro Modeling Work Group - Chair.
Base Case Rocky Mountain Area Transmission Study Presentation to Steering Committee February 5, 2004.
1 Wind Integration Study Team (WIST) Report to the Northwest Wind Integration Forum Technical Work Group October 29, 2009 Jeff Miller - ColumbiaGrid Rich.
© 2000 PACIFICORP kV LINE WALLA WALLA – WALLULA – Mc NARY 500 kV LINE HEMINGWAY – CAPTAIN JACK – REGIONAL PLANNING MEETING REGIONAL PLANNING PROJECT.
RPCG – 2026 CCTA Results and Next Steps Colby Johnson & Vijay Satyal W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
CCTA Process Review TAS Update – Feb 12th 2016
Greg Brinkman Debbie Lew National Renewable Energy Laboratory Golden, Colorado USA Western Wind and Solar Integration Study: February TRC meeting – Transmission.
December 14, 2007 RPG - CREZ Meeting CREZ Transmission Optimization Study: Update Warren Lasher ERCOT System Assessment.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 5/09/2011 West of Cascades – North (WOCN) Path BPA Studies Path Definition (for studies) 
Renewable Energy Transmission Initiative 2.0 Plenary Group Meeting April 18, 2016 Sacramento, CA Thomas Carr Western Interstate Energy Board TEPPC’s Resource.
Northwest Coal Retirement Reduction Study Development of Base Case Assumptions and Scenarios PNUCC Meeting October 15,
Biennial Transmission Plan Studies Update - DRAFT April 6, 2011.
Northern Tier Transmission Group Report to Columbia Grid Planning Committee February 9, 2012 “To ensure efficient, effective, coordinated use & expansion.
Economic Planning Study Presentation Northwest Coal Retirement Reduction Study Results Kevin Harris February 3, 2015.
Houston Import Study Update
4/23/2018 Steering Committee Meeting 2013 Case Alt 1 & 2 - Iteration 2 – Test Transmission Solutions Alt 3 & 4 – Iteration 1 - Define Congestion.
EPS Updates ColumbiaGrid Planning Meeting October 13, 2016
Transmission Planning Update October 20, 2010
Outline Background Study Assumptions Study Results To Do
Recommended Hydro Improvement April 11, 2017
Keegan Moyer Interim Manager, Transmission Expansion Planning
Recent Approved WECC Cases
ColumbiaGrid Planning Meeting FERC Order 1000 Activities June 7, 2018
Modeling Assumptions for 2033 High Renewable PCM
TAS Quarterly Meeting November 2-3, 2016 Michael Bailey, P.E. WECC
CCTA Process Review TAS Update – Feb 12th 2016
RPCG – 2026 CCTA Results and Next Steps
Study Results California In-State Net-Short California Out-State Net-Short California Out-State Net-Short w SWIP N This slide deck contains results from.
Recommended Hydro Improvement April 11, 2017
Study Results Drought Scenario Study
Tyler Butikofer Associate Engineer II
PDWG Validation of the 2028 ADS PCM V1.0
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014
Presentation transcript:

ColumbiaGrid EIM Analysis Work Group (AWG) Meeting July 5, 2011 Methodology, Results and Benefits

Phase II Methodology PRODUCTION/COST MODELS Based on TEPPC PC0 Case: AVA, PSE and BPA Zones in NW model along with PGE and PACW SCL, TPWR, Grant, Chelan and Douglas included in BPA zone Hurdle rates applied between zones only Loads 2020 forecasts with 2006 load shape

Phase II Methodology LOADS Name:First Day:Last Day: No. Days: No. Hours: Contigu ous? No Breaks Max Value: Min Value: Ave Value: Load_AVA_2006.datSun 1/1/200612/31/ TRUE ,385 Load_AVA_2020.datWed 1/1/202012/31/ TRUE ,717 Load_BCTC_2006.datSun 1/1/200612/31/ TRUE ,028 Load_BCTC_2020.datWed 1/1/202012/31/ TRUE ,200 Load_BPA_2006.datSun 1/1/200612/31/ TRUE ,470 Load_BPA_2020.datWed 1/1/202012/31/ TRUE ,582 Load_CHPD_2006.datSun 1/1/200612/31/ TRUE Load_CHPD_2020.datWed 1/1/202012/31/ TRUE Load_DOPD_2006.datSun 1/1/200612/31/ TRUE Load_DOPD_2020.datWed 1/1/202012/31/ TRUE Load_GCPD_2006.datSun 1/1/200612/31/ TRUE Load_GCPD_2020.datWed 1/1/202012/31/ TRUE Load_PACW_2006.datSun 1/1/200612/31/ TRUE ,020 Load_PACW_2020.datWed 1/1/202012/31/ TRUE ,363 Load_PGN_2006.datSun 1/1/200612/31/ TRUE ,395 Load_PGN_2020.datWed 1/1/202012/31/ TRUE ,683 Load_PSE_2006.datSun 1/1/200612/31/ TRUE ,837 Load_PSE_2020.datWed 1/1/202012/31/ TRUE ,015 Load_SCL_2006.datSun 1/1/200612/31/ TRUE ,149 Load_SCL_2020.datWed 1/1/202012/31/ TRUE ,244 Load_SMUD_2006.datSun 1/1/200612/31/ TRUE ,061 Load_SMUD_2020.datWed 1/1/202012/31/ TRUE ,111 Load_TPWR_2006.datSun 1/1/200612/31/ TRUE Load_TPWR_2020.datWed 1/1/202012/31/ TRUE

Phase II Methodology GENERATION 2006 hydro year (average water) Publicly available data, ie heat rate, etc. Production cost of wind, hydro and solar is zero OTC units in CA replaced with retrofits and new thermal units Future generation based on LRS and IRP submittals supplemented by renewable energy selected using WREZ Peer Analysis tool to meet full RPS MW added in NW. Larger sites include: 1610 MW at Klondike 925 MW at Cedar Springs 120 MW at Salem 130 MW at Columbia 460 at Central Ferry 570 at McNary Renewable penetration level is 16.8%

Phase II Methodology RENEWABLE PENETRATION LEVEL RPS requirements by state Annual energy load is calculated by utility Renewable energy standards applied to each affected utility Sufficient renewable energy added to system to meet aggregate requirements 16.8% WECC-wide (13% without CA and AB)

Final - Ver. 7.0, July 22, 2010 CAISO CAISO02 Sunrise CAISO03 Blythe-Devers CAISO04 Tehachapi Upgrade SSPG SSPG02 SWIP South SSPG05 TCP Harry Allen - Northwest SSPG06 TCP Northwest – Amargosa SWAT SWAT01 PV-NG#2 SWAT06 Pinal Central – Tortolita SWAT07 Southeast Valley (SEV) SWAT08 PV - Morgan CCPG CCPG02 Pawnee – Smoky Hill CCPG03 Waterton- Midway CCPG04 San Luis Valley Hemingway NTTG01 NTTG02 Populus NTTG03 NTTG01 NTTG03 Boardman Bethel NTTG06 Wyoming Montana Idaho Oregon Washington Colorado Utah Nevada California Arizona New Mexico Comanche Waterton Midway Smoky Hill Pawnee CCPG02 CCPG03 CCPG04 Calumet Palo Verde SWAT01 North Gila II Pinal Central Midpoint Tortolita SWAT06 Browning SWAT07 FOUNDATIONAL PROJECTS BY 2020 NTTG NTTG01 Gateway South Phase 1 NTTG02 Gateway Central Phase 1 NTTG03 Gateway West Phase 1 NTTG05 Hemingway – Boardman NTTG06 Cascade Crossing CG CG01 I-5 Corridor CG02 West McNary CG03 Big Eddy – Knight CG04 Little Goose Area Reinforcement BCH BCH01 Nicola – Meridian BCH03 BC-US Intertie Alberta AESO AESO L Conversion AESO04 Heartland AESO05 West HVDC AESO06 East HVDC AESO07 Fort McMurray - East Line AESO08 Fort McMurray - West Line Mona Aeolus SSPG02 Harry Allen NTTG05 Eldorado SSPG05 Northwest Amargosa Devers CAISO03 Imperial Peňesquitos CAISO02 SSPG06 Blythe Morgan SWAT08 McNary John Day Sigurd Red Butte Bridger Castle Rock Troutdale CG01 CG02 Nicola Meridian BCH01 Oquirrh Limber Terminal Coyote Spgs Legend 500 kV Single Circuit Line 345 kV Single Circuit Line 500 kV Double Circuit Line 345 kV Double Circuit Line DC Circuit (various voltage) Termination Substations Intermediate Substations (1) Map does not reflect 230 or 240 kV lines that are included in the Foundational Transmission Project List. (2) Internal reinforcements projects not shown for clarity. (3) Lines shown are for illustrative purposes only and may not reflect final line routing. AESO04 AESO05 AESO06 AESO03 AESO08 AESO07 Langdon Alberta Heartland Ellerslie West Brooks Genesee Ingledow Custer BCH03 CG03 CG04 Big Eddy Knight Central Ferry Lower Monumental British Columbia Robinson Highwind Vincent Antelope Pardee Windhub CAISO04

Phase II Methodology CONFIDENCE LEVEL OF STUDIES Prod/cost models assume transmission is available to cheapest resource Models do not respect contractual ownership of generation Hurdle Rate Methodology Used to impede flows to match 2006 historical operation 2006 hurdle rates applied to different generation fleet in In Benchmark case, hurdle rates reduce Colstrip in favor of Montana wind and westside CTs In EIM case without hurdle, Colstrip is cheaper than westside CTs Relying on comparison of studies rather than individual study results helps mitigate impact of these weaknesses

EIM Analysis Work Group - July 5, 20118

Phase II Results Cases Posted 2006 Benchmark 2006 EIM 2020 Benchmark 2020 EIM Our focus is on the 2020 cases

Phase II Results Data Provided (hourly) Generation by bus Production Cost by Generator Load by bus LMP by Bus Generator LMP by zone Production Cost by zone Load LMP by zone Power flow by path Spilled Generation

Phase II Results Data issues Full Gridview data set is enormous ACCESS files are not very stable Posted data files are incomplete and/or inconsistently reported Many results are not posted Intermediate cases Sensitivity cases, especially reduced BA participation We are requesting additional data from E3

Phase II Results To break down benefits, we need intermediate cases from WECC/E3: BM: Benchmark 2.Hurdle rates removed ($57M) 3.Reduced Flex Reserve Requirement ($101M) EIM: EIM-wide procurement of reserves ($17M) Only data for #1 and #4 are available now

EIM Analysis Work Group - July 5,

Phase II BA Benefits Analysis WECC/E3 plans to provide more information on individual BA Benefits: 1.Modified Generation Cost Approach 2.Roadmap for participants to adjust calculation to account for remote generation ownership Results expected on July 15

Phase II BA Benefits Analysis WECC Modified Generation Cost Approach Total cost = Sum of Production Cost + Net imports priced at load LMP - Net exports priced at Gen LMP Does not account for remote generation ownership or multiple ownership within zone Roadmap will help utilities to account for remote generation and multiple ownership Current runs do not have import/exports for utilities embedded in zones

Phase II BA Benefits Analysis ColumbiaGrid Analysis to determine Individual BA Benefits: Zonal analysis to calculate load cost and net revenue Load cost = Load X LMP Net revenue = Gen X LMP – Prod/Cost Need better accounting of generation output ownership and remote generation to improve results

2020 Benchmark Case2020 EIM Case Group Annual Load Cost Annual Net Generation Revenue Annual Load Cost Annual Net Generation Revenue Δ Load Cost Δ Generation RevenueΔ Total AVA BPA CHPD DOPD GCPD PSE SCL TPWR NW Total * All values listed are million $. Total includes PACW and PGN. Note: 1) All generation revenue flows to generation owner regardless of contract. 2) All independent generation is assigned to BPA (Big Hanaford, Centralia, Grays Harbor, HPP and independent wind) 3) Only generation in the Northwest footprint was included (e.g. no Colstrip). D R A F T

2020 Benchmark Case2020 EIM Case Generation Project Annual Net Generation Revenue Δ Generation Revenue Colstrip Chelan14151 Wells Rock Island91964 Rocky Reach Priest Rapids Wanapum Big Hanaford891 Centralia HPP25 0 Mint Farm17 1 Grays Harbor24283 Independent Wind * All values listed are million $. D R A F T Examples of Generation “accounting issues”

Phase II BA Benefits Analysis Data that ColumbiaGrid needs to improve Benefit Analysis: Ownership of generation Correct errors Provide ownership shares Account for IPPs =>spreadsheet Can compare ColumbiaGrid results with WECC Roadmap analysis when available

Phase II: BA Benefits Analysis Comments on proposed ColumbiaGrid Benefits Analysis? What other data and analysis do participants want from ColumbiaGrid?