The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 14, 2013.

Slides:



Advertisements
Similar presentations
FILEMAKER SERVER SOFTWARE & REMOTE ADMINISTRATION
Advertisements

The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 6, 2012.
Introduction to electronics lab ENGRI 1810 Using: Solderless prototype board (white board) Digital multimeter (DMM) Power Supply Signal Generator Oscilloscope.
Automatic Updates. The bottom left hand corner should say “checking for updates” every time you sign in.
Far Detector Data Quality Andy Blake Cambridge University.
MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine WBS7: Electronics and Data Acquisition  Overview (this talk): D. Casper  Front-end.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 20, 2011.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Nov
Antiproton Lens Replacement (Unfortunately Part 2) Keith Gollwitzer Antiproton Source Department for the Experts and Mechanical Support Department Target.
ITimpulse NOC process This is an interactive, detailed, step wise guide explaining how alerts are managed at our NOC. This document contains information.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
CAL DQM SHIFT TODO and RELATED MATERIAL T. Schörner-Sadenius Hamburg University CAL Meeting, 13 October 2004.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 4, 2012.
Vladimir Frolov for Torino group. Experimental activities: The system for testing the MRPC in the Torino INFN laboratory has been fully mounted and checked;
Electronic Detector status and run organization Logistics and organization Updates on the electronic detector since last year run Conclusions.
GUIDED LESSON HYPERLINKS. OBJECTIVE In this lesson, you will learn the basics of working with hyperlinks, including how to insert and remove them in your.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester April 1, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
SEMS allows you to create reports based on your files. This guide will give you the steps to create a report on the SEMS site using the Question Wizards.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Debugging of M2-M5 G. Passaleva. 11/02/2009 Muon System mini review G. Passaleva 2 outline Short summary of Muon readout channel organization Connectivity.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 5, 2013.
The Functions of Operating Systems Interrupts. Learning Objectives Explain how interrupts are used to obtain processor time. Explain how processing of.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
Faculty of Physics, University of Belgrade General meeting 19 th of August, ToF-LR HV Upgrade Jovan Puzović, Faculty of Physics, Belgrade.
All Experimenters’ Meeting February 09, Accelerator Operation Summary Calendar Week # 06 NuMI Weekly Integrated Intensity 6.69 E18 protons Beam.
Offline shifter training tutorial L. Betev February 19, 2009.
A.Golunov, “Remote operational center for CMS in JINR ”, XXIII International Symposium on Nuclear Electronics and Computing, BULGARIA, VARNA, September,
25-May-03 jadzia warchol, ext. 8341, phone Calibration of FPD detector Content Page General2 Calibration 3 Taking data (Calibration or Pedestal.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
STAR Collaboration Meeting, Nantes Alexandre A. P. Suaide Wayne State University Slide 1 EMC Commissioning for the run Review of last.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep 26, 2011.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Mar
17 February All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 February Dedicated some.
1 ACTIVATION OF THE ST ScI ELECTRONIC GRANTS MANAGEMENT SYSTEM BY INSTITUTIONAL AUTHORIZING OFFICIALS January, 2001.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 17, 2011.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 24, 2013.
MINER A Operations Report All Experimenters’ Meeting Steve Hahn, FNAL July 1, 2013.
MINERvA Status Report Deborah Harris, Gabe Perdue, Kevin McFarland, Jorge Morfin October 15, 2009.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
All Experimenters’ Meeting January 26, Accelerator Operation Summary Calendar Week # 03 NuMI Weekly Integrated Intensity 2.74 E18 protons Beam.
All Experimenters MeetingDmitri Denisov Week of September 2 to September 8 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.9pb.
FPD STATUS Carlos Avila Uniandes/UTA 1. FPD overview 2. Roman pot and detector status 3. FPD readout integration status 4. Software status 5. Stand-alone.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
Preparations for Run 6 Don Lynch February 13, 2006.
S.MonteilPS/SPD COMMISSIONING1 HW Maintenance – JANUARY Clermont team Outline: 2009: restart the system: few observations. Hw maintenance C-side:
MCast Errors and HV Adjustments Multicast Errors (seen on the DATA ERIS connection) have caused a disruption of a HV Adjustment due to a timeout (since.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jan 25, 2016.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Mar 30, 2015.
Troubleshooting Windows Vista Lesson 11. Skills Matrix Technology SkillObjective DomainObjective # Troubleshooting Installation and Startup Issues Troubleshoot.
Vladimir Frolov (Centro Fermi) On behalf EEE-TO group.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 24, 2014.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep14, 2015.
Minerva Test Beam 2 Status Geoff Savage for the Test Beam 2 Team March 23, /23/2015AEM - Minerva Test Beam 2 Status1.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 8, 2016.
Doubling the Target Insertion Rate P J Smith for MICE VC 163.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Dec 9, 2013.
MICE Computing and Software
Shift instructions August 16, 2017 Antoni Aduszkiewicz
CSC Shift Training and Operation + B904 Status
Presentation transcript:

The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 14, 2013

Taking Data We are taking data with very small downtimes –All parts of the detector are operating fine We have just had one PMT showing the “high voltage varying problem”. –A Cockcroft-Walton generator sets the HV on the tube –When difference between the set and actual values becomes wide (HV > 10v). The HV will vary around the set value. The HV varying will come and go if a tube has the problem. –This PMT box had this problem in the LE run. We removed it, replaced the parts inside except the PMT, and reinstalled it on the detector. It appear now that this did not fix the “HV varying problem” for this PMT box 2

Shutdown Tasks Replaced failed raid disks on 2 computer during down time. –mnvonline1 - One of these is our DAQ computers. –mnvonlinebck1 – Has veto software for online –Both disks came up fine after the replacement. –But its not clear this fixed either of these problems right now. Error is “smart-failure” –We sent a ticket to Service Deck to get a experts on raid systems involved. We replaced a FEB with one failed channel 3

Shutdown Tasks ¾ of the FESBs on the west side cannot be accessed, PPD is building a platform which will enable access these FESBs –A FESB powers a chain → FEBs. –The fuse in FESB can blow when the FESB is power cycled. Sometimes, we need to do this to readout a chain. – A platform is being designed, most parts here. One part ordered. –Should be installed in 2-3 weeks. –This platform makes replacement of FEBs and PMTs on the far west side much easier. We could not access the FEB which has high PEDs ave in ½ the channels. The PED ave, > 2000, is much higher than the nominal ped, 450. This FEB can be replaced with this platform 4

CROC-E Firmware To Check CRC word We have decided on the method to insert the CDC word into our data structure. The version of the CROC-E firmware has been updated by Cristian Gingu. –We have tested the new version of the firmware. This version has some problems so further work will need to be done on the firmware. –This work on this has been delayed by other work on the 14 th floor. We need to increase the priority of this work. 5

UROC Procedures We had a problem with one of our remote sites. Their UROC wasn’t working when their shift started and they worked on fixing this. The previous shifter left before the fix was complete. We have addressed this by tightening the shift procedures. –The remote shift station must be rechecked 2 workdays before the shift starts –The shift person whose shift is ending must stay until there is someone replace them. We have a “shifter of last resort” that they can phone in this case. 6

IF Beam Data Server The IF Beam Data Server failed for about 4 hours on Sep 26 and 27 –The IF Beam Data Server supplies ACNET information to the NuMI experiments. –MINERvA & MINOS cannot analyze the data unless they have the ACNET information. When the IF Beam Data Server fails, the procedures for the shifters is to contact the MINOS-MINERvA Liaison. A method to recover the data to the IF Beam Database is in progress. We should be able to recover the data. 7 Shifters watch this page. It will turn red if there is a problem.

MM4 The SWIC scanner which was installed downstairs has been replaced by the SWIC scanner with the modified grounding. –The ORC for the electronics rack should be ready this week. Work is continuing on the documentation for the electronics for the gas system 8

Hadron Monitor Alberto Marchionni has verified that the problem is a bad pixel which has a problem holding voltage. He as disconnected this pixel from the HV supply He will look at it in the next down time and try to bring it up on voltage. 9

Event Display Neutrino event 10 Hit Times, Timing slice that is displayed X viewU viewV view