GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Project Overview 1 Presentation 1 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review W.

Slides:



Advertisements
Similar presentations
Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
Advertisements

The Gamma-Ray Large Area Space Telescope: UNDERSTANDING THE MOST POWERFUL ENERGY SOURCES IN THE UNIVERSE Anticoincidence Detector for GLAST Alexander Moiseev,
GLAST LAT Instrument GLAST Monthly Mission Review August 6, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview August 6, 2007 Ken Fouts.
GLAST LAT ProjectMonthly Status Meeting Jan 26, Project Status January 26, 2006 Gamma-ray Large Area Space Telescope Lowell A. Klaisner Project.
© 2007 General Dynamics. All rights reserved. Integrated Space Systems 1196 EB-R GLAST Pre-Ship Review (PSR) LAT Payload I&T Review CONTRACT NO.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator and X-LAT Assy1 GLAST Large Area Telescope:
GLAST LAT Project – Cost and Schedule ReviewNovember 3, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review November 3, 2004.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 1 Presentation 8 of 12 Integration and Test GLAST Large Area Telescope: Pre-Shipment Review Integration.
GLAST LAT Instrument GLAST Monthly Mission Review October 5, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview October 5, 2007 Ken Fouts.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 1 GLAST Large Area Telescope Pre-Environmental Test.
GLAST LAT Instrument LAT Monthly Status Review Aug 1, 2007 W N Johnson, NRL 1 GLAST Observatory TVAC at NRL Aug 1, 2007 Neil Johnson NRL
Tracker Subsystem1 GLAST LAT Project FM4/5 PSR, May 31, 2005 GLAST LAT Tracker Tower-4/5 Pre-Ship Review INFN-Pisa.
GLAST LAT Instrument GLAST Monthly Mission Review July 12, 2007 N. Johnson, NRL 1 Monthly Mission Review Project Status Overview July 12, 2007 Neil Johnson.
1 Gamma-Ray Astronomy with GLAST May 24, 2008 Toby Burnett WALTA meeting.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
ISOC/SVACInstrument Analysis Meeting, Quatorze Juillet, 2006 Anders W. Borgland 1 Announcements Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
1 GLAST LAT Arrival at Spectrum Assuming That the LAT Transport Container Arrives on Flatbed Truck Question: Can Transport Cover Support Crane Lift With.
GLAST LAT Project May 2, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems.
GLAST LAT ProjectNovember 17, 2004 AntiCoincidnce Detector 1 GLAST Large Area Telescope: Face to Face Meeting November 17, 2004 AntiCoincidence Detector.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 14 March March 2005 LAT High Bay Operations Supporting Test Events LAT.
Particle Physics and Astrophysics (PPA) Mechanical Engineering Ken Fouts.
GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Mechanical.
GLAST Large Area Telescope:
GLAST LAT ProjectJune 30, 2004 Monthly Review Rev. C 1 GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT I&T GLAST Monthly Mission Review Nov 3, 2005 wnjohnson 1 Monthly Mission Review LAT Environmental Test Planning November 3, 2005 W Neil Johnson.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 16 March 2005 LAT High Bay Operations Supporting Non-Test Events LAT Engineering.
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 1 Introduction & Science Overview 1 GLAST Large Area Telescope: Introduction.
Systems Integration1 GLAST LAT ProjectMarch 2005 LAT Environmental Test Planning Meeting March 2005 Thermal-Vacuum Testing LAT Environmental Test.
National Aeronautics and Space Administration November 23, Gamma-ray Large Area Space Telescope (GLAST) Kevin Grady, Project Manager Steven Ritz,
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
1 GLAST The Gamma-ray Large Area Space Telescope Status of the Mission F.Longo see
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Overview LAT Environmental Test.
GLAST Large Area Telescope (LAT) Overview Peter F. Michelson Instrument Principal Investigator Stanford University William E.
GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 8 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT ProjectApril 2005 Project Status Overview May 24, April, 2005 Lowell Klaisner LAT Project Manager Rev. - LAT Project Status Overview Gamma-ray.
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
Launch The Gamma-ray Large Area Space Telescope (GLAST) S. Ritz (GSFC, Project Scientist), J. Grindlay (Harvard, Users Committee Chair), C. Meegan (MSFC,
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Operations and Logistics LAT Environmental.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 D. Nelson 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
GLAST Large Area Telescope:
EMI/EMC GLAST Large Area Telescope LAT Pre-Shipment Review
Environmental Test Planning
Gamma-ray Large Area Space Telescope ACD Final Performance
Gamma-ray Large Area Space Telescope
Integration and Test GLAST Large Area Telescope:
Baseline Environmental Test Flow at NRL
GLAST LAT System Engineering
GLAST Large Area Telescope:
GLAST LAT System Engineering
GLAST Large Area Telescope: Cost/Schedule Review September 1, 2005
Large Area Telescope Project
GLAST Large Area Telescope:
Thermal Vacuum Test: Plans and Procedures
Lessons Learned and Earned Value Management System Assessment
Integration and Test Organization Chart
Mechanical/Thermal Systems
GLAST Large Area Telescope
GLAST Large Area Telescope:
Introduction and Overview
Design Integration and Analysis
Presentation transcript:

GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Project Overview 1 Presentation 1 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review W Neil Johnson Naval Research Lab LAT Dpty PI for Instrument/Observatory Operations (202) Gamma-ray Large Area Space Telescope Project Overview

GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Project Overview 2 Presentation 1 of 12 Instrument Design: 4x4 modular array e+e+ e–e–  Si Tracker pitch = 228 µm 880,000 channels 18 X-Y layers of silicon w/ tungsten foil converters (12 layers × 2.8% X layers × 19% X layers) Mechanical Sys. (inc. Grid & Thermal Radiators) 3000 kg, 650 W (allocation) 1.75 m  1.75 m  1.0 m 20 MeV – 300 GeV CsI Calorimeter Hodoscopic array 8.4 X 0 8 × 12 bars of CsI 2.0 × 2.7 × 32.6 cm Anti-Coincidence Detector Segmented scintillator tiles efficiency Electronics, Data Acquisition, & Flight Software LAT measures direction and energy of incoming gamma rays

GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Project Overview 3 Presentation 1 of 12 LAT Status  LAT has completed its environmental test program –Currently being loaded into transport container for delivery to General Dynamics C4 – SASS.  No major failures or environmental susceptibilities were discovered.  No significant performance changes throughout the program –Performance over temperature is stable  LAT requirement verification sell off is in progress –459 Requirements –72% (329) verification reports submitted to mission office –48% (219) reports accepted  LAT End Item Data Package (EIDP) is in progress

GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Project Overview 4 Presentation 1 of 12 LAT Project Milestones

GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Project Overview 5 Presentation 1 of 12 LAT Organization Chart: to launch + 60 days Principal Investigator P. Michelson Instrument Scientist S. Ritz Senior Science Advisory Committee N. Gehrels Collaboration Science Team Instrument Science Performance S. Ritz, W. Atwood K. Fouts Project Manager Integration &Test K. Fouts (A) ISOC R. Cameron EPO L. Cominsky Mission Assurance J. Cullinan Project Controls L. Price Administration D. Viera Deputy Principal Investigator Science Operations S. Ritz Deputy Principal Investigator Instrument/ Observ. Operations N. Johnson System Engineering P. Hascall Flight Software J Thayer LAT Commissioner E. Grove LAT Advisors L. Klaisner D. Horn Contract/subaward Management N. Christiansen LAT Operations Steering Committee N. Johnson, S. Ritz, Co-chairs

GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Project Overview 6 Presentation 1 of 12 Weight & CG CPT Sine Vibe Offload & Set-up LAT Offload & Set-up LAT 5 days 9 days Install Radiator s 3 days EMI/EMC Test 11 days Acoustic Test 7 days 3 days Remove Radiator s Remove Radiator s 2 days LAT Environmental Test Flow Plan and Performance Pack and Ship 2 days T- Bal Pre TV T- Cycle 43 days CPT NOTE: Durations for moving and setup have been incorporated into the total duration for the test. Shipment System Commissioning/ System Test 3 days 5/11/06 5/08/06A 5/14/06A 7/10/05 7/05/06A 9/15/06 9/18/06A Arrival SASS PER 5/25/06A PSR 9/13/06 9/15/06A PSR 9/13/06 9/15/06A 6/14/06A 6/24/06A 7/1/06A 7/29/06A 9/07/06A 9/12/06A 7/5/06A 5/20/06A PER Plan date in black Actual date in red

GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Project Overview 7 Presentation 1 of 12 Issues / Liens to Delivery  Current LAT Flight Software does not meet all 183 requirements –LAT environmental testing performed with FSW B0.6.9 Demonstrated 149 / 183 requirements Over 1100 hrs of run time w/ B0.6.9 (over 1600 total hours) Over 800 million events (mainly cosmic muons) processed. Missing final event filters, data compression, GRB support –FSW B0.7.0 installation planned post ship to SASS 173 / 183 requirements (all but on board GRB detection algorithm) FQT of these 173 requirements has been completed on LAT test bed at SLAC. –FSW B1.0.0 installation prior to Observatory test. 183 / 183 requirements  Unexpected reboots of LAT flight computers (SIU / EPU) –Observed 7 reboots in ~ 1600 hours of operations (3 CPUs operating at all times) Probable root cause on about half indicate EGSE source 1 hardware error – transient uncorrectable memory error At least 2 (during TVAC) can not be explained by EGSE - watchdog

GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Project Overview 8 Presentation 1 of 12 LAT Flow – Path Forward T- Bal Pre TV T- Cycle 3 days2 days Weight & CG Remove Radiator s Remove Radiator s Pack and Ship 39 days 9/16/06 PSR 9/15/06 9/07/069/12/067/05/06A CPT Unpack LAT CPT LAT Integration CPT Observatory EMI/EMC CPT Acoustic Test Sine Vibe Sep Shock CPT Ship to Launch Site T- Bal Pre TV T- Cycle CPT LAT FSW Install/Test CPT 3 days1 day 2 days3 days 8 days3 days 9/18/069/23/06 9/28/06 Install Radiator s Install Radiator s 10/01/06 12/15/06

GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Project Overview 9 Presentation 1 of 12 LAT on Test Stand Return from Sine Vibe

GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Project Overview 10 Presentation 1 of 12 Radiators Installed and Micrometeoroid shield exposed Prior to MLI blanket installation – exposed micrometeoroid shield

GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Project Overview 11 Presentation 1 of 12 Installing the MLI Blankets Now, 102 uses for duct tape (actually Ge coated Kapton outer ACD MLI blanket) Final LAT dressing – 2 tone MLI blankets

GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Project Overview 12 Presentation 1 of 12 Prep for TVAC Need to rotate from +Z vertical orientation to +X vertical orientation VCHP need to be horizontal to operate w/ gravity for TVAC

GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Project Overview 13 Presentation 1 of 12 Thermal Test Equipment Sink plates w/ heaters simulate solar load on ACD and other components

GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Project Overview 14 Presentation 1 of 12 Move to TVAC CALROD cages (toaster elements) simulate heat loads on radiators Trolley interfaces w/ rail system in TVAC chamber

GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Project Overview 15 Presentation 1 of 12 LAT on Shipping Container Base Ready to Ship!